ML20003G028
| ML20003G028 | |
| Person / Time | |
|---|---|
| Site: | West Valley Demonstration Project |
| Issue date: | 03/04/1981 |
| From: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Deuster R NUCLEAR FUEL SERVICES, INC. |
| Shared Package | |
| ML20003G023 | List: |
| References | |
| NUDOCS 8104280090 | |
| Download: ML20003G028 (2) | |
See also: IR 05000201/1981001
Text
__
- pn aro
C
o
.
o
UNITE] STATES
85
I ,,
NUCLEAR REGULATORY COMMISSION
$
M<,o
E
REGION I
g *O[e
h
631 PARK AVENUE
KING oF PRUSSIA, PENNSYLVANIA 19406
g*...*,
Docket No. 50-201
0 4 MAR 1931
Nuclear Fuel Services, Incorporated
ATTN: Mr. R. W. Deuster
President
Suite 600
6000 Executive Boulevard
Rockville, Maryland
20352
Gentlemen:
Subject:
Inspection 50-201/81-01
This refers to the routine safety inspection conducted by Mr. J. Roth of this
office on January 12-15, 1981, at your Reprocessing Plant in West Valley, New
York, of activities authorized by NRC License No. CSF-1 and to the discussions
of our findings held by Mr, Roth with Mr. Duckworth and other members of your
staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that une of your activities
was not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
This item of noncom-
pliance has been categorized into the levels describad in the Federal Register
Notice (45 FR 66754) dated October 7, 1980.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosures
will be placed in the NRC's Public Document Room.
If this report contains any
information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 25 days to this office to
withhold such information from public disclosure. Any such application must be
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section
2.790.
The information sought to be withheld shall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room.
<
810 4 2 8 O c>c\\O
.
I
Nuclear Fuel Services, Incorporated
2
0.t. MM EE)
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
(O
'
f
,
.
Geoh ,e Smith, Chief
Fue
Fadility and Materials
Sa ety Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection Report Number
50-201/81-01
cc w/encls:.
J. P. Duckworth, General Manager
.