ML20003D064
| ML20003D064 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 01/30/1981 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Aswell D LOUISIANA POWER & LIGHT CO. |
| Shared Package | |
| ML20003D065 | List: |
| References | |
| NUDOCS 8103190008 | |
| Download: ML20003D064 (1) | |
See also: IR 05000382/1981001
Text
?- A O
.[
- 4,
UNITED STATZS
b
1
NUCLEAR REGULATORY COMMISSION
7 4 * (f I 3
,j ^ [/ f
REGloNIV
k
[
611 RYAN Pt.AZA ORIVE. SUITE 1000
% , ,] , #
2auNcToN. Texas m11
January 30, 1981
In Reply Refer To:
RIV
Cocket No. 50-382/Rpt. 31-01
.
Louisiana Power and Light Comoany
ATTN: Mr. D. L. Aswell
Vice President - Power Production
142 Delaronde Street
New Orleans, Louisiana 70174
Gentlemen:
-
This refers to the Caseload Forecast Panel meeting held at the Waterford
Steam Electric Station, Unit No. 3, construction site and participated in
by Mr. R. C. Stewart of our staff during the period January 12-15, 1981.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Coce of Federal Regulations, a cooy of this letter and the enclosed
inspection reoort will be placed in the NRC's Public Document Room.
If tne
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 25 days
of the date of this letter, requesting that such information be withheld from
cublic disclosure.
The application must include a full statement of the reasons
'why it is claimed that the information is proprietary.
The apolicaticn should
be preparad so that any croprietary information identified is contained in an
enclosure to the application, since the apolication without the enclosure will
also be olaced in the Public Occument Room.
If we do not hear from you in this
regard within the specified period, the recort will be placed in the Public
Document Room.
Should you have any cuestions concerning this recort, we will be cleased to
discuss them witn you.
Sincerely,
l
5/ /
P
4
L C. Seidle, Chief
4 Tp
Reactor Construction and
4
g]
Q
i!ngineering succor 3ranen
h
h
inclosure:
- I Report No. 50-38 4 -01
%
oD~ a ,
v
!
81032ga do$