ML20003D821
| ML20003D821 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 02/09/1981 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML20003D812 | List: |
| References | |
| NUDOCS 8104010067 | |
| Download: ML20003D821 (2) | |
See also: IR 05000269/1981001
Text
F
'.
h
UNITED STATES
3 Ey
- ~ " ^
NUCLEAR REGULATORY COMMISSION
n
- V y
1
$
REGION 11
2
r;
g
101 MARIETTA sT.. N.W., SUITE 3100
g
ATLANTA, G EORGI A 30303
'****
FEB 0 91981
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
Subject: Report Nos. 50-269/81-01, 50-270/81-01 and 50-287/81-01
This refers to the special safety inspection conducted by J. J. Lenahan of this
office on January 6-9,
1981, of activities authorized by NRC Operating License
Nos. DPR-38, DPR-47 and DPR-55 for the Oconee facility. Our preliminary findings
were discussed with J. E. Smith at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appendix A.
Elements to be included in your response are delineated in Appendix A.
One new unresolved item is identified in the enclosed inspection report. This
item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-
tion report will be placed in the NRC Public Document Room.
If this report
contains any information that you believe to be proprietary, it is necessary
that you make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must include the
basis for claiming that the information is proprietary and the proprietary
information should be contained in a separate part of the document. If we do
not hear from you in this regard within the specified period, the report will be
placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
h
l
.
.
C. E. Murphy, Chief [
Reactor Construction and Engineering
Support Branch
Enclosures:
(See Page 2)
810 4010067
- - - - - - - - - - - - - -
.
,o
Duke Power Company
-2-
FE B 0 9 '1981
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-269/81-01,
50-270/81-01 and 50-287/81-01
cc w/ encl:
J. E. Smith, Station Manager