air.
Infiltration through these openings will be assisted by the " pumping action" resulting from elevator travel.
f.
Radiation shielding of the control room has been analyzed in the FSAR and in Carolina Power & Light (CP&L) Company's December 1979 submittal in response to NUREG-0578 Item 2.1.6.b.
Additional analyses described in Section 5.0 of this report confirmed the adequacy of previous calculations.
4.3 Results Differences between the design of Brunswick'J control room ventila-tion system and current NRC criteria set forth in Standard Rev'iew Plan 6.4 are detailed in Appendix A.
In addition, the following areas were identified as concerns:
a.
One door of the mechanical equipment room was found ajar and one was found off its hinges.
b.
Because the cable access ways potentially communicate with the outside, these areas may not be suitable for storage of emergency food supplies or breathing gear.
c.
Ducting in the emergency filter system was found to have been poorly maintained.
(
I l
d.
Two unsealed penetrations were found in the control build-ing floor.
One was located in the Unit 2 cable access way and consisted of an open, 2-inch diameter pipe.
The other was located in the washroom and consisted of an an-nular gap between a 4-inch diameter cutout and a 2-inch diameter pipe passing through the cutout.
This condition should be checked against fire protection requirements.
i e.
Several Engineering Work Requests pertaining to the control room ventilation system were identified as being unresolved.
f 4-7 l
g } g - 7,g y 4
NUS CCRPCAATICN
(
05 On Control Room S
and Interconnecting Space Volume = 298650 ft3 Og i
03 l
Filter d
01 Dunng Normal Operation C6 Curing Isolated Operation
- ** "9 Ventilatica Flow, Oi Normal isolated (chiorine) 3 Flow 'd/.i.;..
Flow ft / min l
01 2,000 0
02 40,000 40,000 03 40,000 40,000 04 37,728 37,728 05 2.272 1,372 06 0
1,100 09 272 272 Figure 6-1.
Simplified Brunswick Control Room Ventilation System 6-9
.. - _