Notice of Violation from Insp on 801020-1126 & 1201-05
ML20002D672
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/23/1980
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20002D671 List:
References
50-346-80-29, NUDOCS 8101210646
Download: ML20002D672 (1)


Text

-

)

s/

Appendix A NOTICE OF VIOLATION Toledo Edison Company Docket No. 50-346 As a result of the inspection conducted on October 20-25, 27-31, November 1-8, 10, 12-14, 17-21, 24-26, December 1-5, 1980, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violation was identified:

Technical Specification 4.3.2.1.1 requires that each containment pressure channel be tested on a monthly basis. The Functional Test shall include the exercise of the pressure transmitter.

Contrary to the above, the containment pressure channels monthly Functional Test did not include exercising the pressure transmitter in that Surveillance Test ST 5031.01, used to perform the monthly Functional Test, did not include this requirement.

i This is a Severity Level IV violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Toledo Edison Company is hereby required to submit to this office within twenty-five days of the date of this Notice, a written statement or explanation in reply, including:

(1) admission or denial of the alleged item (s) of noncompliance; (2) the reasons for the item (s) of noncompliance if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further items of noncompliance; and (5) the date when full compliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.

O date b O

~ F~l bk"F. Heishman, Chief l

Reactor Operations and L