ML20002C460
| ML20002C460 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/14/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20002C444 | List: |
| References | |
| NUDOCS 8101100331 | |
| Download: ML20002C460 (2) | |
See also: IR 05000348/1980031
Text
f
)
.
i
p recoq'o
j
UNITED STATES
g
1
8
'3 ,7f n
NUCLEAR REGULATORY COMMISSION
l
f
,
l
2
' '/ ~ E
REGION 11
k
N-
101 MARIETTA sT., N.W., sulTE 310o
AT LANT A, GEORGI A 30303
.....
NOV 141980
In Reply Refer To:
RII:WM
50-348/80-31
50-364/80-42
Alabama Power Company
ATIN:
R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by W. H. Miller, Jr. of this office on
October 14-17, 1980, of activities authorized by NRC License No. NPF-2 and
Construction Permit No. CPPR-86 for the Farley facility, and to the discussion
of our findings held with W. G. Hairston at the conclusion of the inspection and
subsequent telephone conversation with 0. D. Kingsley on October 21, 1980.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Two new unresolved items resulted from this inspection and are discussed in the
enclosed report. These items will be examined during subsequent inspections.
Within the scope of this inspection, no items of noncompliance were disclosed.
During the inspection it was found that certain activities under your license
appear to deviate from commitments to the Commission and have safety significance.
This item is identified in the Notice of Deviation enclosed herewith as Appendix A.
Please provide us in writing within 20 days of your receipt of this letter your
comments including a description of corrective actions that have been or will be
taken, corrective actions which will be taken to avoid further deviations, and
the date corrective actions were or will be completed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and th enclosed
inspection report will be placed in the NRC's Public Document Roon..
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
<
serirate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
FiC
)
.
NOV 141980
Alabama Power Company
-2-
'
Should you have n y questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.e
- u7
C. E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-348/80-31
and 50-364/80-42
cc w/ enc 1:
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr., Senior Vice President
H. O. Thrash, Manager-Nuclear Generation
O. D. Kingsley, Jr. , Manager, Nuclear Engineering
and Technical Services
J. W. McGowan, Manager-Operations
Quality Assurance
W. G. Hairston, III, Plant Manager
W. C. Petty, Manager-Quality Assurance
(Design and Construction)
R. E. Hollands, Jr., QA Supervisor