ML20003C520
| ML20003C520 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/28/1981 |
| From: | Fielder J MARSH & MCLENNAN, INC. |
| To: | Saltzman J Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8103060345 | |
| Download: ML20003C520 (3) | |
Text
- -
400 North Akard Street
'S Telephone 214 742-1941 g')
h 5 ), p' "
Dallas, Texas 75201 7
January 28, 1981
/
Mr. Jerome Saltzman, Chief Office of Antitrust & Indemnity Nuclear Reactor Regulation Nuclear Regulatory Commission Washington, D. C. 20555
' M&M NuclearConsultants
~ '1 i ~ -
+s Florida Power Corporation Crystal River Unit 3 MAELU Excess Binder XB-35 Endorsement #4 CERTIFIED COPIES
Dear Mr. Saltzman:
Enclosed for your records are two certified copies of Endorsement
- 4 to Florida Power Corporation's Crystal River Unit 3 MAELU Excess Binder XB-35.
This is for the 1981 Advance Premium.
Sincerely, W
v Jean Fielder
\\<Ce!
Nh 0[f b-}-
i
-u
?.8 % ssi cc: J. D. Freitag w%g g
A. Paquet 3g Enclosure q sionoso 395 Nh{s A technical service of Marsh & McLennan, incorporated
MUTUAL ATCMIC ENERC LIABILITY UNDERWRITERS
- 1) ANNUAL PREMIU' ENDORSEMENT
- 2) SUBSCP,IBING CC :PAi;IES AND THEIR PROPCRTIONATE LIABILITY ENDOI SEMENT Calendar Year 1981
- 1. ANNUAL PREMlUM: It is agreed that the Annual Premium due the companies for the period designated above is: 31.350.00
- 2. It is agreed that with respect to (i), bodily injury or property damace caused, during the effective pericd or this endorsement, bf the radioactive, toxic, explosive or other hazardous properties of nuclear material. and (a) cont:ngent liability as provided in Condition 4 for excess incurred losses because retrospect:ve premium due under one or more binders with respect to such bodily :njut s or pr pert. damace is not paid:
The word 'cumpanies" wherever used in the policy means a.
the subscr:bing companies listed on the reverse side of this endersement.
b.
The policy shall be binding on such companies onh c.
Each succ compan. sha'1 he liable cn! :ur.t3 pi cpor tior.
desimaNd next to :ts name of any ubin;ation assumed or expense meurred under the polic:.
3.
It is agreed that the eficen ze period of this encorse:aent is
.t om the beginning of the effective date of this endorsement s'.ated b elow. to the close of December 31st of the Calendar Year designated in the capt:on above, or to the ti ne of the termination or cancellation of the Draft Master Policy, or this binder whichever first occurs, eastern standard time.
Effective Date of this Endorsement January 1.
1931 To form a part of Bindy No.
VB-35 12: 01 A.'
Standard Time
.)
Issued to Florida Power Corporation, et al Date of Issue January 21, 1981 2A' &
By Endor sement ::o.
4 Counterstgned by
.