Text
_
o
.
pa aseg
Do
UNITED STATES
3,4 [,g
f
NUCLEAR REGULATORY COMMISS!ON
g %'c ~ %y)/
s
REGION 11
'
-*
i
5
101 MARIETT A sT., N.W., SUITE 3100
o,
.
f
ATLANTA, GEORGIA 3030s
's
.....
FEB 0 5 eM
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gent i
en:
SUEli.2: Report Nos. 50-321/80-44 and 50-366/80-44
This refers to the routine insp: . ion conducted by H. L. '4hitener of this of fice
on November 18-21, 1980, of activities authorized by NRC Operating License Nos.
DPR-57 and NPF-5 for the Hatch faciltty. Our preliminary findings were discussed
with T. Moore at the conclusien of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
- Jithin these areas, the inspection consisted of
,
selective examinations of procedures and representative records, interviews with
perconnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This icem and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appendix A.
Elements to be included in your response at ? delineated in Appendix A.
One new unresolved item is identified in the enclosed inspection report. This
item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC Public Document Room.
If this report contains
any information that you believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold such informa-
tion from public disclosure.
Any such application must include the basis for
claiming that the information is proprietary and the proprietary information
should be contained in a separate part of the document. If we do not hear from
you in this regard within the specified period, the report will be placed in the
Public Document Room.
,
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
f {.
Richard
. Lewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosures:
(See Page 2
81032700 7)
-
,
.
. __
~
._~. - ...
.
.
.
.
.-....,. ---- -.._.. _ ..
. . - . -
t
,
'
- .
o.
i
r
1
j
.
,
i
Georgia Power Company
-2-
r r-,0
e-.
!
ee
,
,
I
i
i
'
Enclosures:
1.
Appendix A, Notice of Violation
+
-
2.
Inspection Report Nos.
l1
50-321/S0-44 and 50-366/80-44
i
cc w/ encl:
'
M. Manry, Plant Manager
(
'
C. E. Belflower, Site QA Supervisor
!
W. A. Widner, Vice President and
l
General Manager-Nuclear Generation
-
!
i
'
f
I
I
i
l
b
i
i
f
I
i
,
d
i
5
I
t
t
i
?
i-
e
.d>
.
l
i
.
f
'
-
l
i
i
i
-
-
-
.