OPERATIONS

SUMMARY

January 1981 At the beginning of the reporting period, the Oyster Creek

-Nuclear Generating Station was operating at 92.6% capacity (6 02 MWe) limited by condensate demineralizer differential pressure and de-clining due to demineralizer conditions.

The ultimate cause of the differential pressure limitation is the inability of the New Radwaste System to process liquid and solid waste as designed'to support regen-eration of the demineralizers.

Load was reduced to 483 MWe on January 11 to remove #7 Con-densate Demineralizer from service for regeneration.

Regeneration was completed and the demineralizer returned to service on January 15.

Load was increased to 623'MWe on January 16 until limited by differ-

_ ential pressure.

The pump was returned to service af ter replacement of the brushes and maintenance on the collector rings.

Load was re-duced on January 20 to remove #6 Condensate Demineralizer from service for regeneration.

The demineralizer was returned to service late on January 23.

After peak-hour on the 23.d, load was reduced to 236%

capacity (230 MWc) for a Control Rod Withdrawal Sequence Interchange and MSIV full closure test.

Full load was reached on Jan0ary 26 and maintained for the remair. der of the month.

On January 30, "C Feed-water Regulating Valve was placed in Local Manual control due to os-cillations in the valve position.

e There were 6 Reportable Occurrences identified during January.

~

j R.O.

81-01 Occurred on January 2 when aclation ' Condenser.e -Hi Drywell Pressure Switch IP15C was found to hav_e a setting less conservative than Tech SeeBr~ requirements.

R.O.

81-02 Occurred on January-2 when "A" stack gas sample pump tripped.

8102250ogy

Paga 2 R.O. 81-03 Occurred on January 12 when the sc drant-hose station at the intake was inoperable due to ice.

R.O. 81-04 Was identified on January 16 when the Diesel Generator Load Study showed a potential for gener-ator overload.

R.O.

81-05 Was identified on January 6 when the "B" Emergency Service Water Pump tripped on low anps and discharge pressure.

R.O.

81-06 WasidentifiedonJanuary15whentrihlelowlevel switch RE 18B was found to have a setting less con-servative than Tech Spec requirements.

4

(

4%

e r er e

rev r.,

e--

- y e yy -- -

OPERATING STATUS UNIT NAME.. 0YSTER CREEK DOCKET NUMBER.. 50-219 UTILITY DATA PREPARED BY...J.B.

SKLAR 609-693-6013 REPORTING PERIOD... January 1981 LICENSED THERMAL POWER (MWT).. 1930 NAMEPLATE RATING (GROSS MWE).. 650 DESIGN ELECTRICAL RATING (NET MWE).. 650 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE).. 650 t

MAXIMUN DEPENDABLE CAPACITY (NET MWE).. 620 IF CHANGES OCCUR IN CAPACITY RATING SINCE LAST REPORT, GIVE REASON...

NONE POWER LEVEL TO WHICH RESTRICTED, IF ANY(NET MWE)...

650 REASON FOR RESTRICTION,.IF ANY...

CONDENSATE DEMINERALIZER DIFFERENTIAL PRESSUR,E MONTH.

YEAR CUMULATIVE HOURS IN PERIOD 744.0 744.0 97392.0 HOURS PX CRITICAL 744.0 744.0 73174.6 l

s RX RESERVE SHUTDOWN HRS.

0.0-0.0 468.2 HRS. GEN ON LINE 744.0 744 0 71712.9 i

UT RESERVE SHUTDOWN HRS 0.0 0.0 0.0 GROSS THERMAL ENERGY 1258000.0.

1258000.0 121404480.5 GROSS ELEC ENERGY 427590.0 427590.0 41355835.0 NET ELEC ENERGY 411090.0 411090.0 39849748.0 l

UT SERVICE CACTOR 100.0 100.0 73.6 UT AVAILABILITY FACTOR 100.0 100.0 73.6 UT CAPACITY FACTOR MDC 89.1 89.1 67.5 UT CAPACITY FACTOR DER 85.0 85.0 62.9

(

FORCED OUTAGE FACTOR 0.0 0.0 6.6 THE NEXT SCHEDULED OUTAGE IS TO BEGIN ON APRIL 4, 1981 e

m.

AVERAGE DAILY POWER LEVEL DOCKET 4...... 50-219 UNIT......... O. C.

41 REPDF;r DATE... February 1 9.,

1981 COMPILED BY...

J.B. SKLAR TELEPHONE..... 609-693-6013 MONTH January 1981 DAY MW DAY MW 1.

573.

17.

590.

2.

571.

18..

598.

3.

571.

19.

591.

4.

566.

20.

528.

5.

562.

21.

520.

6.

559.

22.

514.

7.

562.

-23.

497. -

8.

550.

24.

383.

9.

555.

25.

524.

i 10.

. 551.

26.

628.

11.

501.

27.

640.

12.

459.-

28.

638.

13.

456.

29.

634.

14.

456.

30.

632.

1 15.

502.

31.

636.

16.

583.

O b

u W

9 L

s m.

E.

9 MECilANICAL MONTilLY MAINTENANCE REPORT FOR JANUARY 1981 ITEM #

SYSTEM MALFUNCTION CORRECTIVE ACTION 1

Nitrogen. Purge System Nitrogen compressor 1-1 P.cplaced suction and dis-Does not maintain pres-charge valves, sure j

CRD System Valve V-111 on Accum-Replaced valve ulator 38-55 Leaks Isolation Condenser System Isolation condenser Adjusted packing 3

vent valves leak steam 1

i -

e

JANUARY StM4ARY OF QASL ELECTRICAL MAINTENANCE p

ITEM #-

' SYSTEM MALFUNCTION CORRECTIVE ACTION

'l

  1. 2 Fire Diesel - Batteries Defectlyc Battery Replaced one unit as re-quired.

