Suppl Response to IE Bulletin 80-15 Re Emergency Notification Sys Operability Following Loss of Offsite Power.Test to Be Performed No Later than 810101
ML20002C889
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 12/15/1980
From: Furr B
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-80-15, NO-80-1784, NUDOCS 8101120289
Download: ML20002C889 (2)


Text

f y :

d December 15, 1980 '

dd FILE: NG-3513 (R) SERIAL: NO-80-1784 Mr. James P. O'Reilly, Director U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, GA 30303 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET N04ff0-26_1 J' LICENSE NO. DPR-23 SUPPLEMENTAL RESPONSE TO IE BULLETIN 80-15

Dear Mr. O'Reilly:

In the initial response to IE Bulletin 80-15, Carolina Power &

Light Company committed under item three to conduct a test to verify operability of the Emergency Notification System (ENS) following a loss o~ off-site power. The ENS is powered from the emergency bus of Unit No. 1, which has an engine driven emergency generator for automatic backup power.

Due to a mechanical failure of the starting components of the Unit No. 1 emergency generator, the test could not be conducted as scheduled, although the generator had been tested successfully the previous week. The repairs could not be completed before the scheduled l

outage ended, and the unit was returned to service.

i l A test procedure verifying ENS operability has been developed l and will be performed as soon as practicable depending on operating conditions, but no later than January 1, 1981.

l l 13:is change in schedule was discussed with s aur Mr. Austin Hardin un November 24, 1980.

l l

l l

Ih) 8101200 g)gq

Mr. James P. O'Reilly Nov o

If you have any questions, please contact my staff.

Yours very truly, B J. Furr Vic President Nuclear Operations RSM:DCS:ejj*

c: Mr. V. Stello I

l l

l 1

l l

l 1