Forwards IE Insp Repts 50-348/80-42 & 50-364/80-53 on 801201-31 & Notice of Violation
ML20003H650
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/02/1981
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20003H642 List:
References
NUDOCS 8105060570
Download: ML20003H650 (2)


See also: IR 05000348/1980042

Text

Y

p ur

e

o

UNITED STATES

[ } ) s. Ik

NUCLEAR REGULATORY COMMISSION

g,.g "4

REGION ll

m

.#

o

101 MARIETTA ST., N.W., SUITE 3100

b#

ATLANTA, GEORGIA 30303

.....

MAR 0 21981

O

Alabama Power Company

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birminsham, AL 35291

'ientlemen :

l

Subject: Report Nos. 50-348/80-42 and 50-364/80-53

This refers to the routine inspection conducted by W. H. Bradford of this office

on December 1-31, 1980, of activities authorized by NRC License Nos. NPF-2 and

NPF-8 for the Farley facility.

Our preliminary findings were discussed with

W. G. Hairston at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

These

items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

In addition to the need for corrective action regarding these specific viola-

tions, we are concerned about the implementation of your management control

systems that permitted their occurrence. Consequently, in your reply, you should

describe in particular those actions taken or planned to improve the effective-

ness of your management control systems. Specifically, you should describe what

actions will be taken to identify other safety related systems which contain

field-run piping and which may, due to piping layout drawing ambiguities, have

been built with construction deviations. For these systems, you should further

describe the method which will be used to ensure that construction deviations

do not exist.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC Public Document Room.

If this report

contains any information that you believe to be proprietary, it is necessary that

you make a written application within 20 days to this office to withhold such

information from public disclosure. Any such application must include the basis

for claiming that the information is proprietary and the proprietary information

should be contained in a separate part of the document. If we do not hear from

-

you in this regard within the specified period, the report will be placed in the

Public Document Rooin.

_

'81050606 %

. _ .

_.

m

s

-

.

.

Alabama Power Company -

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely

.

. g .O

o

mes P. O'Reilly

0 rector

Enclosures-.

1.

Appendix A, Notice of Violation

'

2.

Inspection Report Nos. 50-348/80-4

and 50-364/80-53

cc w/ enc 1:

W. O. Whitt, Executive Vice President

F. L. Clayton, Jr. , Senior Vice President

H. O. Thrash, Manager-Nuclear Generation

0. D. Kingsley, Jr. , Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-0perations

Quality Assurance

W. G. Hairston, III, Plant Manager

W. C. Petty, Manager-Quality Assurance

j

(Design and Construction)

.

R. E. Hollands, Jr. , QA Supervisor