Forwards IE Insp Repts 50-313/81-03 & 50-368/81-03 on 810122-0221 & Notice of Violation
ML20003J196
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 03/16/1981
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20003J190 List:
References
NUDOCS 8105110008
Download: ML20003J196 (2)


See also: IR 05000313/1981003

Text

/ /(,

.

.

[ %g

UNITED STATES

[#

  • k

NUCLEAR REGULATORY COMMISSION

REGloN IV

3kA -//

6'.i RYAN PLAZA ORIVE, . SUITE 1000

h,

,J

ARLINGTON. TEXAS 76011

March 16, 1981

b

hf f $ ,"

/

.

Docket Nos. 50-313/81-03

,/

50-368/81-03

g

IMY 0 4 Iggy ,,, :

Arkansas Power and Light Company

6 "Qgrou [

ATTN: Mr. William Cavanaugh III

C

Vice President of Generation

(

f

,

3%

and Construction

P. O. Box 551

Little Rock, Arkansas

72203

Gentlemen:

This refers to the inspection conducted under the Resident Inspection Program

by Messrs. W. D. Johnson, L. J. Callan and R. G. Spangler, of this office

covering the period of January 22 - February 21, 1981, of activities authorized

by NRC Facility Operating License No. DPR-51 and NPF-6 of the Arkansas Nuclear

One, Units 1 and 2, and to the discussion of the findings by the inspectors

with members of your staff at the conclusion of each segment of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examination of procedures and representatives records, interviews

with personnel, and observations by the inspectors.

During this inspection it was found that certain of your activities were not

conducted in full compliance with NRC requirements.

Consequently, you are

required to respond to this matter, in writing, in &ccordance with the provi-

sions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,

Code of Federal Regulations.

Your response should be based on the specifics

contained in the Notice of Violation enclosed with this letter.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If the

report contains any information that you (or your contractors) 5elieve to De

proprietary, it is necessary that you make a written application to this office

within 25 days of the date of this letter to withhold su:h information from

puolic disclosure.

Any such application must include a full statement of the

reasons on the basis of which it is claimed that the information is proprietary,

and should be prepared so that proprietary infomation identified in the

application is contained in a separate part of the document.

If we do not

hear from you in this regard within the specified period, the report will be

placed in tile Public Document Room.

810 5110 POT-

Q

,

,

.,-

_

-

-

-

- - ,

'

.

,

4

Arkansas Power and Light Company

2

March 16, 1981

,

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

WGNSW

G. L. Madsen, Chief

Reactor Projects Branch

Enclosures:

1.

Notice of Violation

2.

IE Inspection Report Nos. 50-313/81-03

50-368/81-03

cc w/ enclosures:

Arkansas Nuclear One

ATTN:

J. P. O'Hanlon, General Manager

P. O. Box 608

Russellville, Arkansas 72801

.