Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20211K0641999-09-0101 September 1999 Proposed Tech Specs,Changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2,correcting Dc Voltage & Degraded Voltage Settings in SR 3.3.6.2 & Correcting Typo in TS 5.6 ML20211G7681999-08-27027 August 1999 Proposed Tech Specs,Allowing Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities While Irradiated Fuel Assembly Movement Continues in SFP ML20196E2191998-11-30030 November 1998 Proposed Tech Specs,Allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 Repair Sleeves ML20195K3831998-11-20020 November 1998 Proposed Tech Specs Removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section XI, Subsections IWE & Iwl,Per 10CFR50.55a ML20195J7181998-11-19019 November 1998 Proposed Tech Specs 3.7.6, SWS, Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20155F7001998-10-30030 October 1998 Proposed Tech Specs Bases,Revs 1,2 & 3 Re List of Effective Pages for Plant ML20154N1961998-10-16016 October 1998 Proposed Tech Specs Pages,Revising TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20236S5621998-07-20020 July 1998 Proposed Tech Specs Providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20217D2691998-04-21021 April 1998 Proposed Tech Specs Re Change to Reactor Coolant Sys Flow Requirements to Allow Increased SG Tube Plugging ML20216H0831998-03-16016 March 1998 Rev 13 to Proposed TS Re Conversion to Improved TSs ML20199J5281998-01-28028 January 1998 Proposed Tech Specs,Converting to Improved TSs ML20198K9851998-01-12012 January 1998 Rev 11 to Proposed Tech Specs,Reflecting Conversion to Improved Sts,Per NUREG-1432 ML20198R7331997-11-0505 November 1997 Proposed Tech Specs Pages Re Rev 10 to Convert to Improved TS ML20217K6161997-10-23023 October 1997 Proposed Tech Specs Section 3.8 Re Change Request to Convert to Improved Std TSs ML20217K6671997-10-22022 October 1997 Proposed Tech Specs Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20198K3321997-10-20020 October 1997 Proposed Tech Specs Section 3.3 Re Change Request to Convert to Improved Std TSs ML20217G3571997-10-0606 October 1997 Proposed Tech Specs Section 3.6 to Reflect Conversion to Improved STS ML20217G3781997-10-0606 October 1997 Proposed Tech Specs Section 3.7 Re Change Request to Convert to Improved STS ML20211J2751997-10-0202 October 1997 Proposed Tech Specs,Reflecting New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20217C7361997-09-29029 September 1997 Proposed Tech Specs Page Omitted from 970609 License Amend Request Re Conversion to Improved TSs ML20210T8701997-09-10010 September 1997 Proposed Tech Specs Rev 5 to Section 3.4 of Original License Amend Application & Other Changes Identified by Personnel ML20210K9711997-08-14014 August 1997 Proposed Tech Specs,Reflecting Removal of TSTF-115,as Well as Other Changes Identified by Plant Personnel ML20149H5821997-07-21021 July 1997 Rev 2 to TS Sections 4.0 & 5.0,converting to Improved Std Tss,Per NUREG-1432 ML20148P7171997-06-27027 June 1997 Proposed Tech Specs Revising Wording to Support Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20135F0441997-03-0606 March 1997 Proposed Tech Specs,Superceding Previously Submitted Marked Up Pp for ABB-CE Sleeves.New Info to Be Incorporated in Updated Licensing rept,CEN-630-P,Rev 01, Repair of 3/4 OD SG Tubes Using Leak Tight Sleeves ML20134E3361997-02-0303 February 1997 Proposed Tech Specs Vol 17,Unit 2 Current Markup Improved Conversion License Amend Request ML20134E3221997-02-0303 February 1997 Proposed Tech Specs for Vol 16,Unit 1 Current Markup Improved Conversion License Amend Request ML20134D3041997-01-31031 January 1997 Proposed Tech Specs Re Requirements to Allow Increased SG Tube Plugging ML20135A5231996-11-26026 November 1996 Proposed Tech Specs Adopting Option B of 10CFR50,App J to Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20134N1831996-11-20020 