Text
C
=
,
p gg;
UNITED STATES
/
o
NUCLEAR REGULATORY Commission
[
R EGION I
$
( ., g
,
g
431 PARK AVENUE
f
MING OF PRUS$1 A. PENN5YLVANIA 19406
'
'o
+ ...
Docket No. 50-363
03 E E
Jersey Central Power and Light Company
ATTN: Mr. I. R. Finfrock, Jr.
Vice President
260 Cherry Hill Road
Parsippany, New Jersey 07054
Gentlemen:
Subject:
Inspection No. 50-363/80-02
This refers to the routine inspection conducted by Ms. C. Sakenas of this office
on December 18, 1980 at the Forked River Nuclear Generating Station, Forked
River, New Jersey, of activities authorized by NRC License No. CPPR-96 and to
the discussions of our findings held by Ms. Sakenas with Messrs. J. Greist and
D. Callahan of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Append'x A.
This item of noncompliance
has been categorized into the levels described in the Federal Register Notice
(45 FR 66754) dated October 7, 1980.
The item in the Notice of Violation enclosed with this letter was identified
during previous inspections of your licensed activities on May 20, 1977 and May
23-24, 1978 and was documented in the enclosure to our letters dated June 9,
1977 and July 3, 1978.
Your letters to this office dated June 24, 1977 and July
27, 1978 stated that several areas of the site were scheduled to be seeded
during the fall of 1978.
'
l
From our December 18, 1980 inspection it appears that the stated corrective
actions were not effective since this item has recurred.
Recurrent and uncorrected items of noncompliance are given additional weight in
the consideration and selection of appropriate enforcement action. Therefore,
in your response to this letter, you should give particular attention to those
actions taken or planned to ensure that identified items of noncompliance will
be completely corrected and will not recur.
9 0.4290
.
-,s
-
+
-
e
-
y--.-
- - . -
~ , -
-w---
- - -,-y--
,-
v-
&
--
ww
vg----
v-
-
-s----*--
---%ww
4
- - " - - ,.---
o
.
,
.
Jersey Central Power and Light Company
2
0 3 FEB 1981
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy cf this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any information
that you (or your contractor) believe to be proprietary, it is necessary that
you make a written application within 20 days to this office to withhold such
infonnation from public disclosure. Any such application must be accompanied by
an affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement of reasons
,
which addresses with specificity the items which will be considered by the
Commission as listed in subparagraph (b) (4) of Section 2.790. The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
f
-
Geo ge H Sm1 h,
ief
Fue' Fa ility and Materials
Sa ety Branch
r
Enclosure:
1.
Appendix A, Notice of Violation
J
2.
Office of Inspection and Enforcement Inspection
Report Number 50-363/80-02
cc w/encls:
.