ML20003H221
| ML20003H221 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 04/01/1981 |
| From: | Parker W DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20003H216 | List: |
| References | |
| NUDOCS 8105050363 | |
| Download: ML20003H221 (1) | |
Text
^
6 DUKE POWER COMPAMF 9 V l
Powza Bmtorwo 422 Sourn Cnuncu SrazzT, Casar.oTTz, N. C. asa4a
?;. db 3
,rn muau o. eranen,a.
April 1, 1981 Tette oset:AntA704 WCr Persiotut 373-4083 Sitaee Pacouction Mr. James P. - O'Reilly, Directc,e U. S. Nuclear Regulatory Commission
~'
Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re:
RII:DMM 50-269/80-36 50-270/80-32 50-287/80-29 i
Dear Sir:
On March 16, 1981, a telephone discussion was held between Oconee Nuclear S*ation personnel and D. M. Montgomery of NRC/OIE concerning the Duke response of February 27, 1981 to Violation B of the subject inspection report.
Mr. Montgomery was not satisfied with the response for Item 1 of the violation since he felt the Health Physics (HP) procedure was inadequate.
Consequently, the following supplemental response to this item is provided.
Oconee HP will purchase vendor-supplied standards to be used as daily check Upon receipt of these sources, HP will diccontinue use of external
~
sources.
standard ratio methods of measuring instrument performance. Though the vendor has not provided a shipping date for these standards, it is anticipated that the standards should be received by August 1, 1981.
I de-lare under penalty of perjury that the statements set forth herein are true and correct to the best of my knowledge, executed on April 1, 1981.
Ver ruly yours, h N x
h-William O. P rker, Jr.
FTP:scs
[
810 5 05 0N}
_