ML20002C831

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs 6.4 & 6.5 for Training, & Review & Audit,Respectively
ML20002C831
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 05/04/1978
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML20002C830 List:
References
NUDOCS 8101120108
Download: ML20002C831 (3)


Text

______.. _ _

Figure 6.2-2 CONSUMERS POWER COMPANY

\\

BIG ROCK POINT ORGANIZATION QA ADMIN 4

OFF-SITE PLANT SUPERINTENDENT g

PLANT Q

l REVIEW C)Q COMMITTEE QA SUPT I

I I

OPERATIONS & MAINTENANC E PERSONNEL TECHNICAL SUPERINTENDENT (a)

DIRECTOR ENGINEUR i

l

^

l l

SUPERVISOR TECHNICAL SUPERINTENDENT TRAINING MAINTENANCE HEALTH l

C00RDINATOF OPERATIONS ENGINEER PHYSICIST SECURITY QC SUPERVISOR ENGINEERS SUPV SOL ( b )

SUPERVISOR I

MAINTENANCE CHEM & RAD l

PLANT SHIFT SCHEDULING PROT SUPV TECHNOLOGISTS OC TRAINING INSTRUCTOR SUPERVISORS COORDINATOR INSPECTOR i

SOL REACTOR I

I CHEM & RAD PROT ENGINEER OPERATORS MAINTENANCE I& C TECHNICIANS SUPERVISOR SUPERVISOR I

l l

ENGINEER ASSISTANT ASSISTANT I & C MAINTENANCE SUPERVISOR SUPERVISOR i

I

~

REPAIRMEN TECHNI ANS SOL - Senior Operntor Licensee (s) '1he Operations & Maintenance Superintendent need not holo nn SOL provided he meets the other requi rements of 6.31 of these specifications and the position of " Operations Supervisor" is filled. Under these conditions, the Opern-tions Supervisor shall be responsible for di recting the activities of licensed operators.

i (b) This position need not be filled if the Operations & Maintenance Superintendent F olds nn SOL.

i 105

a 6.14 TRAINING 6.! 1 A retraining and replacement training program for the plant staff shall be maintained under 4

the direction of the Plant Superintendent and shall meet or exceed the requirements and recommendations of Section '5 5 of ANSI N18.1-1971 and Appendix "A" of 10 CFR, Part 55 6. 14. 2 A training program for the Fire Brigade shall be maintained under the direction' of the Plant Training Coordinator and shall meet or exceed the requirements of Section 27 of the NFPA Code-1975 except for Fire Brigade training sessions which shall be held at least quarterly.

6.5 REVIEW AND AUDIT 6.5.1 PLANT REVIEW COMMITTEE (PRC) 6.5.1.1 The Plant Review Committee (PRC) shall function to advise the Plant Superintendent on all matters related to nuclear safety.

6.5 1.2 COMPOSITION The PRC shall be composed of the'.

Chairman:

Plant Superintendent Member:

Operations and Maintenance Superint endent Member:

Technical Superintendent Member:

Operations Supervisor Member:

Instrument and Control Supervisor Member:

Reactor Engineer Member:

Health Physicist Member:

Shift Supervisor Member:

Maintenance Engineer 6.5.1.3 ALTERNATES Alternate members shall be appointed in writing by the PRC Chairman to serve on a tempicary

~

~

basis; however, no more than two a'.ternates shall participate in PRC activities at any one time.

Amendrant No. $,12, ZT 107

Of hf f

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DISTRIBUTION FOR INCOMING MATERIAL 50-155 REC: ZIEHANN D L ORG: 155 DOCDATE: 05/04/7e NRC CONSUMERS PWR DATE RCVD: 05/08/78 DOCTYPE: LETTER NOTARIZED: YES COPIES RECEIVED SUDJECT:

LTR 3 ENCL 40 FORlJARDING LIC NO DPR-6 APPL FOR AMEND: TECH SPEC FROPOSED CHANGE CONCERNING PROPOSED ORGANIZATION CHANGES TO SUBJCCT FACILITY STAFF.

NOTARIZED 05/04/70.

W/ATT.

PLANT NAME: BIG ROCK PT REVIEWER INITIAL:

XJM DISTRIBUTOR INITIAL: g o****************

DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ******************

GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.

(DISTRIBUTION CODE A001)

FOR ACT ION:

BR CHIEF ZIEHANN**W/7 ENCL

-e

-4 INTERNAL:

RE FIL E** '/ENLL NRC PDR**W/ ENCL I

~E**U75 ENCL OELD**LTR ONLY HANAUER**W/ ENCL CHECK ++W/ ENCL EISENNUT**W/ ENCL SHAO**W/ ENCL BAER*+W/ ENCL BUTLER **W/ ENCL EEB**W/ ENCL J COLLINS **W./ ENCL J.

MCGOUGH**W/ ENCL

._X TERNAL :

LPDR'S CHARLEVOIX. MI**W/ ENCL TIC +*W/ ENCL NSIC**W/ ENCL ACRS CAT B**W/16 ENCL G

CHECK NBR: 64,116 AMOUNT:

$1.200.00 G

CHECK AND COPY OF TRANSMITTAL LTR ADVANCED TO W.

MILLER (LFMD) (05/03/78) UPON RECIEPT G$ $ $ $$ $ $ $$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $$ $ $ $ $ $ $$ $ $$ $ $ $ $

DISTRICUTION:

LTR 40 ENCL 39 CONTROL NBR:

701 O:. 56 SIZE: 1P+2P+2P o*o********************************

THE END