Forwards IE Insp Rept 50-341/80-20 on 801112-14 & Notice of Violation
ML20002D679
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/09/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Whiddon O
DETROIT EDISON CO.
Shared Package
ML20002D680 List:
References
NUDOCS 8101210656
Download: ML20002D679 (2)


See also: IR 05000341/1980020

Text

p reag

,

b

UNITED STATES

!h

[' " 3 #

NUCLEAR REGULATORY COMMISSION

e-

g

a

REGION lli

$

8

799 ROOSEVELT ROAD

d

% . . . . . ,o

GLEN E LLYN. ILLINolS 60137

DEC -- 9 f980

a

12

'

%

e

L:

Docket No. 50-341

E~

f y'

.

7 M-;

[hd

The Detroit Edison Company

1g,

]

dl

ATTN:

Mr. O. D. Whiddon

y

i;'l

g

Vice President Operations

f.;

7j:

2000 Second Avenue

"

d

4

"

Detroit, MI 48226

Gentlemen:

This refers to the inspection conducted by Mr. P. A. Barrett of this

office on November 12-14, 1980, of activities at Enrico Fermi Nuclear

Station, Unit 2, authorized by NRC Construction Permit No. CPPR-87 and

to the discussion of our findings with yourself at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

!

During this inspection, certain of your activities appeared to be in non-

!

compliance with NRC requirements, as described in the enclosed Appendix A,

!

and a written response is required.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

and your response to this letter will be placed in the NRC's Public Document

Room, except as follows.

If the enclosures contain information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty-five days of the date of this letter, to withhold

such information from public disclosure. The application must include a full

statement of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

81omo ggg

. . _ .

--

-

_..

.

.

. ' .

(

DEC - 9 G60

Detroit Edison Company

2-

-

'

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

f(f

f

'

j

G. Fiorelli, Chief

Reactor Construction and

Engineering Suiport Branch

i

Enclosures:

I

1.

Appendix A, Notice

i

of Violation

i

2.

IE Inspection Report

No. 50-341/80- 20

,

cc w/ encl:

Central Files

'

i

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

PDR

>

Local PDR

NSIC

TIC

Ronald Callen, Michigan

Public Service Commission

Eugene B. Thomas, Jr.,

Attorney

i

,

4

l

4

.--

-.

- - - , - , -

- . - , ,

. - - - -

-

. - . -

- - ,

. _ - -

. - - - ,

--