ML20002C664
| ML20002C664 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 11/25/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20002C665 | List: |
| References | |
| NUDOCS 8101100682 | |
| Download: ML20002C664 (2) | |
See also: IR 05000321/1980043
Text
l
[p.R Rf C
o
UNITED STATES
! "
,, ?o
NUCLEAR REGULATORY COMMISSION
, {
t . c. E
REGION il
7
.
,
o
101 MARIETT A ST., N.W., SUIT E 3100
A
,
'
(v j'
ATLANTA, GEORGIA 30303
'~
" " '
Nov 251939
In Reply Refer To:
.' o
i
RII:TDG
-
d
-f,
7 50-321/80-43
_~
p
c
C J0-366/80-43 -
$
'
m
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by T. D. Gibbons of this office on
November 4-7, 1980, of activities authorized by NRC Operating License No. DPR-57
and License No. NFP-5 for the Hatch facility, and to the discussion of our
findings held with M. Manry at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
perconnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any infornation that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to. this office to withhold such information from public disclosure. Any such
application au t include a full r.tatement of the reasons on the basis of which
it is claimed that the informatiot. is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
.-
Should you have any questions concerning this letter, we will be glad to discuss
i
them with you.
Sincerely,
i
.
C. E.' Murphy,M
,
'
l
Reactor Construction and Engineering
i
Support Branch
Enclosure:
(See Page 2)
1
8101100(ED
Q
.
.
e
"
OV25osaa
Georgta Power Company
-2-
.
'
-
.
Enclosure:
Inspection Report Nos. 50-321/80-43
and 50-366/80-43
cc w/ enc 1:
M. Manry, Plant Manager
C. E. Belflower, Site QA Supervisor
W. A. Widner, Vice President and
General Manager-Nuclear Generation
!
$
0 .
0
.---m-
me -
-
1