d December 15, 1980 dd FILE:
NG-3513 (R)
SERIAL:
NO-80-1784 Mr. James P. O'Reilly, Director U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, GA 30303 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET N04ff0-26_1 J' LICENSE NO. DPR-23 SUPPLEMENTAL RESPONSE TO IE BULLETIN 80-15
Dear Mr. O'Reilly:
In the initial response to IE Bulletin 80-15, Carolina Power &
Light Company committed under item three to conduct a test to verify operability of the Emergency Notification System (ENS) following a loss o~ off-site power. The ENS is powered from the emergency bus of Unit No.
1, which has an engine driven emergency generator for automatic backup power.
Due to a mechanical failure of the starting components of the Unit No. 1 emergency generator, the test could not be conducted as scheduled, although the generator had been tested successfully the previous week. The repairs could not be completed before the scheduled l
outage ended, and the unit was returned to service.
i l
A test procedure verifying ENS operability has been developed l
and will be performed as soon as practicable depending on operating conditions, but no later than January 1, 1981.
l l
13:is change in schedule was discussed with s aur Mr. Austin Hardin un November 24, 1980.
l l
l l
Ih) 8101200 g)gq
Mr. James P. O'Reilly Nov o
If you have any questions, please contact my staff.
Yours very truly, B
J. Furr Vic President Nuclear Operations RSM:DCS:ejj*