LER-1981-002, /03L-0:on 810102,reactor Coolant Pump 1-2 Was Shutdown Due to High Seal Return Temp & Deteriorating Seal Staging & on 810106,pump 2-1 Was Shutdown for Deteriorating Seal Staging.Caused by Seal Degradation.Seals Replaced |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 3461981002R03 - NRC Website |
|
text
LICENSEE EVENT REPORT
' CONTROL BLOCK: l l
l l
l l
lh (PLE ASE PRINT C71 TYPE ALL CEOUlIE3 INFORMATl!N) 1 6
l0-l H l D l B lS l 1 l@l 0l 01 01 01 Ol el el 0l 01010 l@l 4l 1l 1l 1l 1l@l l
l@
o i F
S 9 LICENSEE CODE 14 16 LICENSE NuvutR 25 26 LaCENSE TYPE Jo 6 7 UA T b6 CON'T O %O"' IL l@l01510 l-10131416 l@l01110121811 l@l012 le 1218 li l@
o i l
7 8
60 el DOCK ET NUVSER tid 4,9 EVENT 0 ATE 74 7S REPORT OATE 80 EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h o 2 l(NP-33-81-01) on 1/2/81 at 1938 hours0.0224 days <br />0.538 hours <br />0.0032 weeks <br />7.37409e-4 months <br />, Reactor Coolant Pump (RCP) 1-2 was shutdown due!
ITTT1 Ito high seal return temperature t.nd deteriorating seal staging. The high flux and l
g l flux / delta flux / flow trip setpoints were reset per T.S. 3.4.1.
On 1/6/81 at 0730 hour0.00845 days <br />0.203 hours <br />0.00121 weeks <br />2.77765e-4 months <br /> 4 iog,,y lRCP 2-1 was shutdown due to deteriorated seal staging. The turbine / generator was l
oe ltripped, and the reactor shutdown. The plant entered Mode 3 at 0803 hours0.00929 days <br />0.223 hours <br />0.00133 weeks <br />3.055415e-4 months <br /> in compli-1 o 7 lance with T.S. 3.0.3.
There was no danger to the health and safety of the public or I
[ o g a 1 lto station personnel.
I 80 7
8 9 DE CODE S BC E COMPONENT CODE SUSCODE SU E
Q lC lB l@ y@ W@ l P l U l M l P l X l X lh y@ J @
7 8
9 10 11 12 13 18 19 20 SEOVENYlAL OCCURRENCE REPORT REVISION LE R/RO EVENTYEAM R EPORT NO.
COOE TYPE No.
@ gU l8l1l
[-j l0l0l2l y
l0 l3 l y
[-j W
RE R
_ 21 22 23 24 26 27 25 29 Ju 31 32 KN ACT ON ON PLANY M
HOURS 22 58 ITT FOR 8.
SUPPLIE MANUFACTURER lA lg W @
l Alg W@
l0l6l0lpl W@
W@
W@
lBl5l8l0l@
34 J5 3ti 37 40 41 42 43 44 47 JJ CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h The I
g lThe cause was the shutdown of reactor co_olant pumps due to seal degradation.
l seals restrain reactor coolant sysCem (RCS) pressure and liquid. Under thintenance I
i i l Work Order 80-4162 and 80-4163, the seals were replaced. Toledo Edison Company and l
, 7
[
g l Byron Jackson, the seal vendor, are investigating the cause of the seal failures.
