f/6

-

'

a p * **%o,i

s

UNITED STATES

e;

.

8

~,

NUCLEAR REGULATORY COMMISSION

3

m

REGION 11

g

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

j

. . . . . g*

e

lQ' f <N-

'

M AR 2 01981

{Y

g

/

g

'

Alabama Power Company

Q^ 9 g' y#

-

-.

4-

&

'

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

o

7 7 W _ X s ,2'

P. O. Box 2641

o'

Birmingham, AL 35291

Gentlemen:

Subject: Report nom 64/81-nD

This refers to the special safety inspection conducted by W. H. Miller, Jr., of

this office on February 24-27, 1981, of activities authorized by NRC License No.

NPF-8 for the Farley facility and to the discussion of our findings held with

W. G. Hairston at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

-10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

,

tion report will be placed in the NRC's Public Document Room.

If this report

contains any information that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this office

to withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

--

document. If we do not hear from you within the specified period, the report

will be placed in the Public Document Room.

8105050 M5

g

.

M AR 2 01981

.

.

.

Alabama Power Company

2

Should you have any questions c"oncerning this letter, we will be glad to discuss

them with you.

Sincerely,

I

-

C

g Director

Division of Resident and

Reactor Project Inspection

i

Enclosure:

Inspection Report No. 50-364/81-03

.

cc w/ encl:

W O. Whitt, Executive Vice President

.

H. O. Thrash, Manager, Nuclear Generation

F. L. Clayton, Jr., Senior Vice President-

W. C. Petty, Manager-Quality Assurance

(Design and Construction)

W. G. Hairston, III, Plant Manager

R. E. Hollands, Jr. , QA c pervisor

u

0. D. Kingsley, Jr. , Manager, Nuclear Engineering

.

and Technical Services

i

!

l

A

--

.