IE Insp Repts 50-369/81-07 & 50-370/81-02 on 810203-06. Noncompliance Noted:Failure to Establish Adequate Measures to Control Storage of Equipment to Prevent Damage
ML20003F214
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 03/04/1981
From: Herdt A, Kleinsorge W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20003F204 List:
References
50-369-81-07, 50-369-81-7, 50-370-81-02, 50-370-81-2, NUDOCS 8104200403
Download: ML20003F214 (9)


See also: IR 05000369/1981007

Text

'

[guer

-

'o,

UNITED STATES

.

3

'n

NUCLEAR REGULATORY COMMISSION

$

E

,

REGION 11

e'f

101 MARIETTA ST., N.W., SulTE 3100

g

ATLANTA, GEORGIA 30303

'

Report Nos. 50-369/81-07 and 50-370/81-02

Licensee: Duke Power Company

422 South Church Street

Charlotte, NC 28242

Facility Name: McGuire

Docket Nos. 50-369 and 50-370

License Nos. NPF-9 and CPPR-84

Inspection at McGuire site near Charlotte, North Carolina

M/

/

Inspect :

W. P. Kleinsor' e

Date

Approved by:

/

2

/

kM8/

A. Her'dt, Chief,' M&P Section, El Branch

Date

ETI Division

SUMMARY

Inspection on February 3-6, 1981

Areas Inspected

This routine, unannounced inspection involved 29 inspector-hours onsite

in the areas of licensee action on previous inspection findings (Unit

2), storage of installed equipment (Unit 2), marking (Unit 2), containment

Structural Steel Welding) - observation of work and work activities

Unit 2), reactor coolant. pressure boundary piping - observation of work

and work activities (Unit 2); reactor coolant pressure boundary piping -

review of quality records (Unit 2), safety related piping - observation

of work and work activities (Unit 2) and licensee identified items

(50.55(e)) (Units 1 and 2).

Results

'

Of the ten areas inspected, no violations or deviations were identified

in eight areas; two violations were found in two areas (Violation -

Failure to Establish Adequate Controls for Storage of Installed Equipment

Paragraph 5.b; Violation - Nonconforming CMTR - Paragraph 11.b(1)).

81042Ogyoh

'

.

.

.

DETAILS

1.

Persons Contacted

Licensee Employees

  • J. C. Rogers, Project Manager
  • E. B. Miller, Senior QA Engineer
  • T. E. Touchstone, Senior Construction Engineer

,

  • J. W. Willis, Project QA Engineer
  • R. M. Gillespie, Senior QA Technician
  • G. B. Robinson, QA Engineer, Mech.

Other licensee employees contacted included construction craftsmen,

technicians, and office personnel.

Other Organizations

  • L. F. Horner, Authorized Nuclear Inspector
  • Attended exit interview.

2.

Exit Interview

The inspection scope and findings were summarized on February 6,

1981 with those persons indicated in paragraph 1 above.

The violations,

unresolved items and the inspector followup item were discussed in

detail.

No dissenting comments were received from the licensee.

3.

Licensee Action on Previous Inspection Findings

(Closed) Infraction 370/80-03-01 " Paint Contamination on Filler

Metal Wire Surface." Duke letter of response dated June 25, 1980

has been reviewed and determined to be acceptable by Region II.

-The inspector. held discussions.wi.th project manager and. examined

the corrective actions as state'd in the letter of response.

The

~

I

inspector concluded that Duke had determined the full extent of the

'

subject noncompliance, performed the necessary survey and follow-up

actions to correct the present conditions and developed the necessary

corrective actions to preclude recurrences of similar circumstances

have been~ implemented.

(Closed) Infraction 370/80-01-01:

" Undersize Socket Welds".

Duke

letter of response dated April 10, 1980 has been reviewed and

determined to be acceptable by Region II.

The inspector held

discussions with project manager and examined the corrective actions

ss stated in the letter of response.

The inspector concluded that

Duke had determined tF.e full extent of the subject noncompliance,

performed the necessary survey and follow-up actions to correct the

present conditions and developed the necessary corrective actions

t

.

_

'

.

e

-2-

.

to preclude recurrence of similar circumstances.

The corrective

actions identified in the letter of response have been implemented.

This matter is further discussed in paragraph 12.

4.

Unresolved Items

Unresolved items are matters about which more information is required

to determine whether they are acceptable or may involve noncompliance

or deviations.

