05000366/LER-1981-026-03, /03L-0:on 810406,during Attempt to Clear High Moisture Content Alarm,Standby Gas Treatment Sys B Heater Would Not Start.Caused by Misconnection of Unlabeled Sensor Cables.Cables Labeled & Reconnected & Procedures Revised

From kanterella
(Redirected from ML20003H965)
Jump to navigation Jump to search
/03L-0:on 810406,during Attempt to Clear High Moisture Content Alarm,Standby Gas Treatment Sys B Heater Would Not Start.Caused by Misconnection of Unlabeled Sensor Cables.Cables Labeled & Reconnected & Procedures Revised
ML20003H965
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 04/30/1981
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20003H963 List:
References
LER-81-026-03L, LER-81-26-3L, NUDOCS 8105080247
Download: ML20003H965 (2)


LER-1981-026, /03L-0:on 810406,during Attempt to Clear High Moisture Content Alarm,Standby Gas Treatment Sys B Heater Would Not Start.Caused by Misconnection of Unlabeled Sensor Cables.Cables Labeled & Reconnected & Procedures Revised
Event date:
Report date:
3661981026R03 - NRC Website

text

-

g

LICENSEE EVENT REPORT CONTROL BLOCK: !

l l

l l

l lh (PLEASE PRINT cR TYPE ALL REEUIRED INFlRMATliN) 1 6

lGlAlElI lH l2 l@l 010l -l 0 l 010 l 0 l 0 l - l 0 l O l@l 4 l 1 l l l 1 l 1 l@l l

l@

o i 7

8 9 LICENSEE CODE 14 lb LICENSE NUMBEH 2b 26 LICENSE TYPE Jo

$ 7 C A I $8 5[H] l Ll@l 0l 5 l 0l 0 l 0 l 3 l 6 l 6 l@l 01410 l 6 l 8 l 1 l@l014 l 3 l 0 l 8 l1 l@

7 8

60 61 DOCKET NUYHER 68 69 EVENT DATE

/4 75 HEPORT DATE 80 EVENT DESCnlPTION AND PROB ABLE CONSEQUENCES h lo l2l l With the reactor at steady state power of 2430 Mut, tne reactor operator l

o 3 l

attempted to clear the high moisture content alarm on "B" SBGT per HNP-l O

l 2-2503, SBGT System Filter Trouble.

"B" SBGT heater would not start. Tech l

[O lsi l Specs Section 3.6.6.1 requires two operable subsystems. This requirement l

0 s l was not met. SBGT Subsystem "A" was operable. The unit was placed in a l

l0l7ll 7 day LC0 as per Tech Specs section 3.6.6.1. The public's health and l

l 0 is l l safety were unaffected.

This event is non-repetitive.

l 80 7

8 9 C DE CODE SU8CO E CO**PONENT CODE Suec 0'E SU E

lol91 lS lC l@ J@ l Zl@ l Z l Z l Z l Z l Z l Z l@ g@ ]@

7 8

9 10 11 12 13 18 19 20 SEQUENTI AL OCCUR RE NCE REFORT REVISION g g qo EVENT YE AR REPORT NO.

CODE TYPE NO.

O y(F,P,g l218lOl

[--_]

l0l2l6l l/l 1013 l lL l

[---J W

R 22 23 24 26 27 28 29 30 31 32 AKr A 1 ON PLANT ET HOURS S B IT D FOR h 8.

SUPPLIER MANI FA TURER b.

[X_J@lGl@

l Z l@

lZ l@

l0l0l0l01 l Y l@

lNl@

[Z_j@

lZl9l9l9l@

33 J4 35 36 3/

40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h li t ol l The event cause was inadequate procedure. Relative humidity sensor cables l

i i i

were swapped when doing HNP-2-3653, SBGT System Operability. The pro-1 i, 12i i cedure had both cables disconnected at one time. The cables, being un-l l i l 31 l marked were reconnected wrong. The cables were labeled, reconnected prop-l lii. i l erly and the procecure revised. "B" SBGT was made operable within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

l 7

8 9 80 A 5

  • . POWER OTHER STATUS iSC Y

DISCOVEHY DESCRIPTION li l s l [E_J@ l 1 l 0 l 0 l@l NA l

l A l@l Operator observation l

AC TIVITY CO TENT RELLASED OF HELE ASE AVOUNT OF ACTivtTY LOCATION OF nELE ASE I i 16 I [JZ_.] @ l Z l@l NA l

l NA l

t 8 9 to 11 44 45 80

  • i RSONNE L F 4POSunES NUYBEH TYPE DE SCHLPTION li I 71 10 I O l 0 l@l Z l@l nA g

80 PEHSONNEtmauSS DEScniP riON@

Nuvst H 10l0l0l@l ng i

i 8 9 11 12 80 l 055 OF LH DAMAGE TO FACILITY '

INPE DE SCHiPTION NA l

l 5 l.,Z_.j@l 8

10 80 PUHL 3Cl T Y o"'v "g

8105080 1 5"'"'

n 68 69 80 7.

R. T. Nix, Supt. of flaint.

mW-M pgggg NAME OF PREPAHEH

i Il LEP. fio. : 50-366/1981-Ciu Licensee: Georgia Power Company Facility: Edwin I. Hatch Docket No. : 50-366 flarrative Report LER flo. 50-366/1981-026.

On April 6,1981, with the reactor at steady state power of 2430 !'ilt, the plant operator attempted to clear a high moisture content alarm on the Standby Gas Treatment Subsystem "B" per HNP-2-2503, Standby Gas Treatment System Filter Trouble.

The "B" SBGT heater would not energize.

S3GT Subsystem "B" was declared inoperative. Technical Specifications Section 3.6.6.1 requires two operable SBGT subsystems, the requirenent was not met.

A seven day limiting condition of optration was initiated per Technical Specifications Section 3.6.6.1.

The public's health and safety were not affected.

This event is non-repetitive.

The cause of this event has been attributed to procedural inadequacy.

Standby Gas Treatment Subsystem "G" relative humidity sensor cables were swapped while performing H!!P-2-3653, Standby 9s Treatment System Opera bi lity.

The procedure called for both the 50% and 70% relative hunidity sensor cables to be at one point disconnected at the same time.

The cables were not labeled and when reconnected they were connected to the wrong sensor. The cables were labeled then connected to the right p

sensor.

The procedure has been revised so only one sensor is removed d

at a time. A generic review of the Unit I procedure revealed that there is no need to remove the cables to the humidity sensors.