ML20002E186

From kanterella
Jump to navigation Jump to search
Forwards LER 80-123/03L-0
Date released: 01/16/2020 Download: ML20002E186


LER 80-123/03L-0:on 801219 & 801226,turbine Trip & Throttle Valve on Reactor Core Isolation Cooling Sys Failed.Failures Caused by Gall on Valve Poppet & Body & Improper Limit Switch Setting.Gall Removed & Switch Reset
ML20002E192
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 01/15/1981
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20002E192 (2)
Forwards LER 80-123/03L-0
ML20002E185
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 01/15/1981
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20002E185 (1)