Interim Deficiency Rept Re Damaged Motor Control Ctr, Initially Reported 801128.Ctr Has Been Shipped Back to Manufacturer & Reinspected.No Extensive Repair or Redesign Necessary.Damage Is Not Reportable Under 10CFR50.55(e)
ML20003C905
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 01/30/1981
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, KNLNRC-81-057, KNLNRC-81-57, NUDOCS 8103180680
Download: ML20003C905 (1)


Text

POR LPDR V TIC KANSAS GAS AND ELECTRIC COA NSIC CENTRAL FILES T <E EJCNC CCMS ANY GLENN L 4 0 E S T E 85 ocs atsiosest aevc6sas

. Januar/ 30, 1981 Mr. W.C. Seidle , Chief Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory Commissica Region IV 611 Ryan Plaza Drive g.i '

\k '

Suite 1000 6

  • Arlington, Texas 76011 6-9 %,<; c( Q qy> p .

.//

I KMINRC 81-057 3

,1

)~ .

Re: Docket No. 50-482 @ [d GLKoester letter to WCSeidle b /

IOfLNRC-043 dated 11/28/80 $

Subj: Damaged Motor Control Center  %/

Q1t'.7

s

Dear Mr. Saidle:

In my November 28, 1980 letter I 'dvised you that we would ins :ect the motor control center, (#1NGO' .') which was damaged during handling in the warehouse, deten:iine the extent of damage and rework or replace the unit.

This letter is to advise you of actions which have been or will be taken and our determination as to reportability under 50.55 (e) .

The motor control center has beet shipped back to the manufacturer, Gould-Brown Boveri, where an insp ction has been performed and a quotation has been prepared to replace all c.amaged parts, retest the unit and return the unit to us as a new unit fully restored and warranted. Further, factor'/ rework will be inspected by Bechtel shop inspection personnel.

In reviewing reportability of this matter, we conclude that neithe r extensive evaluatioli, extensive redesign nor extensive renair will be involved, and thus this instance of damage is not reportable under 50.55(e) .

The motor control center will be reworked to new condition and returned to the site.

Please advise if you need additional information.

Yours very truly,