Revises Response to NRC Ltr Re Violations Noted in IE Insp Repts 50-269/80-36,50-270/80-32 & 50-287/80-29.Corrective Actions:Qa/Qc Procedure Revised to Include Revised Calibr Procedure
ML20003H218
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/06/1981
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20003H216 List:
References
NUDOCS 8105050356
Download: ML20003H218 (2)


Text

..

O DuxE POWER COMPMT -

Powra Butt.Dxwo 422 Socra Causcu Srazzr, CaAntoriz. N. C. asa4a I'-

p WILLIAM O. PAR K ER,.J R.

WCE Patsactu?

Ttttpoecest: Anta 704 s,t.- pmoover.o.

April 6, 1981 27>4ces Mr. James P. O'Reilly, Director U.S. Nuclear Regulatory Consission Region II 101 Marietta Street, Suite 310')

Atlanta, Georgia 30303 Re: RII:DMM 50-269/80-36 50-270/80-32 50-287/80-29

Dear Mr. O'Reilly:

On February 27, 1981, a letter was submitted to your office by Mr. A. C. Thies, Senior Vice President, transmitting the responses to the cited items of non-compliance of the subject inspection report.

Mr. D. M. Montgomery of your office requested additional action concerning the response to Violation B, Item 1.

Please find attached a revised response to Violation B of the subject inspection report.

I declare under penalty of perjury that the statements set forth herein are true and correct to the best of my knowledge,. executed on April 6, 1981.

Va truly yours, m - zo. -

m_m William O. Parker, Jr.

JLJ:pw

- Attachment

,8 81050503 5(2

l DUKE POWER COMPANY OCONEE NUCLEAR STATION lv Revised Response to IE Inspection Report 50-269/80-36, -270/80-32, ~287/80-29 Violation B 5

Violation Item B:

Technical Specification 6.4.1 requires that the station be operated and maintained in accordance with approved procedures and that written pro-cedures with applicable checkoff lists be maintained for radiation con-trol procedures, operation of radioactive waste management system, and nuclear safety-related periodic test procedures.

J Contrary to the above, the station was not operated in accordance with l

written approved procedures in that (1) during the period of September 10, 1980 to December 10, 1980,' the daily performance checks were not per-formed in the manner specified by Procedure HP/0/B/1000/67;.(2) on February 6, 1980 and other occasions, the accuracy performance checks for boron analysis were out of limits and were not repeated as required by Procedure CP/0/B/100/3; and (3) during 1980 some precision control charts for phosphate, boron, and chloride analysis were not dated as required by Procedure CP/0/B/100/3.

i I

This is a Severity Level V Violation (Supplement-I.E.).

I

Response

Item 1:

This item resulted from an administrative / procedural deficiency. The calibration procedure HP/0/B/1003/08 had previously had its performance criteria revised. The QA/QC procedure HP/0/B/1000/67, which covers the j

same operation, had not been similarly revised to include the new criteria.

This procedure was revised on December 24, 1980, to provide performance continuity between the two related procedures.

Oconee HP will purchase vendor-supplied standards to be used aa daily check sources. Upon receipt of these sources, HP will discontinue use of external standard ratio methods of measuring instrument performance.

Though the vendor has not provided a shipping date for these standards, it is anticipated that the standards should be received by August 1, 1981.

i Items The procedure CP/0/B/100/3 was deficient in that it did not specifically 2 & 3:

address a method for documenting corrective action taken when an analysis exceeded control limits. While the documentation of the required rechecks was not performed, we are confident that the rechecks were performed as required.

In addition, personnel involved did not properly date or i

check charts in the procedure. All personnel involved have been counseled on their deficiencies, and all appropriate personnel have.been Pro-trained on proper use of the precision and accuracy control charts.

l cedure CP/0/B/100/3 is being revised to assure adequate quality control l.

in its use and associated documentation. Training will be given to all appropriate personnel on the revised procedure. The procedure revision and training will be' completed by May 1, 1981.

., - + -,, -.

.,,,.-----..-.,,__,,,.,_-,..,,,_,,-...n,.,-,

..nn,,,,n

-,-,,-,.r,.,n.,

,,_-w,,-,,,-,,an

,.n,,,n.,-n.,-n,,,,_,--,,-e w..,-~

-