November 1996 Proposed Tech Specs 6.0 Re Administrative Controls ML20128H6031996-10-0303 October 1996 Proposed Tech Specs,Changing Provisions for Receiving, Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7991996-09-10010 September 1996 Proposed Tech Specs 3/4.3 Re instrumentation,3/4.5 Re ECCS & 3/4.6 Re Containment Sys ML20117L3441996-09-0404 September 1996 Proposed Tech Specs Clarifying License Amend Request Re Implementation of Changes to Radiological Effluent TSs as Proposed by GL 89-01 ML20116F8281996-08-0101 August 1996 Proposed Tech Specs Re Use of Blind Flanges in Place of Containment Purge Valves During Operation ML20116E3771996-07-26026 July 1996 Proposed Tech Specs Allowing Repair of Defective SG Tubes by Electrosleeving ML20117F6431996-05-15015 May 1996 Proposed Tech Specs Section 6.0, Administrative Controls ML20101K6011996-03-28028 March 1996 Proposed TS Figure 3.1.1-1 Re Change to Moderator Temp Coefficient ML20096D4461996-01-16016 January 1996 Proposed Tech Specs,Adopting Option B of 10CFR50,App J to Require Type a Containment Lrt to Be Performed on performance-based Testing Schedule ML20095K2761995-12-21021 December 1995 Proposed Tech Specs,Requesting Temporary Exemption & TS Change to Allow Placement of Four Lead Test Fuel Assemblies in Unit 1 Reactor Core During Cycles 13,14 & 15 ML20095C7471995-12-0707 December 1995 Proposed Tech Spec to Add Analysis Technique to List of Approved Core Operating Limits Analytical Methods in TS for Plant ML20094S1531995-11-30030 November 1995 Proposed Tech Specs,Allowing Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20094D6171995-11-0101 November 1995 Proposed Tech Specs,Upgrading ESF Electrical Sys at Plant to Provide Addl Protection from Loss of Electrical Power ML20093M4291995-10-20020 October 1995 Proposed Tech Specs,Extending 18-month Surveillances to 960331 ML20098C0741995-10-0202 October 1995 Proposed TS 3.7.6.1,extending Action Statements a & B from 7 Days to 30 Days for Loss of Emergency Power ML20086N2551995-07-13013 July 1995 Proposed TS 5.2.1, Fuel Assemblies, Allowing Use of Cladding Matls Other than Zircaloy or ZIRLO W/Approved Temporary Exemption to 10CFR50.46,10CFR50.44 & 10CFR50,App K & Allowing Use of Lead Fuel Assemblies ML20085D5091995-06-0909 June 1995 Proposed Tech Specs,Implementing Changes to Radiological Effluent TS Per GL 89-01 ML20084R0171995-06-0606 June 1995 Proposed Tech Specs Reflecting Extension of Certain 18-month Frequency Surveillances to Refueling Interval ML20084P9741995-06-0202 June 1995 Proposed Tech Specs Re Pressurizer Safety Valves Lift Tolerance ML20087H9281995-04-28028 April 1995 Proposed Tech Specs Re Extension of Allowed Outage Time ML20081D0551995-03-15015 March 1995 Proposed Tech Specs Re Reformation of Current Administrative Controls Section of Plant TS & Relocation of Several Requirements to Other Documents & Programs 1999-09-01
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211K0641999-09-0101 September 1999 Proposed Tech Specs,Changing Definition of Azimuthal Power Tilt in TS 1.1,correcting Peak Linear Heat Rate Safety Limit in TS 2.1.1.2,correcting Dc Voltage & Degraded Voltage Settings in SR 3.3.6.2 & Correcting Typo in TS 5.6 ML20211G7681999-08-27027 August 1999 Proposed Tech Specs,Allowing Placement of One or More Fuel Assemblies on SFP Rack Spacers to Support Fuel Reconstruction Activities While Irradiated Fuel Assembly Movement Continues in SFP ML20207F0261999-06-0101 June 1999 Third Interval Inservice Insp Program Plan for Ccnpp,Units 1 & 2 ML20195B2751999-03-31031 March 1999 Rev 0 to Rept 98-FSW-021, Corrosion Test of SG Tubes with Alloy 800 Mechanical Sleeves ML20204H6011999-01-29029 January 1999 Age Related Degradation Insp (Ardi) Program Technical Requirements Document for Mechanical Systems ML20196E2191998-11-30030 November 1998 Proposed Tech Specs,Allowing Repair of