New unresolved items identified during this inspecti'on

are discussed in paragraph 5.c and 6.b(1).

5.

Independent Inspection Effort (Unit 2)

a.

Construction Progress

The inspector conducted a general inspection of the Unit 2

fuel, auxiliary and reactor buildings and welding material

issue station to observe construction progress and construc-

tion activities such as welding, material handling and con-

trol, housekeeping and storage,

b.

Storage of Installed Equipment

With regard to the inspection of paragraph 5.a, the inspector

on February 3-6, 1981, accompained by a representative of the

licensee, noted the following in the Unit 2 reactor and aur.iliary

buildings:

(1) Four examples of rigging from installed safety rela:ed

piping.

(2) Three examples of rigging lines impinging on cable trays

or cables in trays.~ In each case the r.igging lines

distorted the trays or cables in the trays. ~

'~

(3) Approximately eight examples of material (structural

steel, piping assemblies, piping fittings and buckets)

stored in cable trays containing cables.

(4)

Five examples of scaffolding supported by safety related

piping.

The licensee stated that they control scaffolding on, or

rigging to installed piping by the " good judgement of the

craft".

Rigging line impingement on cable trays and cables is

controlled also by craft judgement.

The licensee further

_

-

.

.

-3-

-

stated that storage of materials in cable trays was controlled

by housekeeping inspections.

The inspector informed the

licensee that the above indicated inadequate controls for

storage of installed equipment.

Failure to establish controls

for storage of equipment in accordance with instructions to

prevent damage, is in violation of 10 CFR 50 Appendix B,

Criterion XIII.

The above violation vall be identified as

370/81-02-01:

" Failure to Establish Adequate Controls for

Storage of Installed Equipment".

c.

Markings

With regard to the inspection of paragraph Sa the inspector

noted numerous examples of extraneous markings on installed

stainless steel tanks and piping.

The inspector stated there

was no reasonable assurance that the extraneous markings were

produced with the approved marking materials contained in CP

538.

The licensee indicated that they would look further into

the matter.

The inspector stated that the above would be an

unresolved item, identified 370/81-02-04: " Extraneous Markings

on Safety Related Stainless Steel".

Within the areas examined no violations or deviations were

identified except as described in paragraph Sb.

6.

Containment (Structural Steel Welding) - Observation of Work and

Work Activities (Unit 2)

The inspector observed field welding activities associated with

-

steel containment structures and steel supports for major equipment

within the containment at various stages of weld completion.

The applicable Code for containment miscellaneous structural steel

support structure is'AWS D1.1-80.

'

The inspector observed'wel' ding' activities where welding was in

~

a.

'

progress to determine conformance with specifications and

j

procedures in the areas of; weld identification, specified

weld procedures, qualified welders, specified weld material,

!

specified purge (if applicable); repair procedures, specified

NDE being performed and periodic checks of welding variables.

(1)

Containment ' Structures

Weld' Joints

Structural Steel Support

2-SF-E-5

Structure

(2)

Structural Support

Weld Joints

Steam Generator

2-SC-22

Upper Lateral Supports

~

.

.

.

-4-

b.

Observation of weld material control included; identification,

segregation, oven temperatures, issue slips and control of

unused material at issue stations and work areas:

(1) With regard to the above inspection, on February 5, 1981,

it was noted that low hydrogen electrodes intended for

safety related structural application were reconditioned

in baking ovens.

Construction Procedure 92, Rev. 4

" Care, Handling at:d Reconditioning of Low Hydrogen Electrodes"

requires type E7018 electrodes to be baked at a temperature

of 725 F + 25 F.

The licensee stated that they were not

_

aware of any temperature verification, independent of the

oven system, to assure compliance to procedural temperature

requirements.

The licensee indicated that they would

look further into the matter.

The inspector stated that

the above would be an unresolved item identified as

370/81-02-03:

" Temperature Control of Baking Oven".

c.

During observation of welding activities there appeared to be

a sufficient number of qualified inspection personnel at the

work site.

Within the areas examined, there were no violations or deviations

identified.

7.

Safety Related Structures - Observation of Work and Work Activities

(Unit 2)

The inspector observed field welding activities associated with

safety related structures and supports outside containment during

various stages of weld completions.

Observations were made in order

to determine whether the requirements of applicable specifications,

standards, work and/or inspection procedures are being met for the

activities involved and in .the following stages of weld completion..

a.

