Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-395/81-03
ML20003E692
Person / Time
Site: Summer 
Issue date: 04/03/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20003E693 List:
References
NUDOCS 8104100059
Download: ML20003E692 (1)


See also: IR 05000395/1981003

Text

An ato

og%

[h

'

UNITED STATES

6

,

1,

NUCLEAR REGULATORY COMMISSION

-

,

~

$

  • $

RE! ION 11

Q

101 MARIETTA ST., N.W., SUITE 3100

%

e

ATLANTA, GEORGIA 3o3o3

        • '

APR 0 31987

/

South Carolina Electric and Gas Company

ge)

ATTN:

T. C. Nichols, Jr., Vice President

Power Production and System Operations

M

APR03iggg,,_ G

P. O. Box 764

V- "'8'g

Columbia, SC 29218

Gentlemen:

Subject: Report No'

5/81-03)

-

Thank you for your letter of March 20, 1981, informing us of steps you have taken

to correct the violations concerning activities under NRC Construction Permit No.

CPPR-94 brought to your attention in our letter of February 27, 1981. We will

examine your corrective actions and plans during subsequent inspections.

>

We appreciate your cooperation with us.

Sincerely,

Ec.

R. C.

wis, Acting Director

Division of Resident and

Reactor Project Inspection

cc:

J. B. Knotts, Jr.

A. A. Smith, Site QA Coordinator

0. S. Bradham, Manager

Nuclear Operations

l

l

!

l

8104100 O p

,;

.

%

-

-

,

-

..i

zy r

,

,

_

SOUTH CAROLINA ELECTRIC a gas COMPANY

post orrice. son 7eg 3

CotumeiA, Souf H:CA40udA 29218

  • ' ' '

T. C. NicHots, J n.

.t

v.co.uiom . o o.a- cue ==

March 20, 1981

NUCLEAa opumanons

Mr. James P. MReilly, Director-

U. S. Nuclear

gulatory Commission

Region II, Sul e 3100

101 Marietta Street, N. W.

Atlanta, Georgia 30303

Subj ect: Virgil C. Summer Nuclear Station

Docket No. 50/395

RII:

JLS-50-395/81.03

Dear Mr. O'Reilly:

Attached is South Carolina Electric and Gas Company's response to the referenced

report which summarizes Mr. J. L. Skolds' inspection of January 3, 1981 through

!

February 11, 1981.

Specifically, we have addressed the violations concerning

storage and control of Quality Assurance records. We consider the actions we

have taken appropriate to assure that these specific type of events will not-

recur.

Should you have questions or comments, please contact us at your convenience.

I declare the statements and matters set forth herein are true and correct to

the best of my knowledge, information and belief..

>

to [

'

T. C. Nichols, Jr.

/'Datel

JWP:TCN:glb

Attachment

cc:

V. C. Summer

J. B. Knotts, Jr.

G. H. Fischer

J. L. Skolds

T. C. Nichols, Jr.

B. A. Bursey

O. W. Dixon, Jr.

O. S. Bradham

C. A. Price

Document Management Branch

D. A. Nauman

(55e/21/LER Only)

l

W. A. Williams, Jr.

I&E (Washington)

R. B. Clary

ISEG

A. R. Koon

NPCF

l,

A. A. Smith

File

H. N. Cyrus

PRS

B/03370Cff

,

a

-. --

.

_

.

..

.

a

.

.

'

.

.

SOUTH CAROLINA ELECTRIC & GAS CO,

VIRGIL C. SUMMER NUCLEAR STATION, UNIT #1-

DOCKET NO: 50-395

REPORT NO: RII:JLS 81-03 NOTICE

OF VIOLATION A

EVENT DATE: FEBRUARY.2,'1981

DESCRIPTION OF EVENT

10 CFR 50, Appendix B, Criterion. XVII requires _that consistent with regulatory

requirements, the applicant establish requirements concerning record location.

Appendix 3A to the FSAR commits the applicant to Regulatory Guide 1.88,

~

Revision 2 which endorses ANSI N45.2.9-1974. - Section 5.2 of ANSI N45.2.9-1974

states that the quality assurance record files shall be stored in predeter-

mined locations, as necessary to meet the_ requirements of applicable codes,

standards 2nd regulatory agencies.

