Text
-
/ 4 C-
<
umrE0 stares
[
1
NUCLEAR REGULATORY COMMISSION
-
,;
J
-
--
' ^^g/ /,j
AEGION IV
%
-
5
1
5119Y AN PLAZA ORIVE SU:TE 1XC
.
. . . . -'
A All?.GTON Texas 75011
-
3
In Reply Refer To:
November 19, 1980
8
.
RIV
o
' -
Docket No. 50 445/Rpt. 80-23
%
.,
50 JJ6/Rpt. 80-23
Gs
'
_. a
3
g
^
M E5
- 4
R5
~M
Texas Utilities Generating Company
$
b
ATTN: Mr. R. J. Gary, Executive Vi:e
President and General Manager
2001 Bryan Tower
Dallas, Texas 75201
Gentlemen:
This refers to tne inspection conducted by our Resid. : Reactor Inspector, Mr.
R. G. Taylor, during October 1980, of activities authorized by NRC Construction
Permits No. CPPR-126 and 127 for the Comanche Peak facility, Units No.1 and 2,
and to the discussion of oar findings with Mr. R. G. Tolson and other members of
your staff at the conclusion of the inspection.
Areas examined during the inscection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative recorcs, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with Appendix B to 10 CFR 50 of the NRC Regulation,
" Quality Assurance Criteria for Nuclear Power Plants." The Notice of Violation
for the item of noncomoliance reported in the enclosed inspection report was
forwardec to you by our letter dated October 16, 1980; therefore, this letter
does not require further response regarding this matter.
We have also examined actions you have taken with regard to previously identified
inspection findings. The status of these items is identified in paragraph 2 of
the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Feceral Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If the
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 20 days
of the date of this letter, requesting that such information be withheld from
public disclosure. The application must include a full statement of the reasons
wny it is claimed that the information is proprietary. The application should
be prepared so that any proprietary information identified is contained in an
enclosure to tne application, since the a; plication without the enclosure will
also be placed in the Public Document Room.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
8101 10005-
L
-
-
-
9
- - -
-
. .
- - -
-
- - - -
i
9
Texas Utilities Generating Company
2
November 19, 1980
Should you hav a any questions concerning this inspection, we will be pleased
to discuss theia with you.
Sincerely,
'
_ -
--
.
W. C. Seidle, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection Report No. 50-445/80-23
50-446/80-23
cc: w/e-closure
Texas U..lities Generating Company
ATTN: Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas 75201
,
.
.
. -
- -
-
- -
- .
-
-
- -
. -
--
- - -
-
-
-.
- -
- - -
.
.
-
. . - -