The inspector examined weld joints where welding is in process

to determine whether weld identification, weld procedures,

welder qualification, weld material, defect removal (if appli-

cable), specified NDE, and periodic checks of welding variables

j

are in conformance with existing requirements.

Drawing No.

Structure

MC-1220-146, Rev. 2

Main Steam Isolation Valve

Access Platform

The applicable code for safety related structural welding out

,

side of containment is AWS D1.1-80.

i

~

.

.

.

-5-

b.

Observation of weld material control included; identification,

segregation, oven temperatures, issue slips and control of

unused material at issue stations and work areas.

c.

During observation of welding activities there appeared to be

a sufficient number of qualified inspection personnel at the

work site.

Within the areas examined, there were no violations or deviations

identified.

8.

Reactor Coolant Pressure Boundary Piping - Observation of Work and

Work Activities (Unit 2)

The inspector observed field welding of reactor coolant pressure

boundary piping at various stages of weld completion.

The applica-

ble Code of reactor coolant pressure boundary piping is ASME B and

PV Code Section III 1971 Edition with Addenda through the Winter

1971.

a.

The inspector examined the following welds where nondestruc-

tive testing (NDE) had been accomplished to determine surface

suitability, specified NDE being performed and with qualified

personnel. The below listed joints, records, and radiographs

were examined:

Weld Joint

Size

System

NI-2F-560

10"

Safety Injection

NC-2FW-24-7

6"

Reactor Coolant

NC-2FW-24-1

10"

Reactor Coolant

The inspecto'r obse'ved activities at weld material issue

b.

r

str.tions to determine adequacy of; weld material storage /

segregation, oven' temperatures, ! issue records and return of

l

unused weld material.

Also,the inspector observed work areas

for uncontrolled weld material.

l

Within the areas examined, there were no violations or deviations

f

identified.

l

9.

Reactor Coolant Pressure Boundary Piping - Review of Quality Records

i

(Unit 2)

,

The inspector reviewed the quality records described below relative

l

to reactor coolant pressure boundary pipe welding to determine

l

whether these records reflected work accomplishment consistent with

j

NRC requirements and SAR commitments.

For the applicaole code see

paragraph 8.

,

1

.

[

-.

-

_

___

-

--

~

.

.

-6-

.

a.

The following completed weld records were reviewed in the

i

areas of; visual and dimensional inspections, weld history,

preheat and interpass temperature, stress relief, NDE, weld

repair, welder qualification, and inspector qualification, as

applicable to each weld:

Weld Number

Pipe Size

System

NI-2F-560

10"

Safety Injection

NC-2FW-24-7

6"

Reactor Coolant

NC-2FW-24-1

10"

Reactor Coolant

,

b.

The welding material records, for the joints listed in paragraph

-

9a, relative to; receipt inspection, weld material certification,

'

issue ?.nd storage control, and disposition of unused materials

were revieu d.

c.

With regard to the above inspection and the inspection of

,.

'

paragraph 11.b the inspector noted that as listed below,

qualification examinations and the eye examination records for

the dates indicated, were not retrievable.

Inspector I,D.

Note

PJH-PT-Level II

No Qualification Examination

HAD-MT Level II

No Qualification Examination

,

'

and no Eye Examination Record

for 4-3 78

TLT-PT Level II

No Qualification Examination

,

TDT-Welding Inspector

No Qualification Examination

KWK-Welding Inspector

No Qualification Examination

TOB-Welding Inspector

No Qualification Examination

and No Eye Examination for

,

4-9-79

Th'e licensee indicated 'tihat a'll' the above' inspectors were

qualified at Duke sites other than McGuire and that the missing

records were at the site of qualification.

The licensee

stated that they would retrieve the records for a future inspec-

tion.

The above is an inspector followup item identified as

i

370/81-02-05:

"Non-Retrievable NDE Personnel Records".

Within the areas examined, there were no violations or deviations

identi fied.

,

10.

Safety Related Piping - Observation of Work and Work Activities

(Unit 2)

i

The inspector observed field welding of safety-related piping

outside the reactor coolant pressure boundary at various states of

weld completion.

For the applicable code see paragraph 8.

.. . _ - - -

-

..

. -

-

-,

. _ _ _---

--_.-__-

--,

_

.

.

.'