I I
gi 80 7
8 9 i
ST S
% POWER oTHER STATUS RY otSCOVERY DESCRIPTION y@ l 0l 5 l 5 l@l NA l
W @l Operator observation l
i 5 ACTIVITY CO TE N T RELEASED OF RELE ASE AMOUNT OF ACTIVITY LOCATION OF RELEASE [Z_j @ W @ l NA l
l NA l
i s PERSONNEL ExPoSuEES oESCRiPTiON @
NuveER TvPE NA l
101010 l@l Z l@l i i l
PERSO~~E L iNau'Ji ES NUUSER
DESCRIPTION
NA l
E l01010 l@l 80 7
8 9 11 12 LOSS OF oR DAVAGE TO FACIL11 f TYPE DESC5tiPitON NA l
y@l l
1 9 ao l
a s to NRC WE M oESCRiP rioN @
SSus NA l
l l l l l l l l l l l l-l 2 hl 2 o 68 69 E3 %
7 8 9 to (419) 259-5000, Ext. 253 2
- WR S1-001 & 817004 dAA"8 SY810 PHONE
J PHEPAf1ER 8.1M AROMf f i j
I d
TOLEDO EDISON COMPANY DAVIS-BESSE NUCLEAR POWER STATION UNIT ONE SUPPLEMENTAL INFORMATION FOR LER NP-33-81-01 DATE OF EVENT: January 2, 1981 FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: Controlled Shutdown of Reactor Coolant Pumps 1-2 and 2-1 Dua to Seal Degradation Conditions Prior to Occurrence: The unit was in Mode 1, with Power (MRT) = 1525 and.
Load (Gross MWE) = 495 Description of Occurrence: On January 2,1981 at 1938 hours0.0224 days <br />0.538 hours <br />0.0032 weeks <br />7.37409e-4 months <br />, control room operators shutdown Reactor Coolant Pump (RCP) 1-2 due to a high seal return temperature of 1700F and deteriorating seal staging. The station was running at a reduced power level.
Instrument and Control personnel reset the hi flux and the flux / delta flux / flow set-points to 78.5 percent rated. thermal power as required by Technical Specification 3.4.1.
The action statement requires that in Mode 1, with one pump not in operation, power operation may proceed provided thermal power is restricted to less than 80.2 percent of rated thermal power and within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> the setpoints for the high flux and the flux / delta flux /fl'>w trips be reduced.
On January 6,1981 at 0730 hours0.00845 days <br />0.203 hours <br />0.00121 weeks <br />2.77765e-4 months <br />, control room operators shutdown RCP 2-1 due to deteriorated seal staging. Reactor power had been reduced to 15 percent prior. to tripping the pump. Following the pump trip, the turbine / generator was tripped, and the reactor shutdown. The plant entered Mode 3 at 0803 hours0.00929 days <br />0.223 hours <br />0.00133 weeks <br />3.055415e-4 months <br /> in compliance with Tech-nical Specification 3.0.3.
Designation of Apparent Cause of Occurrer.ce: The cause of the occurrence was the con-trolled shutdown of RCPs for repairs. The pumps were shutdown to prevent further degradation of the seals.
Analysis of Occurrence: There was no danger to the health and safety of the public or to station personnel. The reactor was shutdown, placing it in a safe condition.
l
Corrective Action
Under Maintenance Work Orders 80-4162 and 80-4163, the mechanical seals were replaced.
Toledo Edison Company and Byron Jackson, the seal vendor, are investigating the cause of the seal failure.
