ML20003B666

From kanterella
Jump to navigation Jump to search
Responds to NUREG-0619, BWR Feedwater & Control Rod Drive Return Line Nozzle Cracking. Control Rod Drive Return Line Mods Scheduled for Next refueling.BSEP-2 Feedwater Nozzle & Sparger Mods Scheduled for Following Outage
ML20003B666
Person / Time
Site: Brunswick  
Issue date: 02/18/1981
From: Utley E
CAROLINA POWER & LIGHT CO.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0619, RTR-NUREG-619 NO-81-307, NUDOCS 8102250130
Download: ML20003B666 (1)


Text

.

Carolina Power & Light Company February 18, 1981 FILE: NG-3514(B)

SERIAL NO: NO-81-307 Office of Nuclear Reactor Regulation ATTENTION:

Mr. T. A. Ippolito, Chief Operating Reactors Branch No. 2 United States Nuclear Regulatory Commission Washington, D. C.

20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 BWR FEEDWATER AND CRD RETURN LINE N0ZZLE CRACRING

Dear Mr. Ippolito:

This is in response to your November 13, 1980 letter which transmitted the final edition of NUREG-0619 "BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking." Carolina Power & Light Company (CP&L) has reviewed this edition of NUREG-0619 as it applies to the Brunswick Steam Electric Plant (BSEP) Unit Nos. 1 and 2.

The CRD return line modifications will be made at the next refueling outage for each unit and this should be consistent with the time schedule established in NUREG-0619. The BSEP-2 feedwater nozzle and sparger modifications are scheduled for the refueling after next. This refuel-ing outage-is currently scheduled for Spring of 1983, and would thus meet your schedule. Operational events or other regulatory requirements may eventually require some slippage of this schedule, but CP&L does commit to complete these modifications during the indicated refueling outages.

Should you have any questions on this matter, please contact e

my staff.

y

.o g

^

i_

Yours very truly,

~

~i:M

'/.

~

.//d E. E. Utley Executive Vice President Power Supply and RMP/je~ (910-261)

Engineering & Construction p\\ttilltry Sworn to and subscribed before me this 18th day February, 1981 )

usL +n 1 Jemn 1 Notary Public \\'

8lIC /

j

',/ g$.f 5

My Commission Expires:

October 4, 1981 i,,0f.... slY S f 0

. Y 0

-..r- ~. :

=

~ :.a.a ir

m. - : n. m. m r,

==

c 4

8102250/30

,0