-7-

The

nspector examined the following welds where non-destructive

a.

test'ng (NDE) had been accomplished to determine; surface

suitability, specified NDE being performed and with qualified

personnel.

The below listed joints, records, and radiographs

were examined.

Joint Number

Size

System

2NDP-127-2

8"

Residual Heat Removal

2NVP-187-1

2"

Chemical and Volume

Control

b.

The inspector observed activities at weld material issue

stations to determine adequacy of; weld material storage /

segregation, oven temperatures, issue records and return of

unused weld material. Also, the inspector observed work areas

for uncontrolled weld material.

Within the areas examined, there were no violations or deviations

identified.

11.

Safety Related Piping (Welding) - Review of Quality Records (Unit

2)

The inspector reviewed the quality records described below relative

to safety related pipe welding to determine whether these records

reflected work accomplishment consistent with NRC recc'irements and

SAR commitments.

For the applicable code see paragrapn 8.

a.

The following completed weld records were reviewed in the

. areas of; visual and dimensional inspections, weld history,

preheat and interpass temperature, stress relief, NDE, weld

repair, welder qualification, and inspector qualification, as

applicable to each weld:

Weld Number.

aSize

System

.

..

CF-2FW-49-8

2"

Feedwater

CF-2FW-49-9

2"

Feedwater

2NDP-127-1

8"

Residual Heat Removal

2NDP-127-2

8"

Residual Heat Removal

2NVP-187-1

2"

Chemical and Volume Control

NV2FWFE-5310-7

3/4"

Chemical and Volume Control

CA-2F-269

8"

Aux.'Feedwater

CA-2F-82

8"

Aux. Feedwater

2NCP-50-5

2"

Reactor Coolant

2NCP-50-6

2"

Reactor Coolant

b.

The welding material records for the joints listed in paragraph

lla, relative to; receipt inspection, weld material vertifica-

.

.

. . '

'

'

-8-

,

tion, issue and storage control, and disposition of unused

materials were reviewed.

(1) With regard to the above inspection, the inspector, on

February 5,1981 noted that the Certified Material Test

Report (CMTR) for type 308 consumable weld insert material

heat No. D 3403R308, used in ASME Class 2 Chemical and

Volume Control System weld joint No. 2fNp-187-1 did not

conform to the requirements of ASME B and PV Code Section

II, Part C, SFA-5.9.

SFA-5.9, Table 1, Note 1 states:

" Analysis shall be made for the elements for which specific

values are shown in this table.

If, however, the presence

of other elements is indicated in the course of routine

analysis, further analysis shall be made to determine

that the total of these other elements, except for iron,

is not present in excess of 0.70 per cent."

The total of other elements except iron was 0.744 per

cent for the material represented by the above CMTR.

The

above CMTR represents 3700 ft of material.

Therefore, it

appears nonconforming material was installed in the

plant.

Failure to fabricate and inspect systems to

quality standards commensurate with the importance of the

safety (a)nction to be performed is in violation of 10 CFR

fu

50.55a

(1).

The above violation will be identified as

370/81-02-02:

" Nonconforming CMTR."

Within the areas examined, there were no violations or deviations

identified, except as described in paragraph 11.b(1).

12.

Licensee Identified Items (50.55 (e)) (Units I and 2)

a.

(Closed) Item 370/80-06-09 " Socket Welds Do Not Meet Appliable

. Quality Standards" (10 CFR 50.55(e)).

On April 3, 1980, Duke

notified IE:II of a 50.55(e) item concerning under size socket

welds. .The Construction Deficiency Report was submitted on

May 2,'1980.

The~ report'ha's been review and determined to be

acceptable by IE:II.

The inspector held discussions with the

responsible licensee representative, reviewed supporting

documentation, and observed representative samples of work to

verify that the corrective action identified in the report

have been completed.

This item is closed.

b.

(0 pen) Item 369/80-10-10 " Socket Welds Do Not Meet Applicable

Quality Standards".

(10 CFR 50.55(e)).

On April 3, 1980,

Duke notified IE:II of a 50.55(e) item concerning under size

socket welds.

The final Construction Deficiency Report was

submitted on May 2, 1980.

The report has been reviewed and

determined not be acceptable by IE:II, because the licensee's

sampling plan for thin wall flange socket joint and non-flange

socket joint acceptability covered Unit 2 only.

The licensee

indicated that they would look further into the matter.

This

item remains open.

,

'