Text

-

g.

.

'

  1. o

UNITED STATES

(

8

N

NUCLEAR REGULATORY COMMISSION

REGION 11

y, '

e

s

g

,, f

101 MARIETTA ST N.W..SulTE 3100

ATLANTA, GEORGIA 3o303

'

j'

.....

MAR

3 1981

Florida Power Corporation

ATTN:

J. A. Hancock, Assistant

Vice President

Nuclear Operations

P. O. Box 14042, Mail Stop C-4

St. Petersburg, FL 33733

Gentlemen:

-

SUBJECT: Report No. 50-302/81-01

This refers to the routine safety inspection conducted by T. Stetka of this

office on January 6 - February 2,1981, of activities authorized by NRC Operating

License No. DPR-72 for the Crystal River facility.

Our preliminary findings

were discussed with D. Poole and other members of your staff at the conclusion

of the inspection.

Areas examined during the inspection and our fir. dings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as Appendix A.

Elements to be included in your response are delineated in Appendix A.

In additian to the need for corrective action regarding these specific violations,

we are concerned about the implementation of your management control systems

that permitted their occurrence. Consequently, in your reply, you should describe

in particular those actions taken or planned to improve the effectiveness ' of

'

your management control systems.

l

We have examined actions you have taken with regard to previously identified

'

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

Two new unresolved items are identified in the enclosed inspection report. These

items will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC Public Document Room. If this report contains

any information that you believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold such infor-

mation from public disclosure. Any such application must include the basis for

claiming that the information is proprietary and the proprietary information

8105 060 f 5 0

._

_

__ _.

.

.

.

.

NAR

3 1981

'

Florida Power Corporation

-2-

I

should be contained in a separate part of the document. If we do not hear from

you in this regard within the specified period, the report will be placed in the

Public Document Room.

1

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

m f.l0 % _:_0_0_--

_

ames P. O'Reilly

D* rector

Enclosures:

1.

Appendix A. Notice of Violation

'

'

2.

Inspection Report No. 50-302/81-01

cc w/ enc 1:

.

D. C. Poole, Nuclear Plant Manager