ML20002D670

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-346/80-29 on 801020-1126 & 1201-05 & Notice of Violation
ML20002D670
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/23/1980
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20002D671 List:
References
NUDOCS 8101210645
Download: ML20002D670 (2)


See also: IR 05000346/1980029

Text

T

\\^

  1. pa nt:ta ,"'o

UNITED STATES

l

^

8

NUCLEAR REGULATORY COMMISSION

o

Y

E

REGION lli

s

'h

799 ROOSEVELT ROAD

G

g.....,[

m 84 ELLYN. ILLINOIS 60137

E2

u

,

==

'

FEG 2 3 20)

-
,

m,

,,

'3

3

.;

.

Docket No. 50-346

hf'

3

nEi

zi

hy

3

Toledo Edison Company

M

y

ATTN:

Mr. Richard P. Crouse

g3

S

"

Vice President

Nuclear

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the routine inspection conducted by Messrs. L. A. Reyes and

W. G. Rogers of this office on October 20-25, 27-31, November 1-8, 10, 12-14,

17-21, 24-26, December 1-5, 1980, of activities at the Davis-Besse Nuclear

Power Station, Unit I authorized by NRC Operating License No. NPF-3 and to

the discussion of our findings with Mr. T. Murray on October 24, November 14,

and December 4, 1980, and through the course of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

.

examination of procedures and representative records, observations, and

l

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A,

and a written response is required.

l

i

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

f

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

l

and your response to this letter will be placed in the NRC's Public Document

Room, except as follows.

If the enclosures contain information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty-five days of the date of this letter, to withhold

such information from public disclosure.

The application must include a full

statement of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

l

1

001210f

5

"

Toledo Edison Company

-2-

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

CP

. F. Heishman, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-346/80-29

cc w/encls:

T. D. Murray, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Power

Siting Commission

Helen W. Evans, State of Ohio

l

,

,