ML20003H446

From kanterella
Jump to navigation Jump to search
Forwards IE Safeguards Insp Rept 50-328/81-17 on 810401-03. No Noncompliance Noted
ML20003H446
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 04/16/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20003H447 List:
References
NUDOCS 8105060002
Download: ML20003H446 (2)


See also: IR 05000328/1981017

Text

MATaut.TIuNSMTTTG HGW

/3' f "eg

CONTMNS 2.790INFORMATBN

W CL

e

4

UNITED STATES

8

9

NUCLEAR REGULATORY COMMISSION

$

$

REGION ll

4

,8,

101 MARIETTA ST

N.W., SUITE 3100

e

ATLANTA, GEORGIA 3o303

.....

APR 161881

<Q*

Tennessee Valley Authority

f e,\\

4

'?

-

iTTN:

H. G. Parris

-

.

Manager of Power

' 4

.g

500A Chastnut Street Tower II

%. pf

-

p

Chattanooga, TN 37401

J

_

/o

-

T/

2

L.

%g

Gentlemen:

e

,

Subject: Report N6328/813

/

This refers to the special safeguards inspection conducted by D. E. Moore of this

office on April 1-3, 1981, of activities authorized by NRC Construction Permit

No. CPPR-73 at Sequoyah facility and to the discussions of our findings held with

J. M. McGriff at the conclusion of the inspection.

Areas examined during this inspection included your program for nuclear material

control and accountability under the applicable provisions of Title 10, Code of

Federal Regulations, Part 70, "Special Nuclear Material," and specific license

conditions. Within these areas, the inspection consisted of selective examina-

tions of procedures and representative records, interviews 'with personnel,

performance tests, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, activities involving safeguards and

security measures are exempt from public disclosure; therefore, the enclosed

inspection report with the exception of the report cover page, which is an

inspection summary, will not be placed in the Public Document Room.

-

I

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

l

Sincerely,

/

v

u:w i y cting Di ector

.

.

Division of esident and

Reactor Project Inspection

-

l

Enclosures:

See Page 2

i

l

MATERLTRANSWTTG HEENH

l

h

8105oeo002

CONTAINS 2.790INFORMATION

,

.

.

.

_

.

s

MATDtlALTRANSWTTED HEREWITH

CONTAIMS 2.700INFORMATION

Tenne:;see Valley Authority

2

APR 161981

Enclosure:

1.

Inspection Report No. 50-328/81-17

(Exempt from Disclosure)

2.

Inspection Summary

(NotExempt)

cc w/ encl:

H. J. Green, Division Director

G. G. Stack, Project Manager

J. M. Ballentine, Plant

Superintendent

J. F. Cox, 3upervisor, Nuclear

-

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

_

_

.

l

l

.

MATERIALTRANSMITTED HEREWITH

CONTA!MS 2.790 liiFDRMAT10N

..

_

.-