Text
4
s
.
..
,
,
f **%q'o,%
4
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
o
4g
r
N
y,
i
REGION Il
s'
g
f
101 MARlETTA ST., N.W SUITE 3100
pp
4
N
g
ATLANTA, GEORGIA 30303
[j
1
g %,.
,
L
y
-
JAN 0 31981
5:
m
.
m R 161981 m re
Carolina Power and Light Company
h
v.3, % ,s,e,,
,
6
ATTN:
J. A. Jones
am
s*
Senior Executive Vice President and
s'S
D
Chief Operating Officer
y
gD
411 Fayetteville Street
=
Raleigh, NC 27602
Gentlemen:
Subject: Report Nos. 50-325/80-42 and 50-324/80-39
.
This refers to the routine inspection conducted by G. A. Belisle and others of
this effice on October 20-24, and 27-31, 1980, of activities authorized by NRC
Operating License Nos. DPR-62 and DPR-71 for the Brunswick facility.
Our
,
preliminary findings were discussed with L. W. Eury, B. J. Furr and T. S. Elleman
at the conclusion of the inspection. Based on our concerns, I met with you and
members of your staff at Raleigh, NC on November 13, 1980 to discuss the results
of this inspection.
This inspection was a comprehensive examination of your management and quality
assurance controls re11ted to licensed activities. Inspection was conducted in
selected key areas of responsibility at both the plant site and your corporate
offices. Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appendix A.
Elements to be included in your response are delineated in Appendix A.
In addition to the need for corrective action regarding these specific violations,
we are concerned about the implementation of your quality assurance program that
permitted their occurrence. Consequently, in your reply, you should describe in
I
particular those actions taken or planned to improve the effectiveness of your
l
quality assurance program.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
One new unresolved item is identified in the enclosed inspection report. This
item will be examined duriag subsequent inspections.
i
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be plued in the NRC Public Document Room. If this report contains
any information that you believe to be proprietary, it is necessary that you make
810 4200 M
m
-
V
<
.
- ..
.-
- -
..
.
.
.
.
,
.
Carolina Power and Light Company
-2-
JAN 0 91981
a written application within 20 days to this office to withhold such information
from public disclosure. Any such application must include the basis for claiming
that the information is proprietary and the proprietary information should be
contained in a separate part of the document.
If we do not hear from you in
this regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
mi 0~
-
mes P. O'Reilly
D ector
Enclosure (s):
1.
Appendix A, Notice of Vi
io
2.
Inspection Report Nos. 50-325/80-42
and 50-324/80-39
cc w/ encl:
A. C. Tollison, Jr., Plant Manager