i iled s1<qy ur.s of a reactor coolant pump were 5
Failure Data: Three previous et~
reported in Licensee Event Reposta NP-33 '.9 A'
7" 044), NP-33-79-120 (79-103) and NP-32-80-03 (80-019),
LER #81-002
~
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000346/LER-1981-001, Forwards LER 81-001/01X-1 | Forwards LER 81-001/01X-1 | | | 05000346/LER-1981-001-01, /01X-1:on 810107,discovered Contractor Personnel on 801204 Disassembled Restraints Other than Those Requested & Failed to Perform Reassembly in Timely Manner. Caused by Inadequate Procedural Control | /01X-1:on 810107,discovered Contractor Personnel on 801204 Disassembled Restraints Other than Those Requested & Failed to Perform Reassembly in Timely Manner. Caused by Inadequate Procedural Control | | | 05000346/LER-1981-002-03, /03L-0:on 810102,reactor Coolant Pump 1-2 Was Shutdown Due to High Seal Return Temp & Deteriorating Seal Staging & on 810106,pump 2-1 Was Shutdown for Deteriorating Seal Staging.Caused by Seal Degradation.Seals Replaced | /03L-0:on 810102,reactor Coolant Pump 1-2 Was Shutdown Due to High Seal Return Temp & Deteriorating Seal Staging & on 810106,pump 2-1 Was Shutdown for Deteriorating Seal Staging.Caused by Seal Degradation.Seals Replaced | | | 05000346/LER-1981-002, Forwards LER 81-002/03L-0 | Forwards LER 81-002/03L-0 | | | 05000346/LER-1981-003-03, /03L-0:on 810106,breaker HX02B Tripped, de-energizing Bus B Which Reduced Electrical Distribution Less than Tech Specs Required.Caused by Personnel Error. Breakers Restored.Operators Counselled Re Attentiveness | /03L-0:on 810106,breaker HX02B Tripped, de-energizing Bus B Which Reduced Electrical Distribution Less than Tech Specs Required.Caused by Personnel Error. Breakers Restored.Operators Counselled Re Attentiveness | | | 05000346/LER-1981-003, Forwards LER 81-003/03L-0 | Forwards LER 81-003/03L-0 | | | 05000346/LER-1981-004, Forwards LER 81-004/03X-1 | Forwards LER 81-004/03X-1 | | | 05000346/LER-1981-005-03, /03L-0:on 810114,RCS Chloride Concentration Exceeded Tech Spec Limit.Caused by Use of Spotcheck in Cleaning Reactor Coolant Pump Seal Cavities.Instructions Issued for Use of Solvents in RCS | /03L-0:on 810114,RCS Chloride Concentration Exceeded Tech Spec Limit.Caused by Use of Spotcheck in Cleaning Reactor Coolant Pump Seal Cavities.Instructions Issued for Use of Solvents in RCS | | | 05000346/LER-1981-005, Forwards LER 81-005/03L-0 | Forwards LER 81-005/03L-0 | | | 05000346/LER-1981-006-03, /03L-0:on 810119,power Lost to Safety Features Actuation Sys Channel 1 Cabinet.Caused by Blown Supply Fuse from Panel Y-1 Due to Procedure Deficiency.Fuse Replaced & Procedure Modified | /03L-0:on 810119,power Lost to Safety Features Actuation Sys Channel 1 Cabinet.Caused by Blown Supply Fuse from Panel Y-1 Due to Procedure Deficiency.Fuse Replaced & Procedure Modified | | | 05000346/LER-1981-006, Forwards LER 81-006/03L-0 | Forwards LER 81-006/03L-0 | | | 05000346/LER-1981-007, Forwards LER 81-007/03L-0 | Forwards LER 81-007/03L-0 | | | 05000346/LER-1981-007-03, /03L-0:on 810122,door 306 Found Partially Open,So That Spent Fuel Pool Emergency Ventilation Sys Could Not Have Maintained Area at Correct Pressure.Caused by Maladjusted Door Closure.Maint Work Order Issued | /03L-0:on 810122,door 306 Found Partially Open,So That Spent