Forwards IE Insp Repts 50-269/80-35,50-270/80-31 & 50-287/80-28 on 801103-30.No Noncompliance Noted
ML20003C228
Person / Time
Site: Oconee  
Issue date: 01/15/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20003C226 List:
References
NUDOCS 8102270260
Download: ML20003C228 (2)


See also: IR 05000269/1980035

Text

_

-

__

_ .

. _ .

./

f "49

,

  1. o

UNITED STATES

.["

3,

g

~

NUCLEAR REGULATORY COMMISSION

g .-

e

REGION il

o,

'[

101 MARIETTA ST.. N.W., sulT E 3100

'

j'

ATLANTA, GEORGI A 30303

.....

JAN 1 51981

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

SUBJECT:

REPORT N0s. 50-269/80-35, 50-270/80-31, and 50-287/80-28

This refers to the inspection conducted by Frank Jape of this office on November 3-30,

1980 of activities authorized by NRC Operating License Nos. DPR-38, DPR-47, and

DPR-55 for the Oconee Nuclear Station facility, and to the discussion of our

findings held with J. E. Smith at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

l

L'e have examined actions you have taken with regard to previously identified

enforcement matters.

These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

j

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

I

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

l

to this office to withhold such information from public disclosure.

Any such

I

cpplication must include a full statement of the reasons on the basis of which

!

it is claimed that the information is proprietary, and should be prepared so

'

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

-

l

l

\\

i

l

l

~810 2 2 7 0 9.60

o

.

.

.

'

.

JAN 1 E 1301

,

.4

Duke Power Company

-2-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

jb?. ll'.

Richar

ewis, Acting Chief

.

Reactor Operations & Nuclear

Support Branch

Enclosure:

Inspection Report Nos.

50-269/80-35, 50-270/80-31, and

50-287/80-28

cc w/ encl:

J. E. Smith, Station Manager

bec w/ encl:

NRC Resident Inspector