Monthly Operating Rept for Mar 1981
ML20003F452
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/08/1981
From: Harran G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20003F450 List:
References
NUDOCS 8104210267
Download: ML20003F452 (7)


Text

.

~

AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. 245 UNIT tlnit I DATE 810408 l,

COMPLETED BY - G. liarran a'

TELEPilONE _ (203)447-1791 Ext. 655 MONDI March DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 4

(MWe Net)

(MWe Net) 1 0

0 37 2

0 18 0

3 0

0 39 4

.0 20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

O 24.

i 9

0 25 0

10.

0 0

26 11 0

27 0

12 0

)g o

13 0

0 29 14 0

30 0

15 0

33 0

16 0

?

INSTRUCDONS On this forrnat. list the average' daily unit power levelin MWe Net for each day in the reporting month. Comput the nearest whole megawart.

(9/771 r

8104210 h u

7

.w,..

,,,, ~ ~ -,

~

o o

OPERATING DATA REPORT

~

DOCKET NO. 50-245 DATE 810305

.l'.

C05fPLI5TED !!Y "T203 U. 11a rm TELEPliONE OPERATING STATUS 4

1. Unit Name:

14i11st.one Unit I Notes

2. Reporting Period:

lerch 1981

3. Licensed Thermal Power (MWI):

2011

~

4. Nameplate Rating (Gross $1We):

662 S. Desig,n Electrical Rating (Net MWe): _660

6. hfaximum Dependable Capacity (Gross 51We):

684

7. Af aximum Dependabic Capacity (Net MWe):

654

8. If Changes Occur in Capacity Ratings (Items Number 3 Thrc, ugh 7) Since Last Report.Gise Reasons:

fuA TUA

9. Power Level To which Restricted,If Any (Net MWe):

N/A

10. Reasons For Restrictions. If Any:

N/A N/A N/A

' This Month Yr.-to Date Cumulative

~

I1. Hours In Reporting Period 744 2160

- e. 90624

12. Number Of Hours Reactor Was Critical 0

0 66459.D

13. Reactor Resene Shutdown Hours 0

0 1527.3

14. Hours Generator On Line 0

0 64126.2

15. Unit Resene Shutdown Hours 0

0 26.5

16. Gross Thermal Energy Generated (MWH) 0 0

.114430127.

17. Gross Electrical Energy Generated (MWH) 0 0

38795896

18. Net Electrical Energy Generated (MWH) 0(-278i...

-6/53 37023201

19. Unit Senice Factor 0

0

-7.0.8

20. Unit Avilability Factor 0

0 70.8

21. Unit Capacity Factor (Using MDC Net) -

0 0

62.5

22. Unit Capacity Factor (Using DER Net) 0 0

61.9

23. Unit Forced Outage Rate 0

0 15.4

24. Shutdowns Scheduled Over Next 6 Afonths (Type.Date.and Duration of Each1:

N/A N/A

25. If Shut Down At End Of Report Period. Fstimated Date of Startup:,

April 15, 1981

26. Units in Test St:.tus (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY gjg CO\\DIERCI AL OPTR ATION VIJT 7 6

_.____.a...

UNITSliUTDOWNS AND POWER REDUCTIONS DOCKETNO. 50-245 UNIT N AM E M'liStone i DATE bUAuo REPORT MONTil March COMPLETED 11Y G. r:arran TELEPilONE (203) 447-1791, Ext. 655

's a 2 S

=

c.

.E _::

g 2.s x Licensee E.%

Cause & Corrective c%

No.

Date g;

3g

,3 g 5 Event

T c

3 Action to c53 5

jisj Report #

$0 jU Prevent Recurrence

o 10e 801004 S

744 C

N/A NONE N/A-N/A N/A

(

~

l 9

I I

2 3

4 F: Forced Reason:

S: Scheduled A Equipment Failure (Explain).

Method:

Exhibit C -Instructions 1 -Manual for Preparation of D.;a il Maintenance of Test 2-Manual Scram.

Entry Sheets for Lacer.iee C Refueling 3 Automatic Scram.

Event Report (LER) Fde (NUREC-D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F. Administrative 5

G Operational Error (Explain)

(9/77) liother (Explain)

Exhibit I. Same Source Q

Page 1 of 2 Docket No.

50-245 Date

__S X4Gd Unit hate F.iiistone Unit i Completed By _p.

Rrran

^

Telephone (203) 447-!/91 dxt. cas CORRECTIVE MAINTENANCE SUKv,ARY FOR SAFETY RELATED EQUIPMENT Report Month Ja nua rv DATE SYSTEM COMPONENT MAINTENANCE ACTION

~

1/2/81 Condensate Demin. #318 1-CD-53E-Drain Valve Disassembled, replaced ball and seats and reassembled 1/3/81 RBCCW - #309

'B' RBCCW Heat Exchanger

' Plugged three leaking tubes 1/3/81 Main Steam - #317 MSIV - 2C Disassembled, inspected and installed a new pilot valve seat '

1/6/81 Service Water - #321

'B' Service Water Pump Discharge Replaced instrument bushing Elbow 1/8/81 Atmospheric Control -

Torus /Drywell Vacuum Disassembled - Removed disc, post and nuts

  1. 311 Breaker 1-AC-1A 1-AC-lJ and replaced them.

Reassembled 1/8/81 Atmospheric Control -

Breaker 1-AC-5,6,7,9,12 Removed and reinstalled valv'es in the

~

  1. 311 opposite direction such that the valve seat ring ~ is away from the Drywell.

