Forwards IE Insp Rept 50-382/81-02 on 810116-0215.No Noncompliance Noted
ML20003E939
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/11/1981
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Aswell D
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20003E940 List:
References
NUDOCS 8104170538
Download: ML20003E939 (2)


See also: IR 05000382/1981002

Text

bec to DAC:ADi C ~

~

CENTRAL FILES

  1. ^ *%

UNITE 3 STATES

POR:HQ

q

NUCLEAR REGULATORY COMMISSION

OR

., 4 * ' . - l

REGION IV

gg{g

?

-

611 RYAN PLAZA ORIVE SUITE 1000

..

% , ,' ', , *

ARUNGTON. TEXAS 76011

ggggg

March 11, 1981

In Reply. Refer To:

Docket No. 50-382/81-02

m

V

o>

a@r %

"

Louisiana Power and Light Company

_

APRJ 3 081A dI

ATTN:

D. L. Aswell, Vice President

S-

l

Power Production

~

u.,, DJ@^mer

,/

142 Delaronde Street

New Orleans, Louisiana

70174

b

Gentlemen:

7%

This refers to the inspection conducted under the Resident Inspection Program

by Mr. G. L. Constable of our staff during the period January 16, 1981 -

February 15, 1981, of activities authorized by NRC Construction Permit No.

CPPR-103 for Waterford Steam Electric Station, Unit No. 3, and to the dis-

cussions of the findings with 0. 3. Lester at the conclusion of the inspection.

Principal areas examined during the inspection included:

(1) Operational

Staffing, (2) Overall Preoperational Test Program, and (3) Plant Tour. Within

these areas, the inspection consisted of selective examir.ation of representative

records, interviews with personnel and observations by the inspector.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you believe to be proprietary, it is

!

necessary that you submit a written application to this office within 25

days of the date of this letter, reouesting that such infomation be with-

held from public oisclosure.

Any such application must include a full

statement of the reasons on the basis of wnicn it is claimed that tne informa-

tion is proorietary, and snoulo ce prepared so that proprietary information

identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the

recort will be 31acea in the Puolic Document Room.

,

.

.

-

.

.

.

..

.

.

Louisiana Power and Light Company

2

i

Should you have any questions concerning this inspection we will be pleased

to discuss them with you.

Sincerely,

!

GL

G. L. Madsen, Chief

Reactor Projects Branch

Enclosure:

IE Inspection Rcport No. 50-382/81-02