ML20004B113

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-321/81-11 & 50-366/81-11 on 810420-22 & Notice of Violation
ML20004B113
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/12/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20004B114 List:
References
NUDOCS 8105270255
Download: ML20004B113 (2)


See also: IR 05000321/1981011

Text

. *

g retc,

v

o

UNITED STATES

!hg

NUCLEAR REGULATORY COMMISSION

; y y [j.. c

REGION 11

o, ., . ,.

[

101 MARIETTA ST., N.W.. SUITE 3100

%

%,,r

ATLANTA, GEORGIA 3o3o3

y

MAY 121981

W

-

\\ p~op/

Georgia Power Company

ATTN:

J. H. Miller, Jr.

2$

nG

3

chef 5f*%

Executive Vice President

  • ,.*fe#

?/

270 Peachtree Street

Atlanta, GA 30303

c' '

Gentlemen:

'$h

Subject: Report No s. 50-321/81-11 and 50-366/81-11

This refers to the special safety inspection conducted by Mr. J. J. Lenahan of

this office on April 20-22, 1981, of activities authorized by NRC Ooerating

License Nos. OPR-52 and NPF-5 for the Hatch facility. Our preliminary findings

were discussed with Mr. M. Manry, Plant Manager at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, thJ inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

-

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC Public Document Room. If this report

contains any information that you believe to be proprietary, it is necessary that

you make a written application within 20 days to this office to withhold such

information from public disclosure. Any such application must include the basis

for claiming that the information is proprietary and the proprietary information

should be contained in a separate part of the document. If we do not hear from

you in this regard within the specified period, the report will be placed in the

Public Document Room.

\\% \\

i

(

8105270 Mk

.

.

Georgia Power Company

2

'

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

i

f

f

/

'

,

n. cf ', Ya5gTirTctor

'

<

g

Division of hesident and

Reactor Project Inspection

,

Enclosures:

I

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-321/81-11

and 50-366/81-11

cc w/ encl:

W. A. Widner, t!i.e President and

General Manager-Nuclear Generation

M. Manry, Plant Manager

C. E. Belf'.ower, Site QA Supervisor

.

.

. , - - - -._

_

. _ , . _ . ~ . . . , _ - _

-

_. ,

. . - . _ .

y

.-

y...,, . _ . .

, , , , .

-

- - - - - -

- - ,

.