Forwards IE Insp Repts 50-348/80-31 & 50-364/80-42 on 801014-17 & Notice of Deviation
ML20002C460
Person / Time
Site: Farley  
Issue date: 11/14/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20002C444 List:
References
NUDOCS 8101100331
Download: ML20002C460 (2)


See also: IR 05000348/1980031

Text

f

)

.

i

p recoq'o

j

UNITED STATES

g

1

8

'3 ,7f n

NUCLEAR REGULATORY COMMISSION

l

f

,

l

2

' '/ ~ E

REGION 11

k

N-

101 MARIETTA sT., N.W., sulTE 310o

AT LANT A, GEORGI A 30303

.....

NOV 141980

In Reply Refer To:

RII:WM

50-348/80-31

50-364/80-42

Alabama Power Company

ATIN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by W. H. Miller, Jr. of this office on

October 14-17, 1980, of activities authorized by NRC License No. NPF-2 and

Construction Permit No. CPPR-86 for the Farley facility, and to the discussion

of our findings held with W. G. Hairston at the conclusion of the inspection and

subsequent telephone conversation with 0. D. Kingsley on October 21, 1980.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Two new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

Within the scope of this inspection, no items of noncompliance were disclosed.

During the inspection it was found that certain activities under your license

appear to deviate from commitments to the Commission and have safety significance.

This item is identified in the Notice of Deviation enclosed herewith as Appendix A.

Please provide us in writing within 20 days of your receipt of this letter your

comments including a description of corrective actions that have been or will be

taken, corrective actions which will be taken to avoid further deviations, and

the date corrective actions were or will be completed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and th enclosed

inspection report will be placed in the NRC's Public Document Roon..

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

<

serirate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

FiC

)

.

NOV 141980

Alabama Power Company

-2-

'

Should you have n y questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.e

- u7

C. E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-348/80-31

and 50-364/80-42

cc w/ enc 1:

W. O. Whitt, Executive Vice President

F. L. Clayton, Jr., Senior Vice President

H. O. Thrash, Manager-Nuclear Generation

O. D. Kingsley, Jr. , Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-Operations

Quality Assurance

W. G. Hairston, III, Plant Manager

W. C. Petty, Manager-Quality Assurance

(Design and Construction)

R. E. Hollands, Jr., QA Supervisor

_ . . . _ _

_.

.,

_ _ _ _ . _ .

.

_ _ - , - .__ _

, _ . - , -

_ _ . . . _ - - - _ _

. . _ _ . _