Responds to Revision 1 of IE Bulletin 81-01, Surveillance of Mechanical Snubbers. Visual Insps & push-pull Testing Will Be Performed on Snubbers Installed on safety-related Sys by 810701.Tests Will Be Completed by 810821
ML20003D595
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/17/1981
From: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-81-01, IEB-81-1, NUDOCS 8103270747
Download: ML20003D595 (2)


Text

?/6 SOUTH CAROLINA ELECTRIC a GAS COMPANY POST OFFICE Son 764 cotumeiA, soum CAROLINA 29218 wer Pe s hm f.

p

.=

  • Entcufwt

//

woeu.. c.t no.

e,'<.?h U

q b8 h,%g/g Mr. James P. O'Reilly, Director

%s U.S. Nuclear Regulatory Commission sg

/

Region II, Suite 3100 N','4*

101 Marietta Street, N.W.

\\-

Y /I

(*

Atlanta, Georgia 30303 w

Subject:

Virgil C. Summ r Nuclear Station Docket No.

>0/395 IE Bulletin 81-Ob Rev. 1 Dear Mr. O'Reilly.

As required by the subject Bulletin, t~1e following is Virgil C. Summer Nuclear Station's schedule for complying with the specific actions to be taken for Licensees holding Construction Permits:

Bulletin Item 1(a) - Virgil C. Sumrrer Nuclear Station will perform visual inspertions and " push-pull" testing on mechanical snubbers installed on safety related systems.

These tests will commence on approxi-mately July 1, 1981, and be completed by approx-imately August 21, 1981.

Bulletin Item 1(b) - Not applicable, since Virgil C. Summer Nuclear Station has no INC snubbers.

Bulletin Item 1(c) - If any failures are identified in Item 1(a) above, corrective action will be taken prior to Fuel Load.

Bulletin Item 2

- The results of the inspections, testing, and eval-untion stated above shall be reported to the NRC within 30 days after the inspection and testing have been completed.

The report shall contain the following:

a.

A description of the visual examinations and tests performed, b.

Number of snubbers examined and tested, group-ing by manufacturer name, model number, and size.

c.

Number of failures identified, manufacturer name, model number, size, mode of failure, cause of failure, corrective action, and snubber location.

G 8103270 7

Mr. James P. O'Reilly IE Bulletin 81-01 Page 2 If you have any questions regarding the proposed examination schedule, please contact us at your convenience.

Very truly yours,

/

jff 884 T. C. Nichols, Jr.

ARK:TCN:bsg cc:

V. C. Summer G. H. Fischer T. C. Nichols, Jr.

O. W. Dixon, Jr.

C. A. Price D. A. Nauman W. A. Williams, Jr.

R. B. Clary A. R. Koon A. A. Smith H. N. Cyrus J. B. Knotts, Jr.

J. L. Skolds B. A. Bursey O. S. Bradham Document Management Branch ISE (Washington)

ISEG r

NPCF/Whitaker File PRS