ML20003H298

From kanterella
Jump to navigation Jump to search
Forwards LER 81-046/03L-0
Date released: 01/17/2020 Download: ML20003H298


LER 81-046/03L-0:on 810414,after 1A Loop of RHR Was Placed Into Torus Recirculation Mode for Taking Sample,Snubber 1-E11-4755326 Found to Have Broken Shaft.Caused by Water Hammer Event.Snubber Repaired
ML20003H305
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 04/28/1981
From: Poulk R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20003H305 (2)
Forwards LER 81-046/03L-0
ML20003H297
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 04/28/1981
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20003H297 (1)