Defective SG Tubes with leak-limiting Alloy 800 Repair Sleeves ML20195K3831998-11-20020 November 1998 Proposed Tech Specs Removing TS Originally Developed from Reg Guide 1.35 & Implementing Requirements of 1992 Edition Through 1992 Addenda of ASME B&PV Code Section XI, Subsections IWE & Iwl,Per 10CFR50.55a ML20195J7181998-11-19019 November 1998 Proposed Tech Specs 3.7.6, SWS, Adding One SWS Heat Exchanger Inoperable as New Condition for LCO 3.7.6 ML20155F7001998-10-30030 October 1998 Proposed Tech Specs Bases,Revs 1,2 & 3 Re List of Effective Pages for Plant ML20154N1961998-10-16016 October 1998 Proposed Tech Specs Pages,Revising TS 3.3.1 & 3.3.2 to Clarify Inconsistency Between TS Wording & Design Bases as Described in TS Bases & UFSAR ML20198A2981998-09-15015 September 1998 Technical Procedure CP-217,rev 7,PCR 98-034, Specifications & Surveillance,Secondary Chemistry ML20198A3131998-09-15015 September 1998 Technical Procedure CP-224,rev 4,PCR 97-049, Monitoring Radioactivity in Systems Normally Uncontaminated ML20236S5621998-07-20020 July 1998 Proposed Tech Specs Providing Alternate Cooling Water Supply to Maintain EDGs Operability During 1999 Refueling Outage ML20195B2861998-06-0505 June 1998 Rev 0 to Rept 98-TR-FSW-005, Test Rept on Alloy 800 Mechanical Sleeve-Addl Qualification Testing Using Low Yield Strength Tubing ML20217D2691998-04-21021 April 1998 Proposed Tech Specs Re Change to Reactor Coolant Sys Flow Requirements to Allow Increased SG Tube Plugging ML20216H0831998-03-16016 March 1998 Rev 13 to Proposed TS Re Conversion to Improved TSs ML20198A2911998-02-23023 February 1998 Technical Procedure CP-206,rev 4,PCR 98-034, Specifications & Surveillance Component Cooling/Service Waster System ML20199J5281998-01-28028 January 1998 Proposed Tech Specs,Converting to Improved TSs ML20198K9851998-01-12012 January 1998 Rev 11 to Proposed Tech Specs,Reflecting Conversion to Improved Sts,Per NUREG-1432 ML20198R7331997-11-0505 November 1997 Proposed Tech Specs Pages Re Rev 10 to Convert to Improved TS ML20217K6161997-10-23023 October 1997 Proposed Tech Specs Section 3.8 Re Change Request to Convert to Improved Std TSs ML20217K6671997-10-22022 October 1997 Proposed Tech Specs Incorporating Both Steady State & Transient Degraded Voltage Setpoints Into Tss,As Opposed to Current Single Degraded Voltage Setpoint ML20198K3321997-10-20020 October 1997 Proposed Tech Specs Section 3.3 Re Change Request to Convert to Improved Std TSs ML20217G3571997-10-0606 October 1997 Proposed Tech Specs Section 3.6 to Reflect Conversion to Improved STS ML20217G3781997-10-0606 October 1997 Proposed Tech Specs Section 3.7 Re Change Request to Convert to Improved STS ML20211J2751997-10-0202 October 1997 Proposed Tech Specs,Reflecting New Electrical Capacity for 1B Edg.Significant Hazards Considerations Associated W/Change Have Been Evaluated ML20217C7361997-09-29029 September 1997 Proposed Tech Specs Page Omitted from 970609 License Amend Request Re Conversion to Improved TSs ML20211J2981997-09-18018 September 1997 Pump & Valve IST Program Third Ten-Yr Interval for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20210T8701997-09-10010 September 1997 Proposed Tech Specs Rev 5 to Section 3.4 of Original License Amend Application & Other Changes Identified by Personnel ML20210K9711997-08-14014 August 1997 Proposed Tech Specs,Reflecting Removal of TSTF-115,as Well as Other Changes Identified by Plant Personnel ML20149H5821997-07-21021 July 1997 Rev 2 to TS Sections 4.0 & 5.0,converting to Improved Std Tss,Per NUREG-1432 ML20148P7171997-06-27027 June 1997 Proposed Tech Specs Revising Wording to Support Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes ML20141G4471997-06-16016 June 1997 Ccnpp Unit 2 Cycle 12 Startup Testing Rept ML20141D9341997-05-0909 May 1997 Radiation Safety Procedure 1-104, Area Posting & Barricading & High Radiation Area