Fuel Pool Emergency Ventilation Sys Could Not Have Maintained Area at Correct Pressure.Caused by Maladjusted Door Closure.Maint Work Order Issued | | | 05000346/LER-1981-008, Forwards LER 81-008/03L-0 | Forwards LER 81-008/03L-0 | | | 05000346/LER-1981-008-03, /03L-0:on 810127,345 Kv Switchyard Bus K Tripped & Locked out,de-energizing Startup Transformer 02.Caused by Action from Directional Ground Current Relay & Charred Phase Lightning Arrestor C on Startup Transformer | /03L-0:on 810127,345 Kv Switchyard Bus K Tripped & Locked out,de-energizing Startup Transformer 02.Caused by Action from Directional Ground Current Relay & Charred Phase Lightning Arrestor C on Startup Transformer | | | 05000346/LER-1981-009-03, /03L-0:on 810128,diesel Generator 1-2 Could Not Be Started W/Left Side Set of Air Start Motors During Diesel Generator Surveillance Test 5081.01.Caused by Failure of One Air Start Motor Due to Broken Solenoid Drive Shaft | /03L-0:on 810128,diesel Generator 1-2 Could Not Be Started W/Left Side Set of Air Start Motors During Diesel Generator Surveillance Test 5081.01.Caused by Failure of One Air Start Motor Due to Broken Solenoid Drive Shaft | | | 05000346/LER-1981-009, Forwards LER 81-009/03L-0 | Forwards LER 81-009/03L-0 | | | 05000346/LER-1981-010, Forwards LER 81-010/03L-0 | Forwards LER 81-010/03L-0 | | | 05000346/LER-1981-010-03, /03L-0:on 810202,MSIV Bypass Valve Ms 100 a Failed to Close.Probably Caused by Component Failure.Actuator Spring Adjusted to Increase Tension Until Valve Would Close | /03L-0:on 810202,MSIV Bypass Valve Ms 100 a Failed to Close.Probably Caused by Component Failure.Actuator Spring Adjusted to Increase Tension Until Valve Would Close | | | 05000346/LER-1981-011, Forwards LER 81-011/03L-0 | Forwards LER 81-011/03L-0 | | | 05000346/LER-1981-011-03, /03L-0:on 810205,post-accident Monitoring Instrument HPI Flow 1-2 Was Declared Inoperable.Caused by Bad Current Buffer.Current Buffer Was Repaired,Recalibr & Reinstalled.Hpi Flow 1-2 Was Returned to Operable Status | /03L-0:on 810205,post-accident Monitoring Instrument HPI Flow 1-2 Was Declared Inoperable.Caused by Bad Current Buffer.Current Buffer Was Repaired,Recalibr & Reinstalled.Hpi Flow 1-2 Was Returned to Operable Status | | | 05000346/LER-1981-012-03, /03L-0:on 810212,control Rod 1-3 Absolute Position Indication Declared Inoperable Due to Fluctuating Signals Causing Asymmetric Rod Alarms.Exact Cause Undetermined,But Absolute Position Indication Leads Picking Up Noise | /03L-0:on 810212,control Rod 1-3 Absolute Position Indication Declared Inoperable Due to Fluctuating Signals Causing Asymmetric Rod Alarms.Exact Cause Undetermined,But Absolute Position Indication Leads Picking Up Noise | | | 05000346/LER-1981-012, Forwards LER 81-012/03L-0 | Forwards LER 81-012/03L-0 | | | 05000346/LER-1981-013-03, /03L-0:on 810218,control Room Normal Ventilation Dampers Tripped Shut Resulting in No Power Available to Chlorine Detector 1 Above Control Room or in Block House. Caused by Failure of 10 Amp Fuse of Circuit Y111 | /03L-0:on 810218,control Room Normal Ventilation Dampers Tripped Shut Resulting in No Power Available to Chlorine Detector 1 Above Control Room or in Block House. Caused by Failure of 10 Amp Fuse of Circuit Y111 | | | 05000346/LER-1981-013, Forwards LER 81-013/03L-0 | Forwards LER 81-013/03L-0 | | | 05000346/LER-1981-014-03, /03X-1:on 810226,decay Heat Valve 64 Would Not Open During Testable ECCS Valves Quarterly Test.Caused by Loose Set Rod Bushing,Allowing Gear Box Set Rod to Move Which Unlocked Limit Switches from Adjusted Position | /03X-1:on 810226,decay Heat Valve 64 Would Not Open During Testable ECCS Valves Quarterly Test.Caused by Loose Set Rod Bushing,Allowing Gear Box Set Rod to Move Which Unlocked Limit Switches from Adjusted Position | | | 05000346/LER-1981-014, Forwards LER 81-014/03X-1 | Forwards LER 81-014/03X-1 | | | 05000346/LER-1981-015-03, /03L-0:on 810227,access Door 107 Found Propped Open from ECCS 2 Pump Room 115 to Miscellaneous Waste Monitor Tank & Pump Room 114.Caused by Failure to Follow Posted Signs While Clearing Odor from Room | /03L-0:on 810227,access Door 107 Found Propped Open from ECCS 2 Pump Room 115 to Miscellaneous Waste Monitor Tank & Pump Room 114.Caused by Failure to Follow Posted Signs While Clearing Odor from Room | | | 05000346/LER-1981-015, Forwards LER 81-015/03L-0 | Forwards LER 81-015/03L-0 | | | 05000346/LER-1981-016, Forwards LER 81-016/03L-0 | Forwards LER 81-016/03L-0 | | | 05000346/LER-1981-016-03, /03L-0:on 810308,dose Equivalent I-131 Level Exceeded Tech Spec Limit.Caused by Gas Leakage Through Fuel Cladding.Levels Monitored | /03L-0:on 810308,dose Equivalent I-131 Level Exceeded Tech Spec Limit.Caused by Gas Leakage Through Fuel Cladding.Levels Monitored | | | 05000346/LER-1981-017-03, /03L-0:on 810309,train 2 Hpi/Low Pressure Injection cross-connect Isolation Valve Dh 63 Would Not Open from Control Room During Quarterly Valve Surveillance Test 5051.13.Caused by Faulty Torque Switch in Valve Operator | /03L-0:on 810309,train 2 Hpi/Low Pressure Injection cross-connect Isolation Valve Dh 63 Would Not Open from Control Room During Quarterly Valve Surveillance Test 5051.13.Caused by Faulty Torque Switch in Valve Operator | | | 05000346/LER-1981-017, Forwards LER 81-017/03L-0 | Forwards LER 81-017/03L-0 | | | 05000346/LER-1981-018-03, /03L-0:on 810322 & 0401,chlorine Detector Ae 5358B Tripped.First Trip Probably Caused by Fouled Detector. Detector Cleaned.Detector & Circuit Board Replaced After Second Failure | /03L-0:on 810322 & 0401,chlorine Detector Ae 5358B Tripped.First Trip Probably Caused by Fouled Detector. Detector Cleaned.Detector & Circuit Board Replaced After Second Failure | | | 05000346/LER-1981-018, Forwards LER 81-018/03L-0 | Forwards LER 81-018/03L-0 | | | 05000346/LER-1981-019-03, /03L-0:on 810323,fluctuating Signals W/Numerous Asymmetric Rod Alarms Received,Resulting in Control Rod 4-7 Absolute Position Indication Inoperability.Probably Caused by Electrical Penetration Module Deficiency | /03L-0:on 810323,fluctuating Signals W/Numerous Asymmetric Rod Alarms Received,Resulting in Control Rod 4-7 Absolute Position Indication Inoperability.Probably Caused by Electrical Penetration Module Deficiency | | | 05000346/LER-1981-019, Forwards LER 81-019/03L-0 | Forwards LER 81-019/03L-0 | | | 05000346/LER-1981-020-03, /03L-0:on 810324,valve CV5011A,on Containment Air Sample Inlet Line to Hydrogen Analyzer,Would Not Stroke Closed W/Monitor Operator.Caused by Badly Worn Tripper in Motor Operator.Tripper Levers Replaced | /03L-0:on 810324,valve CV5011A,on