ML20003G331
| ML20003G331 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 03/13/1981 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20003G332 | List: |
| References | |
| NUDOCS 8104290052 | |
| Download: ML20003G331 (2) | |
See also: IR 05000298/1981002
Text
/ tc,
[
- * ,,
UNITED STATES
[g
y$
NUCLEAR REGULATORY COMMI'JSION
b_J
,I , %' #
C
REGION IV
-
611 RYAN PLAZA DRIVE. SUITE 1000
\\ l
?
.
h
ARLINGTON. TEXAS 76011
@\\
aQ,
March 13, 1981
p
g
0,,
C.
In Reply Refer To:
_
o,
e
.
Y' c9
!.2
\\
Docket No. 50-298/81-02
L,
-i
V
A
$ iTI
Nebraska Public Power District
v
ATTN: Mr. J. M. Pilant, Director
Licensing and Quality Assurance
P. O. Box 499
Columbus, Nebraska 68601
Gentlemen:
This refers to the inspection conducted by Messrs. G. L. Constable, D. L. DuBois,
T. F. Westerman and R. G. Spangler during the period February 9 - March 6,1981,
of activities authorized by NRC Operating License DPR-46, and to the discussions
of the findings with Mr. L. C. Lessor.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
with personnel, and observations by the inspectors.
During this inspection it was found that certain of your activities were not
conducted in full compliance with NRC requirerrants.
Consequently, you are
required to respond to this matter, in writing, in accordance with the pro-
visions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,
Code of Federal Regulations.
Your response should be based on the specifics
contained in the Notice of Violation enclosed with this letter.
In accordance with Section 2.790 of the.NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If the
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office within 25 days
l
of the date of tnis letter, requesting that such information be withheld from
l
public disclosure.
The application must include a full statement of the
reasons why it is claimed that the information is proprietary.
The application
should be prepared so that any proprietary infomation identified is contained
in an enclosure to the application, since the application without the enclosure
will also be placed in the Public Document Room.
If we do not hear from you
in this regard within the specified period, the report will be placed in the
Public Document Room.
F 104 29 o OS~'
4
_ -_
- _ _ _ _ _ _ _ _ _ _
.
.
Nebraska Public Power District
2
March 13, 1981
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
.
l$$fChW
G. L. Madsen, Chief
Reactor Projects Branch
Enclosures:
i
1.
2.
Inspection Report No. 50-298/81-02
cc w/ enclosure
L. C. Lessor, Superintendent
Cooper Nuclear Station
!
P. O. Box 98
Brownville, Nebraska 68321
,
.
y
- . - .
-
,,
, - - - .
.n
-
,,
-
,.
.-