ML20003F335

From kanterella
Jump to navigation Jump to search
Suppls Response to NRC 810213 Ltr Re Violations Noted in IE Insp Repts 50-424/81-02 & 50-425/81-02.Addl Clarification Re Corrective Actions Provided
ML20003F335
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/20/1981
From: Dutton D
GEORGIA POWER CO.
To: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20003F332 List:
References
GN-120, NUDOCS 8104200621
Download: ML20003F335 (2)


Text

'

  • \

O -

~~~v m n- ;,=.

o p)= ,g y' -

Post Ofnce Box 4545 Atlanta, Georga 30302 T * ,n m 522- m m I r , 25 .: . I - Vogtle Project Southem Conpany Services, Inc.

Poet OfRce Box 2625 Birnungham, Alabama 352o2 Telephone 205 870-6011 March 20, 1981 United States Nuclear Regulatory Commission

REFERENCE:

Office of Inspection and Enforcement IE: II: WPK Region II - Suite 3100 50-424/81-02 101 Marietta Street 50-425/81-02 Atlanta, GA 30303 File: X7BG10 Attention: Mr. C. E. Murphy Log: GN-120 Gentlemen:

Further to my March 11, 1981 letter, Georgia Power Company wishes to submit the following additional clarifications concerning the violations discussed in your inspection report 50-424/81-02 and 50-425/81-02.

A.1 The reason the welding procedure did not specify the welding parameters was because the manufacturer's recomeaded approxi-mate welding parameters were printed on the stud arc welding machine. These were used in lieu of a welding procedure speci-fication.

A.3 The reason for not having qualification data available at the time of the inspection was due to misplacing the data that once was available.

B.1, 2,3,4 The reason for the Level VI violation listed in Section B, sub items 1 thru 4, of Appendix A of your report was: Georgia Power and our contractors were of the opinion that our program was in compliance with code requirements. We are taking steps to strengthen our program as indicated in our March 11, 1981 letter.

B.4 To reinforce our welder qualification program Chicago Bridge and Iron performs 100% radiography of the first 10 feet of each welders work. Therefore, we are assured of the welder's quali-fication even if coupons identified were questionable.

810.4 2 0 0(p$l

  • Mr. C. E. Murphy IE: II: WPK .

50-424/01-02; 50-425/81-02 March 20, 1981 Page 2.

C.1. The reds located in the two: portable rod ovens identified as

-inoperable were destroyed, rul yo , j Dou n Project General Manager CWH:tp STATE OF GEORGIA COUNTY OF FULTON Doug Dutton states that he is Project General Manager of Georgia Power Company's Vogtle Project and is authorized to execute this oath on behalf of Georgia Power and that to the best of his knowledge and belief the facts set forth .in this letter are true.

1 If .

GPC: W -C Doug Du on' di k Sworn to and subscribed before me this 20th day of March,1981.,

L'K hack Notary Public N % Georsta. Stok At Larp MZ % f@lres Mar. 21.190%