ML20002D300

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1980
ML20002D300
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/05/1981
From: Culver M
FLORIDA POWER CORP.
To:
Shared Package
ML20002D298 List:
References
NUDOCS 8101200294
Download: ML20002D300 (5)


Text

.

,,<v.

%/

OPERATING DATA REPORT DOCKET NO.

50-302 DATE 1/5/81

' COMPLETED itY M.W. Culver TELEP110NE (904)795-6486 OPERATING STATUS

1. Unit Name: Crystal River Unit 3 Notes

~

2. Reporting Period: 12/1/80 thru 12/31/80
3. Licensed Thermal Power (MWt): 2452
4. Nameplate Rating (Gross MWe):

890 825

5. Design Electrical Rating (Net MWe):
6. Masimum Dependable Capacity (Gross MWe): P23 782
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occurin Capacity Ratings (Items Number 3 Through 7)Since Last Report.Gise Reasons:

N/A NONE

9. Power Lesel To which Restricted,if Any (Net MWe):

"#^

10. Reasons For Restrictions,if Any:

O This Month Yr..t o.Da t e Cumulative

11. Ilours in Reporting Period 744 8784 33360
12. Number Of flours Reactor Was Cri:ical 728.92 4734.21 19884.51
13. Reactor Resene Shutdown llours 0

12.32 1129.22

14. Ilours Generator On.Line 724.63 4665.18 19365.38
15. Unit Reserve Shutdown llours 0

0 0

16. Gross Thermal Energy Generated (MWil) 1627206 10361499 42g8,110
17. Gross Electrical Energy Generated (MWil) 559695 3532163 14503931 l
18. Net Electrical Energy Generated (MWil) 531930 3353930 13745570 l
19. Unit Service Factor 97.4%

53.111, 58.057,

20. Unit Availability Factor 97.4%

53.11%

58.05%

21. Unit Capacity Factor (Using MDC Net) 91.43%

48.83%

52.69%

l

22. Umt Capacity Factor (Using DER Net) 86.66%

46.28%

49.94%

23. Unit Forced Outage Rate 0%

6.50%

30.291,

24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):

NONE l

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITI A L CRITICALITY 1/14/77 p

INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPER ATION 3/13/77 (9/77) 81onon gqq

--.n~

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-302 UNI T.NAME FLCPP-3 DATE 1/6/n1 COMP.'.ETED ity

21. W. Culver REPOR T MONTil DFer'm"r' (p.1 of 2)

TELEP110NE (904)795-6486

~.

E E

.! 3

[4 LICCfnec

.E *f, C00se & CorrettIve w

o No.

Date i

3j N

Event

{]

[U$

Action to

]

cIn 353 Repuit #

ui O 5

Present Itecurrence g

O e

o 80-39 801202 S

12.5 B

N/A N/A I!C IITEXCII Reduced power to approximately 640 O'

MWo to clean "D" Waterbox.

U 80-40 801203 S

6.77 B

N/A N/A IIC IITEXCII Reduced power to clean a waterbox.

j W 80-41 801207 S

19.37 B

1 N/A CB MOTORX Shutdown to add oil to reactor coolant

.g.

pump "B" motor and to replace a PI O

PUMPXX Reduced power to work on "A" MFWP.

tube.

80-42 801209 F

11.42 A

N/A N/A CII 80-43 801210 F

36.

A N/A N/A IIC IITEXCII Reduced power to find a saltwater gg leak in "A" waterbox.

t 80-44 801214

-S 13.58 B

N/A N/A IIC

!!TEXCl!

Reduced power to clean "A" waterbox.

Y4W

~b i

1 2

3 4

F: Forced Reason.

Method:

Exhibit G -Instructions S: Scheduled

' A. Equipment Failure (Explam) 1 Manual for Preparation of Data

!! Maintenance of Test 2 Manual Scram.

Entry sheets tor Lsensee C. Ret'ueling 3 Automatic Scram.

Event Repmt (LI:R) h!e(NURIG D Regulatory Restriction 4-Or her i E splain) 0161i E Operator Training & License Examination F Admimstratise '

5 G. Operational Error (Explam)

Eshibo I Same Source 19/77)

!! Other t Explain)

DOCKET NO. 50-302 UNIT SifUTDOWNS AND POWER REDUCTIONS UNI r.N AM E. FLCRP-3 DATE 1/6/81 COUPLETED BY sf M. ma vor REPORT MONTil DECEMBER (p.2 of 2)

TELEPIIONE. (904) 795-6486 "h

~-

  1. I M4 2

754 Licensee 5 -t.,

s%

Cause & Corrective r

N,o.

D.ite g

4 jg$

Event a7 E~j Action to Report #

OT C Present Recurrence

$E 5 5, ={

e v

c 80-45 801221 S

12.27 B

N/A N/A IIC FITEXCH Reduced power to clean "B" waterbox 80-46 801222 s

2.45 B

N/A N/A IIC IITEXCII Reduced power to remove "C" circulat-ing water pump from service so that an acid flush of the bearing could be made.

80-47 801229 F.

9.47 B-N/A N/A HC IITEXCII Reduced power to clean waterboxer.,

80-48 801230 F

33.57-A

'N/A N/A HC.

FITEXCII Reduced power to find a saltwater leak in "A" waterbox.

U l

U gi s

(,

a

/. 2?,ET S cd W

~

'1 4

b F:! Forced -

Reason:

Method:

Exlubit G Instructions

. S: Sched uled.

A Equipment Failure (Esplainf I Manual for Preparation of Data B. Maintenance of Test 2-Manual Sera m.

Entry Sheets for Lrcensee C Refueling 1 Automatic Seram.

Event Report i LER) File (NURI G-D Regulatory Restrictior..

4-Other ( E xplain )

0161l E-Operato Training & License Examination F Adm:nierative 5

G Operattunal Error (Explam)

Exhibii 1 Same Source (9/77)

I! Other iEsplain)

AVERAGE DAILY UNIT POWER LEVEL o.s.

O DOCKET NO. 50-302 UNIT FLCRP-3 DATE 1/6/81 M. W. Culver CO\\lPLETED BY TELEP110NE (904)795-6486 MONTH DECEMBER DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe. Net)

(MWe. Net) 763

781, g

2 755 18 792 3

677 19 760 4

731 20 776 801 5

2g 676 6

759 22 767 7

703 23 779 142 785 8

24 9

740 25 781 10 649 26 833 11 567 27 742 12 650 2g 785 783 691 13 39 14 686-30 646 15 798 3l 618 16 749 INSTRUCTIONS On this format. list the aserage daily unit power levelin MWe Net for each day in the reportinF inonth. Compute to the nearest whole rnegawatt.

r (9 /77 )

~_

^

MONTilLY OPERATIONAL SMD!ARY STATDIENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 1/7/81 COMPLETED BY M.W. Culver TELEPHONE (904) 795-6486 l

MONTH DECEMBER SMDIARY STATDIENT:

This month's operation included one scheduled outage, five scheduled power reductions and four forced power reductions.

,