ML20003E695
| ML20003E695 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 02/27/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Nichols T SOUTH CAROLINA ELECTRIC & GAS CO. |
| Shared Package | |
| ML20003E693 | List: |
| References | |
| NUDOCS 8104100069 | |
| Download: ML20003E695 (2) | |
See also: IR 05000395/1981003
Text
-
p rar
UNITED STATES
i
o
O8
N
NUCLEAR REGULATORY COMMISSION
,
(_ / 5
E
REGION 11
-
2
k
101 MARIETTA sT., N.W., SUITE 3100
ATLANTA, G EORGIA 3o303
FEB 271981
- * " '
South Carolina Electric and Gas Company
ATTN:
T. C. Nichols, Jr. , Vice President
Power Production and Systems Operations
P. O. Box 764
Columbia, SC 29218
Gentlemen:
SUBJECT: Report No. 50-395/81-03
This refers to the routine safety inspection conducted by J. L. Skolds of this
office on January 3, - February 11, 1981, of activities authorized by NRC Operating
License No. CPPR-94 for the Summer facility.
Our preliminary findings were
discussed with 0. S. Bradham at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appendix A.
Elements to be included in your response are delineated in Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC Public Document Room. If this report contains
any information that you believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold such infor-
mation from public disclosure. Any such application must include the basis for
claiming that the information is proprietary and the proprietary information
should be contained in a separate part of the document. If we do not hear from
you in this regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
l
fl
Paul K logg, Acting Chief
Reactor Project Branch #2
Enclosures:
(See Page 2)
8104100 O h
-
.
.
,FEB 271981
South Carolina Electric & Gas
-2-
l Company
.
Enclosures:
l '.
Appendix A, Notice.of Violation
.
2.
' Inspection Report No.~ 50-395/81-03
cc w/ encl:
A. A. Smith,' Site.QA Coordinator
0. S. Bradham, Manager
Nuclear Operations
J.
B.- Knotts, Jr.
.
s
-
k
9
m+0 -
f
-
P
-=rer-en-