Text

-

/ 4 C-

<

umrE0 stares

[

1

NUCLEAR REGULATORY COMMISSION

-

,;

J

-

--

' ^^g/ /,j

AEGION IV

%

-

5

1

5119Y AN PLAZA ORIVE SU:TE 1XC

.

. . . . -'

A All?.GTON Texas 75011

-

3

In Reply Refer To:

November 19, 1980

8

.

RIV

o

' -

Docket No. 50 445/Rpt. 80-23

%

.,

50 JJ6/Rpt. 80-23

Gs

'

_. a

3

g

^

M E5

4

R5

~M

Texas Utilities Generating Company

$

b

ATTN: Mr. R. J. Gary, Executive Vi:e

President and General Manager

2001 Bryan Tower

Dallas, Texas 75201

Gentlemen:

This refers to tne inspection conducted by our Resid. : Reactor Inspector, Mr.

R. G. Taylor, during October 1980, of activities authorized by NRC Construction

Permits No. CPPR-126 and 127 for the Comanche Peak facility, Units No.1 and 2,

and to the discussion of oar findings with Mr. R. G. Tolson and other members of

your staff at the conclusion of the inspection.

Areas examined during the inscection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative recorcs, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with Appendix B to 10 CFR 50 of the NRC Regulation,

" Quality Assurance Criteria for Nuclear Power Plants." The Notice of Violation

for the item of noncomoliance reported in the enclosed inspection report was

forwardec to you by our letter dated October 16, 1980; therefore, this letter

does not require further response regarding this matter.

We have also examined actions you have taken with regard to previously identified

inspection findings. The status of these items is identified in paragraph 2 of

the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Feceral Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If the

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20 days

of the date of this letter, requesting that such information be withheld from

public disclosure. The application must include a full statement of the reasons

wny it is claimed that the information is proprietary. The application should

be prepared so that any proprietary information identified is contained in an

enclosure to tne application, since the a; plication without the enclosure will

also be placed in the Public Document Room.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

8101 10005-

L

-

-

-

9

- - -

-

. .

- - -

-

- - - -

i

9

Texas Utilities Generating Company

2

November 19, 1980

Should you hav a any questions concerning this inspection, we will be pleased

to discuss theia with you.

Sincerely,

'

_ -

--

.

W. C. Seidle, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection Report No. 50-445/80-23

50-446/80-23

cc: w/e-closure

Texas U..lities Generating Company

ATTN: Mr. H. C. Schmidt, Project Manager

2001 Bryan Tower

Dallas, Texas 75201

,

.

.

. -

- -

-

- -

- .

-

-

- -

. -

--

- - -

-

-

-.

- -

- - -

.

.

-

. . - -