ML20002B833

From kanterella
Jump to navigation Jump to search
Submits Daily Notes for 801223.Status of Facilities in Five IE Regions Encl
ML20002B833
Person / Time
Site: Millstone, Dresden, Rancho Seco  Dominion icon.png
Issue date: 12/24/1980
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Ahearne J, Gilinsky V, Hendrie J
NRC COMMISSION (OCM)
References
NUDOCS 8101060946
Download: ML20002B833 (3)


Text

.-

Co M M ' S S IO~d 7RA $*r"

?.

UNITED STATE *

'y

,e(

g NUCLEAR REGULATORY COMMISSION E - ". U' "E

W ASHINGTON. D. C. 20$65 g

f 9

"%.'..#.. /

December 24, 1980 MEMORANDUM FOR: Chaiman Ahearne Comissioner Gilinsky Comisf oner Hendrie Comissioner Bradford FROM:

William J. Dircks. Executive Director for Operations

SUBJECT:

DAILY STAFF NOTES, DECEMBET 23, 1980 1.E.

1.

Babcock and Wilcox Company. Plutonium Facility - Fire Sprinkling System Malfunction,(PNO-I-80-177). (l2/23/80) l 2.

Rancho Seco Nuclear Power Plant - Activation of Local Emergency Plan at Rancho Seco, (PNO-V-80-81). (12/23/80) 3.

Northeast Nuclear Energy Company. Millstone Station, Hartford, Conn. -

Traffic Accident Involving Shipment cf Low Level Radioactive Waste, (PNO-I-80-178).

I i

4.

UNC Recovery Systems, Wood River Junction, R. I. - Pemission Granted to l

UNC Recovery Systems to Ship Non-lagoon Waste to Barnwell, South Carolina for Burial, (PNO-I-80-179).

5.

Dresden Nuclear Power Station Unit 3 (comonwealth Edison Co.) - Exceeding Te:Snical Specification L.C.O. for Prime y Containment. HPCI, and Isolation Condenser Wnile Shut Down, (PNO-III-80-234).

2 a

l

?

l

s

.l l

's:

-h5 4

8101060 %

REGION I PLANT STATUS-12/23/80 PLANT NAME PLANT STATUS REASON OR COMMENT RESTART

________________________% POWER __DOWN_______

_______________________DATE__

BEAVER VALLEY 1 X

REPAIR PRESSURIZER SAFETY 1

VALVES CALVERT CLIFFS 1 I

X

DOING LOW POWER PHYSICS TESTS

._CALVFRI.CL.IFFS 2 61

- " TOASTINGDOWN FITZPATRICK

100 OINNA
100 HADDAM NECK
100 INDIAN POINT 2 X
REPAIR FAN COOLERS 6/G1 INDIAN POINT 2 75

! INCREASING TO FULL POWER MAINE YANKEE 97 MILLSTONE 1 X

! DEFUELED 1/30 MILLSTONE 2 100 NINE MILE POINT 1 80 RETURNING TO POWER OYSTER CREEK 92

CONDENSATE DEMINERALIZE'R DP PEACH BOTTOM 2 99 1

+ PEACH BOTTOM 3 79 i

! RETURNING TO POWER FROM OUTAGE oILGRIM 1 100 SALEM i X

DOING CORE PHYSICS TESTS
12/30 SALEM 2 i

X

AWAITING LICENSE THREE MILE ISLAND 1 X
NRC ORDER THREE MILE ISLAND 2 1

X

NRC ORDER VERMONT YANKEE X
PREPARING TO RESTART
12/26 YANKEE ROWE
100 REGION II PLANT STATUS-12/23/80 PLANT NAME PLANT STATUS REASON OR COMMENT RESTART

_____/. POWER __DOWN__ __ _____-

___ ___DATE__

BROWNS FERRY 1 l

99 i

PROWNS FERRY 2 99 SROWNS FERRY 3 X

! REFUELING 1/9 BRUNSWICK 1 86

CONDENSER VACUUM PROBLEMS eBRUNSWICK 2 51 CONDENSER VACUUM PROBLEMS CRYSTAL RIVER *3
100 FARLEY 1 X

REFUELING INDEF HATCH I 80

ADMINISTRATIVE LIMIT HATLH 2 X
REFUELING 2/15 l NORTH ANNA 1 60

! COAST DOWN l NORTH ANNA 2

100 l OCONEE 1

! 100 OCONEE 2

100

! OCONEE 3 X

REFUELING 2/11 i

POBINSON 2

100 i*?EOUOYAH 1 50 "A" MAIN FEEDWATER PUMP IN MAINTENANCE l ST. LUCIE 1
100 I

SURRY 1 X

! S.

G.

REPLACEMENT 8/81 l $URRY 2

100 i TURKEY POINT 3

! 100

' TURKEY POINT 4 X

REFUELING 1/11 l

l

--~

REGION III PLANT STATUS-12/23/80 PLANT'NAME PLANT STATUS REASON OR COMMENT; RESTART

________________________% POWER __DOWN____________________________________DATE__

BIG ROCK POINT X

REFUELING 1/91 COOK 1 1 100 I

COOK 2

100 DAVIS-BESSE 1 55
WORK COMPLETE ON FW PUMPS DRESDEN 1 X
CHEMICAL CLEANING INDEF DRESDEN 2 45
COASTDOWN DRESDEN 3 X
MODIFICATION DUANE ARNOLD 98 KEWAUNEE
100 LACROSSE X

REFUELING

! INDEF LASALLE X

AWAITING LICENSE MONTICELLO

100
  1. PALISADES X
REACTOR TRIP DUE TO TURBINE REHEAT VALVE CLOSURE POINT BEACH 1 X
REFUELING
12/OS POINT BEACH 2

! 100 PRAIRIE ISLAND 1 i 100 PRAIRIE ISLAND '

100 QUAD CITIES 1 54

HOLDING -DOING CORE PHYSICS TESTS QUAD CITIES 2 97 ZION 1 l

97 ZION 2 94 LIMITED BY LOW PRESSURE TURBINE REGION IV PLANT CTATUS-12/23/90 PLANT NAME PLANT STATUS REA?ON OR COMMENT RESTAR1

________________________% POWER __DOWN____________________________________DATE_.

l ARKANSAS 1 72

THREE PUMP OPERATION 1

ARKANSAS '

S4

SODIUM IN CONDENSATE COOPER 98 FORT CALHOUN 75 ADMINISTRATIVE CONTROL (FUEL i

l-CONSERVATION) l VRAIN 69

70% POWER LIi1IT FORT ST.

REGION V PLANT STATUS-12/23/80 t _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - - - -

i PLANT NAME PLANT STATUS REASON OR COMMENT RESTART

________________________% POWER __DOWN____-

==__________________________DATE_

DIABLO CANYON X

AWAITING LICENSE RANCHO SECO 100 l

SAN ONOFRE X

SG REPAIRS 4/u

' TROJAN

100
  • - REASON OR COMMENT'HAS CHANGED IN PAST 24 HOURS 0 - REACTOR SCRAM WITHIN PAST 24 HOURS NOTE - REACTOR STATUS DATA COLLECTED BETWEEN l

6 A.

M.

AND 8 A.

M.

EACH DAY EXCEPT HOLIDAYS AND WEEKENDS

,m

,