Containment Air Sample Inlet Line to Hydrogen Analyzer,Would Not Stroke Closed W/Monitor Operator.Caused by Badly Worn Tripper in Motor Operator.Tripper Levers Replaced | | | 05000346/LER-1981-020, Forwards LER 81-020/03L-0 | Forwards LER 81-020/03L-0 | | | 05000346/LER-1981-021-03, /03L-0:on 810401,half Trip Occurred from Steam & Feedwater Rupture Control Sys Channel 1 Low Steam Generator Level Trip.Caused by Power Supply Failure.Power Supply Replaced Per Work Order on 810402 | /03L-0:on 810401,half Trip Occurred from Steam & Feedwater Rupture Control Sys Channel 1 Low Steam Generator Level Trip.Caused by Power Supply Failure.Power Supply Replaced Per Work Order on 810402 | | | 05000346/LER-1981-021, Forwards LER 81-021/03L-0 | Forwards LER 81-021/03L-0 | | | 05000346/LER-1981-022, Forwards LER 81-022/03L-0 | Forwards LER 81-022/03L-0 | | | 05000346/LER-1981-022-03, /03L-0:on 810316,NRC Site Inspector Reported Finding Four 0.5-inch Holes Through Control Room Equipment Room East Fire Wall.On 810403,two Holes Found in Wall of Room 427B.Caused by Personnel Error | /03L-0:on 810316,NRC Site Inspector Reported Finding Four 0.5-inch Holes Through Control Room Equipment Room East Fire Wall.On 810403,two Holes Found in Wall of Room 427B.Caused by Personnel Error | | | 05000346/LER-1981-023-03, /03L-1:on 810403,decay Heat Cooler Outlet Valve CC1467 Stroked Closed During Component Cooling Water Monthly Test & Would Not Reopen.Caused by Excessive Wear on Actuator Due to Design Deficiency.Actuator Rebuilt | /03L-1:on 810403,decay Heat Cooler Outlet Valve CC1467 Stroked Closed During Component Cooling Water Monthly Test & Would Not Reopen.Caused by Excessive Wear on Actuator Due to Design Deficiency.Actuator Rebuilt | | | 05000346/LER-1981-023, Forwards LER 81-023/03L-1 | Forwards LER 81-023/03L-1 | | | 05000346/LER-1981-024, Forwards LER 81-024/03L-0 | Forwards LER 81-024/03L-0 | | | 05000346/LER-1981-024-03, /03L-0:on 810418,bus J Was Rapidly Taken Out of Svc W/O Providing for Alternate Power Supply for Decay Heat Pump 1-1.Caused by Personnel Error.Procedure Modified & Operator Informed of Mods | /03L-0:on 810418,bus J Was Rapidly Taken Out of Svc W/O Providing for Alternate Power Supply for Decay Heat Pump 1-1.Caused by Personnel Error.Procedure Modified & Operator Informed of Mods | | | 05000346/LER-1981-025, Forwards LER 81-025/03L-0 | Forwards LER 81-025/03L-0 | | | 05000346/LER-1981-025-03, /03L-0:on 810423,during Review of Safety Tagging Log,Unit Entered Mode 4 W/O Required Two Makeup Pumps Operable.Caused by Personnel Error.Pumps Restored to Operation.Personnel Reinstructed in Procedures | /03L-0:on 810423,during Review of Safety Tagging Log,Unit Entered Mode 4 W/O Required Two Makeup Pumps Operable.Caused by Personnel Error.Pumps Restored to Operation.Personnel Reinstructed in Procedures | | | 05000346/LER-1981-026-03, /03L-0:on 810428,reactor Protection Sys Channel 1 Tripped on Flux/Delta Flux/Flow.Caused by Failure of Flow Differential Pressure Transmitter Primary Power Transformer Shorting to Ground.New Amplifier Installed & Calibr | /03L-0:on 810428,reactor Protection Sys Channel 1 Tripped on Flux/Delta Flux/Flow.Caused by Failure of Flow Differential Pressure Transmitter Primary Power Transformer Shorting to Ground.New Amplifier Installed & Calibr | |
|