Pre-Entry Checklist ML20135F0441997-03-0606 March 1997 Proposed Tech Specs,Superceding Previously Submitted Marked Up Pp for ABB-CE Sleeves.New Info to Be Incorporated in Updated Licensing rept,CEN-630-P,Rev 01, Repair of 3/4 OD SG Tubes Using Leak Tight Sleeves ML20134E3221997-02-0303 February 1997 Proposed Tech Specs for Vol 16,Unit 1 Current Markup Improved Conversion License Amend Request ML20134E3361997-02-0303 February 1997 Proposed Tech Specs Vol 17,Unit 2 Current Markup Improved Conversion License Amend Request ML20134D3041997-01-31031 January 1997 Proposed Tech Specs Re Requirements to Allow Increased SG Tube Plugging ML20210P3971996-12-0404 December 1996 Rev 2 to RP-2-101, Administrative Procedure Radwaste Mgt ML20135A5231996-11-26026 November 1996 Proposed Tech Specs Adopting Option B of 10CFR50,App J to Require Types B & C Containment Leakage Rate Testing to Be Performed on performance-based Testing Schedule ML20134N1831996-11-20020 November 1996 Proposed Tech Specs 6.0 Re Administrative Controls ML20210P3871996-10-17017 October 1996 Rev 2,Change 0 to Offsite Dose Calculation Manual ML20128Q8041996-10-14014 October 1996 Cycle 13 Summary of Startup Testing ML20128H6031996-10-0303 October 1996 Proposed Tech Specs,Changing Provisions for Receiving, Possessing & Using Byproduct,Source & Special Nuclear Matl at Plant ML20117L7991996-09-10010 September 1996 Proposed Tech Specs 3/4.3 Re instrumentation,3/4.5 Re ECCS & 3/4.6 Re Containment Sys ML20117L3441996-09-0404 September 1996 Proposed Tech Specs Clarifying License Amend Request Re Implementation of Changes to Radiological Effluent TSs as Proposed by GL 89-01 ML20116F8281996-08-0101 August 1996 Proposed Tech Specs Re Use of Blind Flanges in Place of Containment Purge Valves During Operation ML20116E3771996-07-26026 July 1996 Proposed Tech Specs Allowing Repair of Defective SG Tubes by Electrosleeving ML20117F6431996-05-15015 May 1996 Proposed Tech Specs Section 6.0, Administrative Controls ML20101K6011996-03-28028 March 1996 Proposed TS Figure 3.1.1-1 Re Change to Moderator Temp Coefficient 1999-09-01
[Table view] |
Text
~
l .
j REACTOR COOLANT SYSTEM CORE BARREL MOVEMENT LIMITING CONDITION FOR OPERATION 3.4.11 Core barrel movement shall be limited to less than the Amplitude P obability Distribution (APD) and Spectral Analysis (SA) Alert Levels for the applicable THERMAL POWER level.
I APPLICABILITY: MODE 1.
~
ACTION:
- a. With the APD and/or SA exceeding their applicable Alert Levels, POWER OPERATION may proceed provided the following actions are f takea:
- 1. APD shall be measured and processed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,
- 2. SA shall be measured at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and shall be prucc. sed at least once per 7 days, and l
, 3. A Special Report, identifying the cause(s) for exceeding the applicable Alert Level, shall be prepared ant sub-
- mitted to the Comission pursuant to specification b_
6.9.2 within gdays of detection.
- ; ..j P
, E. W u Uic APD ondim 5A eweeding ineir sppiivom A " n -
b.'. ~l 4 Levels, within I hour reduce THERMAt r+WER RMAL POWER and within the next 2 ii
_ o% of RATED emonstrate, through mani 'nn n# +ho eseneo noistenn cetnee that ADn and Ra
- b. With the APD and/or SA exceeding their applicable Action Levels, measure and process APD and SA data within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to determine if the core barrel motion is exceeding its limits. With the core barrel motion exceeding its limits, reduce the core barrel motion to within its Action Levels within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in HOT STANDSY within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
U 11 C. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
8108-270 % _ _ _ _ - _ . .. . _ _ . . . _ _ . . . . _ ._ _ .__ _.
cAukr cum - umr d 2. 3/4 4-20 ;
r.e._ .-.r._:.:.
