Forwards IE Insp Repts 50-424/81-02 & 50-425/81-02 on 810106-09 & Notice of Violation
ML20003F341
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/13/1981
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20003F332 List:
References
NUDOCS 8104200633
Download: ML20003F341 (2)


See also: IR 05000424/1981002

Text

k),

UNITED STATES

NUCLEAR REGULATORY COMMISSION

si'

REGION 11

U

f

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 3o303

~

FEB 131981

-

Georgia Power Company

ATTN:

J. E. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

Subject: Report Nos. 50-424/81-02 and 50-425/81-02

~.

This refers to the routine inspection conducted by W. P. Kleinsorge of this

!

office on January 6-9, 1981, of activities authorized by NRC Construction Permit

l

Noa. CPPR-108 and CPPR-109 for the Vogtle facility. Our preliminary findings

were discussed with K. M. Gillespie at the conclusion of the inspection.

'

,

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observ'ations by the inspector.

Durir:g the inspection, it was found that certain activities under your license

appear to violate NRC requirements. These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

,

Appendix A.

'_

-

-=

.

l

In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter r.nd the enclosed inspec-

tion report will be placed in the NRC Public Document Room.

If this report

contains any information that you believe to be proprietary, it is necessary

that you make a written application within 20 days to this office to withhold

such informatica from public disclosure. Any such application must include the

'

'

basis for claiming that the. information is proprietary and the proprietary

. . .

information should be contained in a separate part of the document. If we do

not hear from you in this regard within the specified period, the report will be

placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

f

Y

'

C. E. Murlehy, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

(See Page 2)

810.420 0 GM

'

.

- .

- .

.

-

-

- .

.

._

.

..

_

,

,

.

.

-

'

.

Georgio Pawar Comprny

-2-

g g 3 jggj

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-424/81-02

and 50-425/81-02

cc w/ encl:

K. M. Gillespie, Construction

Project Manager

E. D. Groover, QA Site Supervisor

D. E. Dutton, Project General Manager

-