ML20003C814

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-416/81-02 & 50-417/81-01 on 810121-23.No Noncompliance Noted
ML20003C814
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 02/10/1981
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20003C815 List:
References
NUDOCS 8103180501
Download: ML20003C814 (2)


See also: IR 05000416/1981002

Text

!

M[gnob

UNITED STATES

r

.

o#

. J' "

'

F t,

NUCLEAR REGULATORY COMMISSION

3

.. y

REGION 11

'$

'*'

101 MARIETTA ST.. N.W., SUITE 3100

ATLANTA, GEORGIA 30303

g

FEB 101981

gp.d1 ) / .&,.

f

.....

.

.

76

-\\)

'

Mississippi Power and Light Company

9,

- r

r

,

DIAR J g 7M

-

ATTN:

N. L. Stampley

-

Vice President of Production

u.a, %

p

,

N@ecer

P. O. Box 1640

C3

Jaekson, MS/ 39205

4

Gentlemen:

g

s

Subject: Report Nos

and M 7/81-0 D

This' refers to the special inspection conducted by J. L. Coley of this office on

January 21-23,.1981, of activities authorized by NRC Construction Permit Nos.

CPPR-118 and CPPR-119 for the Grand Gulf facility, and to the discussion of our

findings held with G. - B. Rodgers at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

_ selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

'Within the scope of this. inspection, no violations or deviations were disclosed.

We have examined actio:s you, have taken with regard to previously identified

-enforcement matters and unresolved items. The status = of these items is discussed

in the enclosed report.

s

In accordance with Section.2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, 'a copy of this letter and the enclosed inspection

.

report will be placed in'the NRC's Public Document Room. If this report contains

il

any information that you ~ (or your contractor) believe to be proprietary, it is

necessary that you make. a written application within 20 days to this office to

-

withhold ~ such . information from public disclosure. Any-such application must

,

include a full statement of the reasons on~ the-basis of which it is claimed that

the informationJis proprietary, and. should be prepared so that proprietary infor-

I

'mation identified in the application is contained in

a separate part of the

~

~

, document. lIf'we do: not hear from you in this regard within the specified period,

the report will be placed"in the Public Document Room.

Should you have any; questions concerning this letter, we will be glad to discuss

'them with you.

Sincerely,

+=

W

C. E. Murphy, Chief

Reactor Construction and Engineering-

2 Support Branch

,

iEnclosure:

See Page 2

h

'810318 05 0 'l

, + ,

,

. . ,

.-

--

-

-

.

-

s'

.

Missiscippi Power and Light Company

-2-

FES 2 ~ 1981

Enclosure:

Inspection Report Nos. 50-416/81-02 and 50-417/81-01

cc w/ encl:

C.-K. McCoy, Plant Manager

- , -

-

.

,

.

-