S'*.v:... . 3
- =-. i
_.-~~2.
rii==;=:; i=a=m k.?
^?:. '..? :
REACTOR COOLANT SYSTEM p__Mjk.;
.._.
~ ~~
SURVEILLANCE RE0"._.MENTS
.23
e . . . - . -
4.4.11.1 Ba rline Monitoring Core barrel movement Alert Levels and :T Z-E-Z Action Le E . as determined by APD and SA monitoring of the excore neutron detectors, shall be determined at nominal THERPAL POWER levels of g=215 25%, 50%, 75% and 100% of RATED THERMAL POWER during the reactor startup j%L test program; these Alert Levels and Action Levels shall be reported in a s1Ei:=
'===-
Special Report pursuant to Specification 6.9.2 within 31 days af ter initially reaching 100% of RATED THERMAL POWER. W.5[5
- .. _Ch....
4.4.11.2 Routine Monitoring Core barrel movement shall be determined Z_.T to be less than the APD and SA Alert levels by usino the excore neutron ' - - -
detectors to measure APD and SA at the following frequencies-
- a. APD data shall be measured at ':::: :n:: p:- 'r e : ad d =_=-2
- h ;', bs processed at least once per 7 days. g
- b. SA data shall be measured and processed at least once per %I.I2f 31 days. 5@--
p .:-x
".".ii.; T,e;e. o -Tiie se>ui a vT ;;; peci x :c AT .d E' :r'tcr'---- - - - - - -
+"" . uw . aew ;u u.c ni.avei ;pci a . :-i; ~.: pc c : ~.
- th
- ;;.':d i _E_2
+# C th; ..;o.:0 .- i -- ; na em fOi .._ d .
{Z.- _
E5W c =.2
- ***: ~.:
m.
E-55:.-
-b -
E=.=-
em m
>--si-d.~~.C 3/4 4-30 EE CALVERTCLIFFS-UNIT 1(L .
~ ~
REACTOR 30LANT SYSTEM BASES 3/4.4.10 STRUCTURAL INTEGR]TY The inspection programs for the ASME Code Class 1, 2 and 3 components <
ensure that the structural integrity of these components w.ill be maintained '
at an acceptable level throughout the life of the plant. To the extent applicable, the inspection program for these components is in compliance with Section XI of the ASME Boiler and Pressure Vessel Code.
3/4.4.11 CORE BARREL MVEMENT ' ' ~ '
T: S specification is provided to ensure early detection of excessive core bari 1 movement if it should occur. Core barrel movement will be detected by using four excore neutron detectors to obtain Amplitude Probability Distribution (APD) and Spectral Analysis (SA). Baseline core barrel movement Alert Levels and Action Levels at nominal THEFRAL POWER Jevels of 250, 50%, 75% and 100% of RATED THEPXAL POWER will be deteg ined during the reactor startup test procram. ..
~~
r '
A modification to the recuired monitoring program may be justified by an analysis of the data obtained and by an examination of the affected parts during the plant shutdown at the end of the first fuel cycle.
3/4.4.12 LEiD0Wi; lit:E EXCESS iLOW This specification is provided to ensure that the bypass valve for l during plantflow the excess check valve in the letdown line will be r4aintained closed operation. This bypass valve is required to be closed to ensure that the effects of a pipe ructure downstream of this valve will not exceed the accident analyses assumptions. ,{
Data from these detectors is to be reduced in the forms.
I RMS values are computed from the Amplitude Probability Density (APD) of the signal arslitude. Tnese RMS magnitudes include p variations due both to various neutronic effects and internals i i i motion. Consequently, these signals alone can only provide a gross measure of CSB motion. A more accurate assessment of
(
CSB motion is obtained from the Auto and Cross Power Spectral Densities (PSD, XPSD), phase (f) and coherence (COH) of these signal s. These data result from a Spectral Analysis (SA) of i I
G the excore detector signals. l
..)p C. Alf6vt,7~ C L ufff-- UM. ~.Lf G ;g 7,Q 4-j p _