Contrary to the above, on February 2, _1981, quality assurance files not -

presently.srored in.the permanent record vault were not stored in pre-

determined locations.

ADMISSION OR DENIAL OF ALLEGED VIOLATIONS.

South Carolina Electric and Gas Company recognizes this item as a violation-

of the aforementioned regulatory requirements.

4

REASONS FOR VIOLATION

It has been the understanding of South Carolina Electric and Gas Company that

full implenentation of the subject requirement is to be effected prior to

fuel load. Full. implementation at an earlier date seemed impractical due to

the temporary nature of such storage facility locations during the construc-

tion phase.

CORRECTIVE STEPS TAKEN

A revision to AP.301.2, " Nuclear Operations Records Control Procedure", has

been submitted for approval. This revision reflects the requirement for

Qualirv Assurance records retention in predetermined locations and provides

a list of all such authorized locations.

CORRECTIVE STEPS TO BE TAKEN TO PRECLUDE RECURRENCE

A transmittal to appropriate plant personnel will be issued requiring their

review of the subject requirements and full compliance thereto.

DATE OF FULL COMPLIANCE

All actions stated above shall be effected by April 20, 1981.

')

-

.

-.

-..

- -

- . . . - . - . . .

-

.--

- .

..

.

.

.

'

.

.

SOUTH CAROLINA ELECTRIC & GAS CO,

Page 1 of 2

~

.

VIRGIL C. SUMMER NUCLEAR STATION, UNIT #1

DOCKET NO: 50-395

REPORT NO: RII:JLS 81-03 NOTICE

OF VIOLATION B

EVENT DATE: FEBRUARY 2,'1981

DESCRIPTION OF EVENT'

10 CFR 50, Appendix B, Criterion V, implemented by FSAR Section'17.1.5.

requires that activities affecting quality be prescribed by documented

instructions, procedures or drawings of a type appropriate to the circum-

stances and shall be accomplished in accordance with these instructions,

procedures or drawings.

Administrative Procedure (AP)- 301.2 " Nuclear

Operations Records Control Procedures", Section 5.3 states in part that

records may be retained in a Records - Temporary Storage Facility and that

this facility shall be a fire retardant filing cabinet or other fire

retardant enclosed storage device or area. Also, the Records - Temporary

Storage Facility shall have at least the following controls:

1.

a list of personnel authorized access will be maintained in the

immediate area.

2.

a log of all QA records or record packages currently in the facility.

3.

the prescribed method of record removal as specified in the Permanent

Record System Description will be followed.

Contrary to the above, on February.2, 1981, the training qualification

records were not being kept in accordance with AP 301.2 in that:

,

1.

the records were not retained in a fire retardant filing cabinet,

storage device or area.

2.

a list of personnel authorized access was not maintained.

3.

a log of all QA records in the facility did not exist.

4.

the prescribed method of record removal as specified in the Permanent

Record Systen Description was not followed.

ADMISSION OR DENIAL OF ALLEGED VIOLATIONS

South Carolina Electric and Gas Company recognizes this item as a violation

o'f the aforementioned regulatory requirements.

REASONS FOR VIOLATION

It has been the understanding of South Carolina Electric and Gas Company that

full implementation of the subject requirements is to be effected prior to

fuel load.

CORRECTIVE STEPS TAKEN

Fire retardant filing facilities - fire retardant fire cabinets have been

obtained and training qualification records are being transferred to them.

')

.

--

.

. NOTI,CE OF VIOLATION B

Page 2

.

,

.

CORRECTIVE STEPS TAKEN (Cont'd.)

'.

Authorized Access - A list of personnel authorized access to training

qualification records files has been established and is presently maintained

in the immediate area of said files.

QA Records Log - A Quality Assurance Records Log is being established to

conform to the requirements of AP 301.2, " Nuclear Operations Records Control

i

Procedure".

Record Removal - A system for control of records removal is being developed.

This system will conform to the requirements of AP 301.2.

.

CORRECTIVE STEPS TO BE TAKEN TO PRECLUDE RECURRENCE

A meeting with key training personnel vill be held to discuss this violation,

implementation of the aforementioned corrective steps, and the importance

of future compliance to the subject requirements.

DATE OF FULL COMPLIANCE

i

All actions stated herein shall be completed by June- 1, 1981.

.