Forwards IE Insp Rept 50-155/75-15 on 751103-07. Noncompliance Noted
ML20002D745
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 12/01/1975
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dewitt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20002D741 List:
References
NUDOCS 8101220292
Download: ML20002D745 (2)


See also: IR 05000155/1975015

Text

LLXssid L/LM19 MMS IMAiss

.

o

,

1

Y.

FILE COPY

]

.

.

i

UNITEo STATES

J

'

NUCLEAR REGULATORY COMMISSION

REGION lt!

799 ROOSEVELT ROAD

7e.EN ELLYN, liLINOIS 60137

DEC 1

1975

,

Consu:nars Power Co.rpany

Docket No. 50-155

ATIN: Mr. R. B. Dewitt

Manager of Nuclear

Plant Operations

,

212 West Michigan Avenue

Jackson, Michigan 49201

Gentlemen:

This refers to the inspection conducted by Mr. Hunter of this

office on November 3-7, 1975, of activities at Big Rock Point

Nuclear Plant authorized by Reactor Operating License No. DPR-6

and to the discussions of our findings with Mr. ,Eartman and

others of your staff at the conclusion of the inspection.

A copy of our report of this inspection is enclosed and identi-

fies the areas ernmined during the inspection. Within these

areas, the inspection consisted of a celective creinntion of

procedures and representative records, interviews with plant

'

personnel, and observations by the inspector.

During this inspection, it was found that certain of your

activities appear to be in noncoglicnce with NRC require-

ments. The item and reference to the pertinent requirecents

are listed under Enforcement Act10n in the Surrary of Find-

ings section of the enclosed inspection report.

This notice is sent to

pursuant to the provisions of

Section 2.201 of the

's " Rules of Practice," Part 2,

'

e

Title 10. Code of Ii ucral Regulations.

Section 2.201 requires

you to submit to this office within twenty days of your

receipt of this notice, a written statement or explanation

in reply, including:

(1) corrective steps which have been

taken by you, and the results achieved; (2) corrective steps

which will be taken to avoid further itens of noncompliance;

and (3) the date when full compliance will be achieved.

,

/.

/

- .. J

/,/

$0/AS$ MS

"

1.

"E

.

-

.

1

'

DEC 1

g.

Constaners Power Company

-2-

<

.

'

.

In accordance with Section 2.790 of the NRC's " Rules of

Practice,". Part 2 Title 10,' Code of Federal Regulations, a

copy of this notice, the enclosed inspection report, and your

response to this notice will be placed in the NRC's Public

Document Room. If this report contains any information that

you or your contractors believe to be proprietary, it is

necessary that you make a written application to this office,

within twenty days of your receipt of this notice, to with-

hold such inforr.ation from public disclosure. Any such

application must include a full statement of the reasons for

which it is claimed that the information is proprietary, and

should be prepared so the proprietary information identified

in the application is contained in a separate part of the

document. Unless we receive an application to withhold in-

formation'or are otherwise contacted within the specified

time period, the written material identified in this para-

graph will be placed in the Public Document Room.

Should you have any questions concerning this inspectiot., we

will be glad to discuss them with you.

'incerely yours,

i t

.

Caston Fiore111, Chief

Reactor Operations and

Nuclear Support Branch

-

,

!

'

Enclosure:

IE Inspection Rpt No.

050-155/75-15

l

cc w/ enc 1:

'

Mr. C. J. Hartman

Plant Superintendent

bec w/ enc 1:

PDR

f

I

Local PDR

!

NSIC

i

TIC

Ronald Callen, Michigan Public

Service Corr ission

,

Anthony Roisman, Esq., Attorney

I

l

l

l

l

-

<

.

l

.

_ _ _ .