ML20002C595

From kanterella
Jump to navigation Jump to search
Informs That Util 780407 Inservice Insp Requirements Schedule Acceptable & Consistent W/Code Requirements
ML20002C595
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 04/24/1978
From: Ziemann D
Office of Nuclear Reactor Regulation
To: Bixel D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 8101100538
Download: ML20002C595 (3)


Text

. ____

DISTRIBUTION:

Docket NRC PDR APR 2 ' 1978 Local PDR ORB #2 RDG VStello Docket No. 50-155 BGrimes OELD 01&E(3)

Constrners Power Company DLZiemann ATTN: Mr. David Bixel SJNowicki Nuclear Licensing Administrator HSmith 212 West Michigan Avenue DEisenhut Jackson. Michigan 49201 TBAbernathy JRBuchanan Gentlemen:

ACRS (16)

We have reviewed your letter dateo April 7.1978 which submits your schedule for. inservice inspection requirements at Big Rock Point.

Your schedule date of February 1,1979 for the beginning of the last 40 month period within the second 10 year interval is consistent with code requirements. We find that your proposed dates for sulwitting Technical Specification change requests, description of planned inservice inspection, and start of the last 40 month period to be acceptable.

Sincerely, Origi: n?. S'

  • iy:

De = s L. n...

m Dennis L. Itamann, Chief Operating Reactors Branch 72 Division of Operating Reactors i

cc: See next page i

P00R ORIGINAL l

See previous yellow for concurrences g301100538

^[

4 in. AzM dM ORB #2: DOR D6R:EB/E&PMR:AD/EkP ORB #2iDOR

[edy ESJNowicki:sh #CYCheng BGrMs Di.Ziemann L, Slu i

[ /7 k 4/2.178 g

gyp 4/ i78 4/ /78 ou.,

$v o.....'......

L...

a m c,o ui ii...76, uncu 2.o

t.

Consumers Power Company CC1 Mr. Paul A. Perry, Secretary Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire Consumers Power company 212 West Michigan Avenue Jackson, Michigan 49201 Hunton'& Williams George C. Freeman, RJr., Esquire P. O. Box 1535 Richmond, Virginia 23212 Peter W. Steketee, Esquire 505 Peoples Building Grand Rapids, Michigan 49503 Charlevoix Pcblic Library 107 Clinton Street Charlevoix, Michigan 49720 P00R ORIGINAL 6

+

/

DISTRIBUTION:

Docket APR 2 41978 NRC PDR i

Local PDR I

ORB #2 RDG i

Docket No. 50-155 VStello BGrimes OELD Consumers Power Company 01&E (3) 3 ATTH: Mr. David Etxel DLZiemann i

Nuclear Licensing Administrator SJNowicki i

212 West Michigan Avenue HSmith j

Jackson, Micnigan 49201 DEisenhut TBAbernathy Gentlemen:

JRBuchanan i

ACRS(16) i We have rev*ewed your letter dated April 7,1978 which submits your schedule for inservice inspect' ion requirements at Big Rock Point.

Your schedule date of February 1,1979 for the beginning of the last i

l 40 month inte~rval within the second 10 year period is consistent with 4

code requirements. We find that your proposed dates for sutaittinq Technical Specification change requests, description of planned i

inservice inspection, and start of the last 40 month interval to be acceptable.

l Sincerely.

Origira?. s; e by:

l Dennis L. Siccann Dennis L. Ziemann, Chief Operating Reactors Branch f2 Division of Operating Reactors i

,l cc: See next page i

" ~ 4 WW P00R ORIGINAI.

\\

/

. ric = *-

ORB #2:D0 DOR:EBf DOR!ADI[&P_

ORB!2.: DOL..

l SJNowi ck f'. sh CYCheng BGrides DLZiemann

_[/78 4/20/78 4[t/78 4

4/ /78 l

NRC PORM 318 (9 76) NRCM 0240 W u. a. fovsanusnv enismwe orricas eers-eas4ae

.~