1/10/81 Service Water - #321 Pume 'C' Reassembled with.new connector. bearings, shafts, shaft tubes and tube tension nuts 1/13/81 Atmospheric Control -

1-AC-10 Replaced valve 0-rings, rubber seat packing

  1. 311 and reassembled.

1/14/81 Misc. - #245 Drywell Personnel Air-Lock Replaced door gaskets, fixed hand wheel and greased all fi'ttings.

1/14/81 Control Rod Drive-Scram Pilot Valves Cleaned internal, installed new teplacement i

  1. 302 kits on 10 modules.

1/16/81 FWCI - #334 FWCI Emergency Cond.

Installed a floty restricting orific. in the Transfer Pump Flow Measurement two FWCI Cond.' transfer pump discharge lines. ~

1/16/81 LPCI - #335 1-LP-10B Inspected valve internals e

6

Page 2 of 2 Docket No.

50-245 Date 800406 Unit Name F.iiistone unit 2 Completed By G. Harran Telephone (203) 447-1/91 txt.

CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT Report Month January DATE SYSTEM COMPONENT MAINTENANCE ACTION

~

1/22/81 Atmospheric Controls-1-AC-ll Inspected valve internals and

  1. 311 reassembled with new 0-rings and seat rings 1/23/81 Condensate Demin. -

1-CD-53E Inspected valve internals

  1. 318 1/27/81 Gas Turbine - #339 Gas Turbine Air Start Valve Removed old valve' anti installed a new one J

b b

6

~-.s.._..

s

~

O

?

.e 8

=

?

l

Page1 of 1 Docket No. sn_ n q Date 70'0E8 Unit Name Milistona Uni-t i Compl eted By _ G. Farran MECHANICAL Telephone _(203) 447-179' Ext. 1 CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT Report Month February 1981 DATE SYSTEM COMPONENT MAINTENANCE ACTION 303 Failed.LLRT-Disassembled-Reground seats,- fit 2-5-81 Clean Up 1-CUs2 Wedge Reassembled 2-5-81 315 Broken Stem - Rep' laced steam. wedge and repacked Condensate 1-CN-120 s

307 Installed'new 1/2" Nylock bolts from. operator 2-6-81 Iso. Coad.

1-IC-4 Operator Yoke to f.lange on valve i

2-11-81 310 Disassembled pump-inspected internals-replaced Fuel Pool-

"A" Fuel Pool Cooling Pump Inboard and outboard bearings', mech. seals-Reassembled

~

302 Module 26-11 Disassembled valve, removed old 0-rings-cleaned

'! 2-18-81 CRD

.123 Valve Installed new 0-rings - Reassembled 302 Module 02-19 Disassembled valve, removed old 0-rings-cleaned 2-18-81 CRD.

120 Valve Installed new 0-rings - reassembled 321 "C'" S. W. Disch. CK. Valve' Disassembled valve-found stud pulled out of disc j2-18-81 Service Water Nut and flat washer missing - installed new disc, stud, flat washer, & nut - reassembled.

335 Removed heads - devconed' groove around tube sheet

~

l 2-28-81 L.P.C.I.

'A" LPCI Hx and installed new zincs - reinstalled heads i*

e

,a l

Docket No. 50-225 Page 1 of 1 Date 600106 Unit Name Mi11stene Uni t i Completed By G. Harran Telephone (203) 447-1791 txt. dt CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT Report Month March 1981

~

DATE SYSTEM COMPONENT MAINTENANCE ACTION 302 Module 06-15

- '2-2-81 CRD Solenoid Valve Replaced Solenoid valve 310 Fuel Pool Cooling Control Replaced relay socket for "RA" reley on panel 2,-9-81 Fuel Pool Circui t 2215 31.1 Failed LLRT-Disassembled, cleaned, installed new 3-2-81 Atmospheric Control 1,- AC-7 seat ring, packing & misc. 0-rir.gs & reassembled-329 l-SG-28 Disassembled, cleaned, inspected and reassembled 3-3-81 Standby Gas Treatment Air Actuator 344 Switchyard Backup Battery Replaced burnt circuit breaker on D.C. output 3-5-81 125 VDC Elect. Sys.

Charger and repaired. burnt wiring 309 1-RC-66A 3-14-81 RBCCW Replaced old valve & nipple 311 Failed LLRT-Disassembled, cleaned, installed new 3-18-81 Atmospheric Control 1-AC-14 internals & reassembled 336 3-22-81 Core Spray 1-CS-21B Checked motor for tigntness.

Operated valve for

' proper indication, checked out torque switch, installed Nyloc cap screws and changed Sealtite on motor leads.

3-23-81 336 Removed operator

.disassembied and replaced bent Core Spray 1-CS-21A Op'rator 309 Take Off Shaft (that drives the limit switches) -

e Disassembled motor., checked. bearings, cleaned 3-24-81 RBCCU "A" Pump Motor Sealed bearing caps & re-installed j

315 "A" Cond. Bstr Pump Disassembled in board bearing and modified for 3-26-81 Condensate forced lube oil system & reassembled 302 Module 26-19 Removed accumulator S/N A2668 and. installed new 3-31-81 CRD Ac'cumulator Accumulator C0182 311 Cap Nitrogen Make Up Jeided in four (4) caps for Line Ac3 6 /ws 3,31-81 Atmospheric Control System

-