Text
T
\\^
- pa nt:ta ,"'o
UNITED STATES
l
^
8
NUCLEAR REGULATORY COMMISSION
o
Y
E
REGION lli
s
'h
799 ROOSEVELT ROAD
G
g.....,[
m 84 ELLYN. ILLINOIS 60137
E2
u
,
==
'
FEG 2 3 20)
- -
- ,
m,
,,
'3
3
.;
.
Docket No. 50-346
hf'
3
nEi
zi
hy
3
Toledo Edison Company
M
y
ATTN:
Mr. Richard P. Crouse
g3
S
"
Vice President
Nuclear
Edison Plaza
300 Madison Avenue
Toledo, OH 43652
Gentlemen:
This refers to the routine inspection conducted by Messrs. L. A. Reyes and
W. G. Rogers of this office on October 20-25, 27-31, November 1-8, 10, 12-14,
17-21, 24-26, December 1-5, 1980, of activities at the Davis-Besse Nuclear
Power Station, Unit I authorized by NRC Operating License No. NPF-3 and to
the discussion of our findings with Mr. T. Murray on October 24, November 14,
and December 4, 1980, and through the course of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
.
examination of procedures and representative records, observations, and
l
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix A,
and a written response is required.
l
i
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
f
Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,
l
and your response to this letter will be placed in the NRC's Public Document
Room, except as follows.
If the enclosures contain information that you or
your contractors believe to be proprietary, you must apply in writing to
this office, within twenty-five days of the date of this letter, to withhold
such information from public disclosure.
The application must include a full
statement of the reasons for which the information is considered proprietary,
and should be prepared so that proprietary information identified in the
application is contained in an enclosure to the application.
l
1
001210f
5
"
Toledo Edison Company
-2-
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
. F. Heishman, Chief
Reactor Operations and
Nuclear Support Branch
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Report
No. 50-346/80-29
cc w/encls:
T. D. Murray, Station
Superintendent
Central Files
Reproduction Unit NRC 20b
Resident Inspector, RIII
Local PDR
Harold W. Kohn, Power
Siting Commission
Helen W. Evans, State of Ohio
l
,
,