6

JANUARY StM4ARY OF QASL INSTRLMENT MAINTENANCE

' SYSTEM MALFUNCTION CORRECTIVE ACTION ITEM f I

Main Steam Line Radiation

  1. 4 Monitor Out of Calibrated monitor Monitor Calibration SBGTS - Annunciator L 5-17 Spurious Alarms Reset alarm point to 9" 2

3 Fuel Pool Level Indications Conflicting Replaced surge tank level in-dicator gage, low level alarm card connections cleaned 4

CRD Pump Low suction alarm.

Cleaned contacts on alarm board connector S

CRD Filter Differential pressure Readjusted alarm set point alarm in and recalibrated gage 6

Channel 22 SRM Period light doesn't Replaced light bulb illuminate A0G Vent Radiation Monitor Defective indication Adjusted bypass valve to 7

obtain correct flow rate Radwaste Pump Room Area Alarm setpoint out of Adjusted alarm setpoint 8

Radiation Monitor calibration 9

Liquid Effluent Radiation Out of Calibration Calibrated Recorder Recorder

JAN. INST. CONT.

ITEM #

SYSTEM MALFUNCTION CORRECTIVE AC' ION -

Air Ejector Off Gas.

Out of Calibration Calibrated recorder 10 Radiation Recorder Trunion Room Temperature Defective indication Test switch cleaned and 11 Indicator lubricated Control Rod Drive - Drive Indicates Flow Con-Calibrated transmitter 12 Water Flow Indication stantly and indicator 13

  1. 2 Diesel Generator Engine Alarms spurious Cleaned and polished contacts Temperature Alarm on actuating relay 14 Air Ejector Offgas Radiation Recorder out of cali-Calibrated Monitor bration CRD Accumulator 34-19 Water Alarm Level Replaced float switch 15 switch 2noperative 16 APRM Recorder 7 4 8 Does not drive Replaced chart drive motor 17 LPRM 20-49A Failed downscale Determined detector is fa i led.

Input left bypassed 18 LPRM 04-25D Constant drifting Determined detector is failed.

Input left bypassed.

gg CRD low suction pressure Spurious Alarm Cleaned and polished contacts alarm on actuating relay

r JAN. INST. CONT.

ITEM #

SYSTEM MALFUNCTION CORRECTIVE ACTION 20_

Recirculation Pump Temper-Drifting indication Cleaned slidewire ature Recorder (suction) red - 3F Main Steam Line Radiation Meter trip point out Calibrated g

Monitor of calibration Stack Gas Radiation Monitor Recorder out of cal-Calibrated 22

  1. 2 ibration Liquid Effluent Radiation Recorder out of cal-Calibrated 23 Monitor 82 ibration l

l

s t

DOCKET NO.

50-719

' UNIT SilOTDOWNS AND POWER REDUCDONS t

UNIT NAME O.C.

  1. 1 DATE T'o h n,,, "" 1h 1981 COMPLETED BY
  • I.

H.

Sklar' REPORT MONTit.ianua ry 1981 TELEFilONE 609-693-6013 "i

's u,3 5

e c.

Licensee

$v, Cause & Connective

.E E g

7.s y L' 3 3

Actitui to E$

m 5 cm:

Event N4s.

Date n.

ce di$

sE j di g Report #

Av u

Prevent Recussence d

10 1 /284/ 81 F

0.0 11 5

N/A zz zzzzz Control nod Withdrawal Sequence

[

Interchange.

4

\\

1 2

3 4

i F: Forced Reason:

Method:

Exhible G. Instructions j

S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data Il Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee f

C-Refueling 3 AutomaticScram.

Event Report (LER) File (NUREG.

D Regulatory Restaleshm 4-Other (Emplain) 0161)

E-Operator Training & license Emandnation F Adndnistrative 5

G-Opesalional Esson (Eaplain)

Emhibit I.Same Sousee (9/77)

II Other (Explain)

Oyster Creek Station #1 Docket No. 50-210 REFUELING INFORMATION -

Name of Facility:

Oyster Creek Station #1 Seneduled date for next refueling shutdown:

Nove6er 28,1981 Scheduled date for restart following refueling: May 31, 1982 Will refueling or resumption of operation thereaf ter require a Technical Specification change or otner license amendment?

No Technical Specification change relative to the refuelincj is anticipated.

Scheduled date(s) for submitting procosed licensing action and supporting in fo rma t ion :

No srbnitt, sis are scMduled.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

1) General Electric fuel assetlies - fuel design & perfor: nance analysis Irethods have been approved by the NBC. New cperating procedures, if necessary, will be subnitted at a later date.
2) Exxon Fuel Asserblies - No Irajor changes have been Inade nor are there any anticipated.

The number of fuel assembiles (a) in the core 560 l

(b) in the spent fuel storage pool -

781 The present licensed scent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, i

in number of fuel assemblies:

Present:

1,800 Planned:

2,600 i

The projected date of the last refueling that can be discharged to the spent fuel' pool assuming the present licensed capacity:

i

'Ihe Spring 1987 Outage.

(-