05000366/LER-1981-025-03, /03L-0:on 810403,loss of Secondary Containment Occurred During Normal Operation.Caused by Inadvertent Drilling Through Containment Wall for Pipe Penetration.Hole Sealed W/Thaxton Plug & Tested

From kanterella
(Redirected from ML20003G618)
Jump to navigation Jump to search
/03L-0:on 810403,loss of Secondary Containment Occurred During Normal Operation.Caused by Inadvertent Drilling Through Containment Wall for Pipe Penetration.Hole Sealed W/Thaxton Plug & Tested
ML20003G618
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 04/23/1981
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20003G615 List:
References
LER-81-025-03L, LER-81-25-3L, NUDOCS 8104300268
Download: ML20003G618 (2)


LER-1981-025, /03L-0:on 810403,loss of Secondary Containment Occurred During Normal Operation.Caused by Inadvertent Drilling Through Containment Wall for Pipe Penetration.Hole Sealed W/Thaxton Plug & Tested
Event date:
Report date:
3661981025R03 - NRC Website

text

............ -..................

n,~ Pu,-, -

(1 11)

LICENSEE EVENT REPORT f

Cor;790L BLOCK: I l

l l

l l lh (PLEAsE PnlNT On TYPE ALL REQUlHED INFOnMATioN) e 6

Mi]lGlAl Ell lH l2 l@150 l 0 l -l 0 l 0 l 0 l 0 l 0 l - l 0 l 0 l@l Al 1! Il ll 11@l l

l@

8 9 LICENSEE CODE 14 LICENSE NUYBER 2b 26 LICENSL TYPE JO

$1 cal b6

  • 7 [Il S$ny l L }@l 0l 5 l 0l 0 ] 0 l 3 l 6 l 6 l@l 014 l 0 l 3 l 8 l 1 l@l0l4l2l3l811l@

7 8

60 GI DOCKET NUMBE R bd 63 EVENT DATE 74 75 REPORT DAT E 30 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h l0 l2l l During normal operation, a loss of Secondary Containment occurred on l

lO i3l l Unit I.

A Limiting Condition for Operation was established on Unit II i

l0 l4j l per Tech Specs 3.6.5-1, which states that Unit I must maintain Secondary l

lO isl l Containment when Unit II is at power. A similar event was reported l

lO lc j l on Reportable Occurrence No. 50-366/1980-142.

Public health and safety l

l0 l7] l were not affected by this incident.

.I I

L o_l'LJ l C E CODE S SCO E COMPONENT CODE SUSC dE SU ODE lO g l Sl Al@ W@ LEj@ l P l E l N l E l T l R l@ O@ { @

7 8

9 10 Il 12 13 18 19 20 SEQUE NTI AL OCCURRENCE REPORT REVISION LER EVENT YE AR REPORT NO.

CODE TYPE N O.

@,ag o/HOl21811l l-l l012iSi M

10 13 i Lt.J l-l [0_J g

22 23 24 26 27 28 29 30 31 32 AC ON O PLANT ET HOURS 22 S 8 IT FORib B.

SUPPLIEF MANUFACTURER 9

lAKEtB lgl34Hj@

l Z l@

W@

l0l0l0lul [Y,J@

l N l@

lAl@

lX19l919l@

33 35 36 3/

40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRFcflVE ACTIONS IiloIl During installation of the Torus Clean-up System, Secondary Containment I

i i I

was inadvertently broken as a pipe penetration was drilled thru the i

~

,, l conteinment wall. The hole was sealed with a Thaxton Plug and Section I

i 3 l "G" of UMP-1-3653, Stand-by Gas Treatment Operability Test, was performed l

l li 141 I and Secondary Containment was proven operable at 1245 on April 3,1981.

I 80 7

8 9 ST S

% POWER OTHER STATUS DISCO RY DISCOVFnY DESCRIPTION l i l s l [E_J@ l 0 l 9 l 6 l@l NA l

[B_j@lOperatorObservation l

'S

' Juvliv CO%NT RELE ASED OF RELE ASE AMOUNT OF ACTIVITY LOCATION OF RELEASE li Ic I LzJ @ LZJ81 NA I

I NA l

7 8 9 -

10 il 44 45 60 PERSONNEL EXPOSURES NUVBER TYPE

DESCRIPTION

li l il l 01 0l ol@l zi@l NA l

EnsO~ m'L,N;UJES P

OtSCRinON@

NUveER I Ol 01 Ol@l NA I

i R Tm 8 9 11 Il 80 l

)

t OSS OF OR DAAtAGE TO FACILITY

/

TYPE DE SCRIP TION

.rA Lzj@l NA l

7 8 9 10 80 I 2 l o l [_tjf@t'!SCn,,1,0N @

8104 300;2M isSUT"""

nne Usc oNoy l

NA l

lIIilIlIlIIIl5 7

8 9 to 68 69 EO g 912-307-7781 2,

nwr nF onreAnrn a. T. fli x. Sunt. o f Main _L neoNe.

/

LER No.: 50-366/1981-025 Licensee: Georgia Power Company facility: Edwin I. Hatch Docket No. : 50-36G

Narrative

Report for LER 50-366/1981-025.

On April 3,1981, with the reactor at 96% power, a loss of Secondary Containment occurred on Unit I. This placed a Limiting Condition for Operation on Unit 11 per Tech Specs Section 3.6.5-1, which states that Unit I must maintain Secondary Containment when Unit II is at power.

A similar event was reported on Reportable Occurrence No. 50-366/1980-142.

Contract personnel were performing required activities for the installation of the Torus Clean-up System.

Secondary Containment was inadvertently broken as a pipe penetration was drilled from the Turbine Building into the Reactor Building. A Thaxton Plug was used to seal the penetration and Section "G" of HNP-1-3653, Stand-by Gas Treatmeat Operability Test, was performed satisfactory and Secondary. Containment was proven operable at 1245 on April 3, 1981.

The generic review did not reveal any inherent problems.

However, to prevent an event of this nature from re-occurring, personnel have been instructed on the proper methods for core drilling when the possibility of breaking Secondary Containment exists.

Public health and safety were not affected by this incident.