's
(
fiE0}AidM Ne<.gd qh" @p{
t Consumers i
POVlcr Company l
Genere6 offices: 212 West u.cNgen Avenue Jackson. Michegen 4920s. Aree code e17 7es.osso N
c.,
April 7, 1978
{
{ H.
Director, Nuclear Reactor Regulation Att: Mr Dennis L Ziemann, Chief M
g.
a Operating Reactors Branch No 2 g
C.
g US Nuclear Regulatory Commission a
Washington, DC 20555 DOCKETS 50-155 MID 50-255 -
LICENSES DPR-6 AND DPR BIG ROCK POINT MiD PALISADES PLANTS -
FIRE PROTECTION MODIFICATION UPDATES By lette-s dated June 10, 1977, Consumers Power Company submitted tentative schedules for the co=pletion of plant modifications deemed necessary by the Palisades and Big Rock Point Fire Hazards Analysis.
In the forwarding letters for these schedules, a commitment was made to provide an updated project status.
The purpose of this letter is to provide that status.
Attached are the revised Big Rock Point and Palisades Plants fire protection modification status schedules. These schedules reflect the estimated time frames necessary to complete each plant modification committed to in the appli-cable Fire Safety Analysis. As in the past, the schedules are tentative.
They are based on several variables highly susceptible to change including outage times, staff site visits, staff Fire Hazards Analysis review, and procurement lead times. Further, because of the inordinate costs of the project, the sched-ule has been adjusted to allow for NRC staff review of the major modifications after preli=inary design has been completed and prior to becinning final design.
This vill ensure staff approval and acceptance of the modifications and vill al-low for a more efficient allocation of costs in final design and construction.
It should be noted that modifications 6 and 7 for Palisades and modification 9 for Big Rock Point do not have any predicted completion dates. To meet the in-tent of these modifications, Consumers Power Company is considering developing a separate shutdown path, independent of the cable spreading rooms, for both plants. Thus, until preliminary design is completed, the magnitude of the modi-fications is known, and the plant modifications have been reviewed and accepted by the staff, no realistic completion schedule can be promulgated.
D 0
-0 l Aam 5 La
'k he I
William S Skibitsky b
Senior Licensing Engineer Y
N 1 ~.y w CC: JGKeppler, US:mC 8101100 0
PALISADES PLANT MODIFICATIONS Hodification Applicable Fire Areas 1
2 3
h 5
6
'1
~ Sprinkler 3,13,23,28 Conplete April 78 July 78 March 79 'Jan 80 Jan 80 2
Detectors 1,2,3,h,12,14,15 Complete April 78 July 78 April 79 Feb 80--
Feb 80 3
Seal Cable Penetrations 2,3,h,13 Complete April 78 July 78 Sept 78 March 79 April 79 I
k'
' Seal Cable to Conduit 8
Complete April 78 -July 78 Sept 78 March 79 April 79 m Penetrations 5
Fire Barriers 2,10 Complete April 78 July 78 Sept 78 March 79 April 79 i
6 Evaluate & Reroute as 2
Complete Oct 78 July 78 Unknown Unknown Unknown Necessary Control Cables for 1-C & 1-D 7
Evaluate & Reroute as 3,h,1h Complete Oct 78 July 78 Unknown Unknown-Unknown Necessary Load Circuits 1-C & 1-D 8
Install Fire Door & Sill 5
Complete Complete July 78 Complete Sept 78 Oct 78 i
9 Build Fire Enclosure 6
Complete Complete July 78 March 79 Oct 79 Oct 79 10
' Install Fire or Back 1,2,3,4 Complete April 78 July 78 Sept 78 July 79 July 79 Draft Damper 11 Cable Fire Stop 1h Complete April 78 July 78 Sept 78 March 79 April 79
~
Key to Column Numbers:
1-Contract Awarded 2-Preliminary Desigu Complete
_3-NRC Site Visit & Review h-Detail Design Complete 5-Insta11aticn Complete 6-System Operational Revised: 3/30/78
BIG ROCK PLANT MODIFICATIONS lbdification Applicable Fire Areas 1
2 3
4 5
6
,4 1
Seal & Fireproof 5,6,13,21-2h,25,29,37, Complete
!!ny 78 Oct 78 Oct 78 Nov 79' Dec 79 Penetration 41,h2 lt 2
Seal Conduit Penetration 12,21-2h,'26,h1 Complete thy 78 Oct 78 Oct 78 Nov 79 Dec 79 3
Fire Stops on Open Penet/
16,17,37 Complete May 78 Oct 78 Oct 78 Nov 79 Dec 79 Tray h
Seal Cable Tray Penetration 32,35,38 Complete'
!!ay 78 Oct 78 Oct 78 Nov 79 Dec 79 5
Seal 8 Top Wall Partition 26 Complete May 78 Oct 78 oct 78 Nov T9 Dec 79 6
Fire Doors 17 Complete Complete Oct 78 Complete June 78 June 78 7
Detectors 5,6,12,13,29,37,38,h1, Complete May 78 oct 78 April 79 April 80 April 80 h2 8.
