Forwards IE Insp Repts 50-369/80-38 & 50-370/80-20 on 801203-05 & 17-18 & Notice of Violation
ML20003C762
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 01/29/1981
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20003C748 List:
References
NUDOCS 8103180217
Download: ML20003C762 (2)


See also: IR 05000369/1980038

Text

.

4,

' ) 8(#

),,

UN'TED STATES

NUCLEAR REGULATORY COMMISSION

(

n

y.,

C#$

aE

REGION ll

f

IJ1 MARIETTA ST., N.W.. SulTE 3100

g,

'g

ATLANTA, GEORGI A 30303

j'

JAN 2 91991

+....

Duke Power Compaay

ATTN:

W. O. Parker, Jr.

Vice President, 3 team Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

Subject: Report Nos. 50-369/80-33 and 50-370/80-20

This refers to the special inspection conducted by A. R. Herdt of this office on

December 3-5, 1980, and December 17-18, 1980, of activities authorized by NRC

Construction Permit Nos. CPPR-83 and CPPR-84 for the McGuire facility.

Our

preliminary findings were discussed with J.

R.

Wells and A. P. Cobb at the

conclusion of the inspection.

Areas examined during this inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

-

During the inspectiva, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as Appendix A.

Elements to be included in your response are delineated in Appendix A.

Ua have extmined actim2s you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title

,

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC Public Document Room. If this report contains

any information that you believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold such informa-

tion from public disclosure.

Any such application must include the basis for

claiming that the information is proprietary and the proprietary information

should be contained in a separate part of the document. If we do not hear from

you in this regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Charles E.

rphy

hief

Reactor Construction & Engineering

Support Branch

Enclosure:

(See Page 2)

8103180 k N

.

%

Duke Power Company

-2-

J All 2 S 1 % )

Enclosure:

1.

Appendix A, Notice of

Violation

2.

Inspection Report Nos. 50-369/80-38

and 50-370/80-20