Forwards IE Insp Rept 50-363/80-02 on 801218 & Notice of Violation
ML20003G313
Person / Time
Site: 05000363
Issue date: 02/03/1981
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Finfrock I
JERSEY CENTRAL POWER & LIGHT CO.
Shared Package
ML20003G310 List:
References
NUDOCS 8104290023
Download: ML20003G313 (2)


See also: IR 05000363/1980002

Text

C

=

,

p gg;

UNITED STATES

/

o

NUCLEAR REGULATORY Commission

[

R EGION I

$

( ., g

,

g

431 PARK AVENUE

f

MING OF PRUS$1 A. PENN5YLVANIA 19406

'

'o

+ ...

Docket No. 50-363

03 E E

Jersey Central Power and Light Company

ATTN: Mr. I. R. Finfrock, Jr.

Vice President

260 Cherry Hill Road

Parsippany, New Jersey 07054

Gentlemen:

Subject:

Inspection No. 50-363/80-02

This refers to the routine inspection conducted by Ms. C. Sakenas of this office

on December 18, 1980 at the Forked River Nuclear Generating Station, Forked

River, New Jersey, of activities authorized by NRC License No. CPPR-96 and to

the discussions of our findings held by Ms. Sakenas with Messrs. J. Greist and

D. Callahan of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Append'x A.

This item of noncompliance

has been categorized into the levels described in the Federal Register Notice

(45 FR 66754) dated October 7, 1980.

The item in the Notice of Violation enclosed with this letter was identified

during previous inspections of your licensed activities on May 20, 1977 and May

23-24, 1978 and was documented in the enclosure to our letters dated June 9,

1977 and July 3, 1978.

Your letters to this office dated June 24, 1977 and July

27, 1978 stated that several areas of the site were scheduled to be seeded

during the fall of 1978.

'

l

From our December 18, 1980 inspection it appears that the stated corrective

actions were not effective since this item has recurred.

Recurrent and uncorrected items of noncompliance are given additional weight in

the consideration and selection of appropriate enforcement action. Therefore,

in your response to this letter, you should give particular attention to those

actions taken or planned to ensure that identified items of noncompliance will

be completely corrected and will not recur.

9 0.4290

.

-,s

-

+

-

e

-

y--.-

- - . -

~ , -

-w---

- - -,-y--

,-

v-

&

--

ww

vg----

v-

-

-s----*--

---%ww

4

- - " - - ,.---

o

.

,

.

Jersey Central Power and Light Company

2

0 3 FEB 1981

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy cf this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any information

that you (or your contractor) believe to be proprietary, it is necessary that

you make a written application within 20 days to this office to withhold such

infonnation from public disclosure. Any such application must be accompanied by

an affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement of reasons

,

which addresses with specificity the items which will be considered by the

Commission as listed in subparagraph (b) (4) of Section 2.790. The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

f

-

Geo ge H Sm1 h,

ief

Fue' Fa ility and Materials

Sa ety Branch

r

Enclosure:

1.

Appendix A, Notice of Violation

J

2.

Office of Inspection and Enforcement Inspection

Report Number 50-363/80-02

cc w/encls:

.

M. K. Pastor, Project Manager