Water Spray System 41 Complete May 78 oct 78 March 79 Feb 80
April 80" 9
Alternates to Provide 7,15,29,33,3h,35,37,h1 Complete oct 78 Oct 78 Unknown Unknown Unknown Separation of Circuits 10 Waterproof Cable Splices &
7,33 Complete Sept 78 Oct 78 Sept 78 Dec 78' Dec 78 Conn 11 Splashproor Panels & Cab 15 Complete Complete Oct 78 May 78 July 78' July 78*
l 12 Hose Reel 37,33A Complete Complete Oct 78 March 79 Jan 80**
March 80**
Key to Column Numbers:
'Some work to be ecmpleted during 1978 refueling outage 1-Contract Awarded scheduled to commence in November 1978.
2-Preliminary Design Complete 3-NRC Site Visit & Review "This work must be done during scheduled plant outage.
4-Detail Design Complete 5-Installation Complete
'6-System Operationni Revised: 3/30/78 I
i.
W l5 REGULATORY INFORMATION DISTRIBUTIOt: SYSTEM (RIDS)
DISTRIOUTION FOR INCOMING MATERIAL 50-155/255 REC: ZIEt1 ANN D L ORG: St:1BITSf:Y W S DOCDATE: 04/07/78 NRC CONSUMERS PWR DATE RCVD: 04/11/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED SUDJECT:
LTR 1 ENCL 40 PROVIDINO UPDATED PROJECT STATUS RE YENTATIVE SCHEDULES FOR COMPLETION OF PLANT MODIFICATIONS DEEMED NECESSARY DY SUBJECT FACIL ITY"S FIRE HAZAPDS ANALYSIG.
LJ/ATT SUPPORTING INFO.
PLANT NAME: D10 ROCK PT REVIEWER INITIAL:
XJM PALISADES DISTRIEUTER INITIAL: g oowo*o******r**** DISTRIDUTION OF THIS MATERI AL IS AS FOLLO!4S ******************
FIRE PROTECTION INFORMATION (AFTER ISSUANCE OF OL).
(DICTRIDUTION CODE AGO6)
FOR ACTION:
DR CHIEF ZIEMANN*t<W/3 ENCL INTERNAL.:
EEG F T L E+-*Lt/FM NRC PDR**W/ ENCL I & L*Huz ENCL OELD**LTR ONLY DENAROYAttU/2 ENCL EISENHUT**W/ ENCL BUTLER **tUS ENCL WAME:ACH*
- L4/ ENCL Ft MURANKA t-
- W/ ENCL HANAUER**W/ ENCL EXTERNAL:
LPDR'S CHARLEVOIX, MI * *LJ/ ENCL TIC **W/ ENCL NSIC**W/ ENCL ACRS CAT Dit tW/16 ENCL L902 W4tAMA70e 4,(
gf gue t l DISTRIDU~l ION:
LTR 38 ENCL 37 CONTROL NPR:
76iv O A
- SIZE: IP+1P+IP
!*ocoo******************************
THE END
- 7********************
l P00R ORIGlHAL
_