| Site: | Hatch |
| Issue date: | 05/12/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20004B114 | List: |
| References | |
| NUDOCS 8105270255 | |
| Download: ML20004B113 (2) | |
See also: IR 05000321/1981011
Text
. *
g retc,
v
o
UNITED STATES
!hg
NUCLEAR REGULATORY COMMISSION
- ; y y [j.. c
REGION 11
o, ., . ,.
[
101 MARIETTA ST., N.W.. SUITE 3100
%
%,,r
ATLANTA, GEORGIA 3o3o3
y
MAY 121981
W
-
\\ p~op/
Georgia Power Company
ATTN:
J. H. Miller, Jr.
2$
nG
3
chef 5f*%
Executive Vice President
- ,.*fe#
?/
270 Peachtree Street
Atlanta, GA 30303
c' '
Gentlemen:
'$h
Subject: Report No s. 50-321/81-11 and 50-366/81-11
This refers to the special safety inspection conducted by Mr. J. J. Lenahan of
this office on April 20-22, 1981, of activities authorized by NRC Ooerating
License Nos. OPR-52 and NPF-5 for the Hatch facility. Our preliminary findings
were discussed with Mr. M. Manry, Plant Manager at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, thJ inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
-
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC Public Document Room. If this report
contains any information that you believe to be proprietary, it is necessary that
you make a written application within 20 days to this office to withhold such
information from public disclosure. Any such application must include the basis
for claiming that the information is proprietary and the proprietary information
should be contained in a separate part of the document. If we do not hear from
you in this regard within the specified period, the report will be placed in the
Public Document Room.
\\% \\
i
(
8105270 Mk
.
.
Georgia Power Company
2
'
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
i
f
f
/
'
,
n. cf ', Ya5gTirTctor
'
<
g
Division of hesident and
Reactor Project Inspection
,
Enclosures:
I
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-321/81-11
and 50-366/81-11
cc w/ encl:
W. A. Widner, t!i.e President and
General Manager-Nuclear Generation
M. Manry, Plant Manager
C. E. Belf'.ower, Site QA Supervisor
.
.